Plan Review Details - Permit 17050838
Plan Review Stops For Permit 17050838
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-05-25 Cont ID  
Sent By jwitmer Date 2017-05-25 Time 17:30 Rev Time 0.00
Received By jwitmer Date 2017-05-25 Time 16:43 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-05-31 Cont ID  
Sent By jleahy Date 2017-05-31 Time 13:56 Rev Time 0.00
Received By jleahy Date 2017-05-31 Time 13:56 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2017-05-22 Cont ID  
Sent By scaldero Date 2017-05-22 Time 09:44 Rev Time 0.00
Received By scaldero Date 2017-05-22 Time 09:31 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2017-06-23 Cont ID  
Sent By gjohnson Date 2017-06-23 Time 09:07 Rev Time 0.00
Received By gjohnson Date 2017-06-23 Time 09:07 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-06-14 Cont ID  
Sent By gjohnson Date 2017-06-14 Time 09:13 Rev Time 0.00
Received By gjohnson Date 2017-06-14 Time 09:13 Sent To  
Notes
2017-06-14 09:19:261ST REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS:
  
 1. SHT. 2PS1-1 THE GAS RISER DIAGRAM SHOWS A 5LB SYSTEM
 THE SIZING TABLES THAT WERE LISTED ARE 2LB SYSTEMS
 PLEASE CLARIFY WHAT IT IS A 5LB OR 2LB SYSTEM. PER WPB
 AMEN TO FBC 107.2.1
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-06-23 Cont ID  
Sent By lmarchan Date 2017-06-23 Time 09:57 Rev Time 0.00
Received By lmarchan Date 2017-06-08 Time 14:22 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-06-02 Cont ID  
Sent By cpuell Date 2017-06-02 Time 07:52 Rev Time 0.00
Received By cpuell Date 2017-05-18 Time 09:42 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2017-06-15 Cont ID  
Sent By ccole Date 2017-06-15 Time 14:43 Rev Time 0.00
Received By ccole Date 2017-06-15 Time 13:05 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2017-05-24 Cont ID  
Sent By ccole Date 2017-05-24 Time 11:49 Rev Time 0.00
Received By ccole Date 2017-05-24 Time 11:49 Sent To  
Notes
2017-05-24 11:55:081ST REVIEW FBC-2014 MECHANICAL
 REVISION #17050838
 MASTER #15120536
 5/24/17
  
 RESULTS: DENIED.
  
 1) SHEET M0.2: PLEASE ADD THE BDC ROOM TO THE OUTDOOR
 AIR CALCULATIONS TABLE.
  
 2) M1.1: PROVIDE STRUCTURAL DETAILS FOR INSTALLATION OF
 THE NEW CONDENSER PAD AND CONDENSERS- SECTION 301.15.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status N Date 2017-06-14 Cont ID  
Sent By gjohnson Date 2017-06-14 Time 09:13 Rev Time 0.00
Received By gjohnson Date 2017-06-14 Time 09:13 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-05-23 Cont ID  
Sent By gjohnson Date 2017-05-23 Time 13:53 Rev Time 0.00
Received By gjohnson Date 2017-05-23 Time 13:53 Sent To  
Notes
2017-05-23 13:55:431ST REVIEW: FBC 2014 5TH EDITION
  
 PLUMBING COMMENTS:
  
 1, PLEASE PROVIDE A NARRATIVE FOR PLUMBING REVIONS. PER
 WPB AMEND TO FBC 107.2.1
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID
 THE PREVIOUSLY REVIEWED SHEETS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2017-06-23 Cont ID  
Sent By lmarchan Date 2017-06-23 Time 09:51 Rev Time 0.00
Received By lmarchan Date 2017-06-23 Time 09:51 Sent To  
Notes
2017-06-23 09:10:196/23/17 GAS AND PLUMB OK /GPJ
2017-06-15 14:44:09MECH DIG/SIGS VERIFIED- CCOLE 6/15/17
2017-06-02 08:53:17ELECTRIC SHEETS ELECTRONICALLY SEALED 6/2/17 JLEAHY
2017-05-25 17:28:47ARCHITECTURAL SHEETS ELECTTRONICALLY SEALED. 5/25/17 J.
 WITMER

Review Stop Z ZONING
Rev No 2 Status P Date 2017-06-16 Cont ID  
Sent By eschneid Date 2017-06-16 Time 15:02 Rev Time 0.75
Received By eschneid Date 2017-06-16 Time 15:02 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2017-05-30 Cont ID  
Sent By eschneid Date 2017-05-30 Time 16:55 Rev Time 1.50
Received By eschneid Date 2017-05-30 Time 16:55 Sent To  
Notes
2017-05-30 16:57:14FAILED
  
 1) SHEET M1.1 SHOWS CONDENSING UNITS ON THE GROUND
 LEVEL. PROVIDE THE SITE PLAN SHOWING WHERE THESE UNITS
 AND THE PAD ARE LOCATED IN RELATIONSHIP TO THE BUILDING
 AND DRIVEWAY CURB (INCLUDE DIMENSIONS).
  
 2) SHEETS PS1.1, PLUMBING SITE PLAN, AND ES1.1,
 ELECTRIC SITE PLAN DO NOT SHOW THE ACCURATE SITE PLAN
 FOR THE NEW GENERATOR, ATS AND TRANSFORMER LOCATIONS.
 THE GAS RISER AND THE FPL LINES SHALL BE CLEARLY SHOWN
 OUTSIDE OF THE REQUIRED EIGHT (8) FOOT LANDSCAPE
 BUFFER.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446
 [email protected]