Plan Review Details - Permit 17050436
Plan Review Stops For Permit 17050436
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-05-16 Cont ID  
Sent By rmcdouga Date 2017-05-16 Time 15:07 Rev Time 0.00
Received By rmcdouga Date 2017-05-16 Time 15:07 Sent To E
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-05-17 Cont ID  
Sent By rmcdouga Date 2017-05-17 Time 07:53 Rev Time 0.00
Received By jleahy Date 2017-05-17 Time 07:53 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date 2017-06-06 Time   Rev Time 0.00
Received By cpuell Date 2017-06-02 Time 10:19 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By lmarchan Date 2017-05-09 Time 11:18 Sent To  
Notes
2017-05-11 11:18:40REVISION ROUTED TO RMCDOUGAL

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By ccole Date 2017-06-06 Time 07:57 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2017-05-17 Cont ID  
Sent By rmcdouga Date 2017-05-17 Time 14:37 Rev Time 0.00
Received By ccole Date 2017-05-17 Time 14:37 Sent To  
Notes
2017-05-17 15:07:251ST REVIEW FBC-2014 MECHANICAL
 REVISION PERMIT #17050436
 MASTER #15081154
 5/17/17
  
 1) (AC A-01) HAS BEEN CHANGED TO A 2.0 TON UNIT IN THE
 SCHEDULE (SHEET M101) BUT IS LABELED AS A 4.0 TON UNIT
 ON THE LAYOUT PLAN (M301).
  
 2) M301, UNIT A-1ST LEVEL: SHOW THE CFMS AT EACH SUPPLY
 DIFFUSER AND AND RETURN GRILL.
  
 3) REVISE THE ENERGY CALCULATIONS TO SHOW THE CHANGE IN
 SYSTEMS (AC A0-1) & (AC A0-2) PER THE REVISED SCHEDULE
 ON M101.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved