| 2017-05-17 08:16:44 | JAKE LEAHY |
| | ELECTRICAL PLANS EXAMINER II |
| | 561-805-6713 |
| | [email protected] |
| | |
| | |
| | |
| | VALUE ASSESSED WILL BE $15,000 ELECTRIC SERVICE, PAGE |
| | E-2 NEED TO SHOW WHAT IS NEW AND WHAT IS EXISTING. |
| | |
| | IF ALL NEW OR EXISTING PLEASE STATE. THE NOTES STATE NO |
| | WORK OTHER THAN SERVICE? |
| | |
| | PROVIDE FAULT CURRENT CALCULATION PER 110.24. |
| | |
| | 110.24 AVAILABLE FAULT CURRENT. |
| | (A) FIELD MARKING. SERVICE EQUIPMENT IN OTHER THAN |
| | DWELLING UNITS SHALL BE LEGIBLY MARKED IN THE FIELD |
| | WITH THE |
| | MAXIMUM AVAILABLE FAULT CURRENT. THE FIELD MARKLNG(S) |
| | SHALL |
| | INCLUDE THE DATE THE FAULT-CURRENT CALCULATION WAS |
| | PERFORMED |
| | AND BE OF SUFFICIENT DURABILITY TO WITHSTAND THE |
| | ENVIRONMENT |
| | INVOLVED. |
| | |
| | (B) MODIFICATIONS. WHEN MODIFICATIONS TO THE ELECTRICAL |
| | INSTALLATION OCCUR THAT AFFECT THE MAXIMUM AVAILABLE |
| | FAULT |
| | CURRENT AT THE SERVICE, THE MAXIMUM AVAILABLE FAULT |
| | CURRENT |
| | SHALL BE VERIFIED OR RECALCULATED AS NECESSARY TO |
| | ENSURE THE |
| | SERVICE EQUIPMENT RATINGS ARE SUFTICIENT FOR THE |
| | MAXIMUM |
| | AVAILABLE FAULT CULTENT AT THE LINE TERMINALS OF THE |
| | EQUIPMENT. |
| | THE REQUIRED FIELD MARKING(S) IN LLO.24(A) SHALL BE |
| | ADJUSTED TO |
| | REFLECT THE NEW LEVEL OF MAXIMUM AVAILABLE FAULT |
| | CURRENT |
| | |
| | |
| | 408.4 FIELD IDENTIFICATION REQUIRED. |
| | (B) SOURCE OF SUPPLY. ALL SWITCHBOARDS,SWITEHGEAR, AND |
| | PANELBOARDS SUPPLIED BY A FEEDER(S) IN OTHER THAN ONE- |
| | OR |
| | TWO-FAMILY DWELLINGS SHALL BE MARKED TO INDICATE EACH |
| | DEVICE |
| | OR EQUIPMENT WHERE THE POWER ORIGINATES. |
| | |
| | |
| | NOC REQUIRERD FOR JOB. |