| Plan Review Stops For Permit 17050838 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2017-05-25 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2017-05-25 |
Time |
17:30 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2017-05-25 |
Time |
16:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2017-05-31 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2017-05-31 |
Time |
13:56 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2017-05-31 |
Time |
13:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2017-05-22 |
|
|
Cont ID |
|
| Sent By |
scaldero |
Date |
2017-05-22 |
Time |
09:44 |
Rev Time |
0.00 |
| Received By |
scaldero |
Date |
2017-05-22 |
Time |
09:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2017-06-23 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-06-23 |
Time |
09:07 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-06-23 |
Time |
09:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2017-06-14 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-06-14 |
Time |
09:13 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-06-14 |
Time |
09:13 |
Sent To |
|
|
| Notes |
| 2017-06-14 09:19:26 | 1ST REVIEW: FBC 2014 5TH EDITION | | | | | | PLUMBING COMMENTS: | | | | | | 1. SHT. 2PS1-1 THE GAS RISER DIAGRAM SHOWS A 5LB SYSTEM | | | THE SIZING TABLES THAT WERE LISTED ARE 2LB SYSTEMS | | | PLEASE CLARIFY WHAT IT IS A 5LB OR 2LB SYSTEM. PER WPB | | | AMEN TO FBC 107.2.1 | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2017-06-23 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2017-06-23 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-06-08 |
Time |
14:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2017-06-02 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2017-06-02 |
Time |
07:52 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2017-05-18 |
Time |
09:42 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2017-06-15 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-06-15 |
Time |
14:43 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-06-15 |
Time |
13:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2017-05-24 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-05-24 |
Time |
11:49 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-05-24 |
Time |
11:49 |
Sent To |
|
|
| Notes |
| 2017-05-24 11:55:08 | 1ST REVIEW FBC-2014 MECHANICAL | | | REVISION #17050838 | | | MASTER #15120536 | | | 5/24/17 | | | | | | RESULTS: DENIED. | | | | | | 1) SHEET M0.2: PLEASE ADD THE BDC ROOM TO THE OUTDOOR | | | AIR CALCULATIONS TABLE. | | | | | | 2) M1.1: PROVIDE STRUCTURAL DETAILS FOR INSTALLATION OF | | | THE NEW CONDENSER PAD AND CONDENSERS- SECTION 301.15. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
N |
Date |
2017-06-14 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-06-14 |
Time |
09:13 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-06-14 |
Time |
09:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2017-05-23 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-05-23 |
Time |
13:53 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-05-23 |
Time |
13:53 |
Sent To |
|
|
| Notes |
| 2017-05-23 13:55:43 | 1ST REVIEW: FBC 2014 5TH EDITION | | | | | | PLUMBING COMMENTS: | | | | | | 1, PLEASE PROVIDE A NARRATIVE FOR PLUMBING REVIONS. PER | | | WPB AMEND TO FBC 107.2.1 | | | | | | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED | | | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID | | | THE PREVIOUSLY REVIEWED SHEETS. | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2017-06-23 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2017-06-23 |
Time |
09:51 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-06-23 |
Time |
09:51 |
Sent To |
|
|
| Notes |
| 2017-06-23 09:10:19 | 6/23/17 GAS AND PLUMB OK /GPJ | | 2017-06-15 14:44:09 | MECH DIG/SIGS VERIFIED- CCOLE 6/15/17 | | 2017-06-02 08:53:17 | ELECTRIC SHEETS ELECTRONICALLY SEALED 6/2/17 JLEAHY | | 2017-05-25 17:28:47 | ARCHITECTURAL SHEETS ELECTTRONICALLY SEALED. 5/25/17 J. | | | WITMER |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2017-06-16 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2017-06-16 |
Time |
15:02 |
Rev Time |
0.75 |
| Received By |
eschneid |
Date |
2017-06-16 |
Time |
15:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2017-05-30 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2017-05-30 |
Time |
16:55 |
Rev Time |
1.50 |
| Received By |
eschneid |
Date |
2017-05-30 |
Time |
16:55 |
Sent To |
|
|
| Notes |
| 2017-05-30 16:57:14 | FAILED | | | | | | 1) SHEET M1.1 SHOWS CONDENSING UNITS ON THE GROUND | | | LEVEL. PROVIDE THE SITE PLAN SHOWING WHERE THESE UNITS | | | AND THE PAD ARE LOCATED IN RELATIONSHIP TO THE BUILDING | | | AND DRIVEWAY CURB (INCLUDE DIMENSIONS). | | | | | | 2) SHEETS PS1.1, PLUMBING SITE PLAN, AND ES1.1, | | | ELECTRIC SITE PLAN DO NOT SHOW THE ACCURATE SITE PLAN | | | FOR THE NEW GENERATOR, ATS AND TRANSFORMER LOCATIONS. | | | THE GAS RISER AND THE FPL LINES SHALL BE CLEARLY SHOWN | | | OUTSIDE OF THE REQUIRED EIGHT (8) FOOT LANDSCAPE | | | BUFFER. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446 | | | [email protected] |
|
|