Plan Review Details - Permit 17041276
Plan Review Stops For Permit 17041276
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2018-05-15 Cont ID  
Sent By skennedy Date 2018-05-15 Time 16:03 Rev Time 0.00
Received By skennedy Date 2018-05-15 Time 16:02 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2018-04-16 Cont ID  
Sent By jgomez Date 2018-04-13 Time 18:59 Rev Time 0.00
Received By jgomez Date 2018-04-11 Time 13:06 Sent To  
Notes
2018-04-11 12:30:152014 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: 17041276
 ADD: 1626 OKEECHOBEE RD.
 CONT: ERETZOR CONSTRUCTION LLC
 TEL: 954-937-7041
 E-MAIL: [email protected]
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 3RD REVIEW
 DATE: WED. APRIL 11/2018
 ACTION: DENIED
  
 4X FEE / NOTICE!!!!! FLORIDA STATUTE 553.80(2)(B).
  
 WITH RESPECT TO EVALUATION OF DESIGN PROFESSIONALS?
 DOCUMENTS, IF A LOCAL GOVERNMENT FINDS IT NECESSARY, IN
 ORDER TO ENFORCE COMPLIANCE WITH THE FLORIDA BUILDING
 CODE AND ISSUE A PERMIT, TO REJECT DESIGN DOCUMENTS
 REQUIRED BY THE CODE THREE OR MORE TIMES FOR FAILURE TO
 CORRECT A CODE VIOLATION SPECIFICALLY AND CONTINUOUSLY
 NOTED IN EACH REJECTION, INCLUDING, BUT NOT LIMITED TO,
 EGRESS, FIRE PROTECTION, STRUCTURAL STABILITY, ENERGY,
 ACCESSSIBILITY, LIGHTING, VENTILATION, ELECTRICAL,
 MECHANICAL, PLUMBING, AND GAS SYSTEMS, OR OTHER
 REQUIREMENTS IDENTIFIED BY RULE OF THE FLORIDA BUILDING
 COMMISSION ADOPTED PURSUANT TO CHAPTER 120, THE LOCAL
 GOVERNMENT SHALL IMPOSE, EACH TIME AFTER THE THIRD SUCH
 REVIEW THE PLANS ARE REJECTED FOR THAT CODE VIOLATION,
 A FEE OF FOUR TIMES THE AMOUNT OF THE PROPORTION OF THE
 PERMIT FEE ATTRIBUTED TO PLANS REVIEW.
  
  
 1) COVERSHEET A-1:
 1A) COMPLIED. LEVEL III ALTERATION LABEL WAS REMOVED.
  
 1B) THIRD REQUEST:
 (1)SEMI-COMPLIED. THE OCCUPANCY AND USE OF THE PROPOSED
 STRUCTURE IS NOT CLEAR AND A THOROUGH REVIEW CAN NOT BE
 ACCOMPLISHED. (SEC. 301.1 FBC-BUILDING). THE BUILDING
 CLASSIFICATION INFORMATION DATED 10-6-17 CALLS FOR R-2
 BOARDING HOUSE, NONTRANSIENT, UP TO 90 DAYS AND WITH A
 MAXIMUM OF 16 RESIDENTS. R-2 OCCUPANCIES ARE PRIMARILY
 PERMANENT IN NATURE AND THE BOARDING HOUSES ARE FOR
 MORE THAN 16 OCCUPANTS. BASED ON THE PREVIOUS PLAN
 REVIEWER'S COMMENTS, IT IS MY UNDERSTANDING THAT THIS
 BUILDING MAY BE USED EITHER AS AN ALCOHOL AND OR DRUG
 CENTER OR GROUP HOME AND BASED ON THE NUMBER OF PEOPLE
 IT FALLS INTO R-4 GROUP. REVISE AS REQUIRED AND CLEARLY
 IDENTIFY WHICH R-4 CATEGORY IS THE BUILDING GOING TO BE
 USED FOR.
  
 (2)DRAWING INDEX DATED 10-9-17 DOESN'T LIST ALL THE
 DRAWINGS SUBMITTED. REVISE AS REQUIRED TO MATCH. (SEC.
 107.2.1 CITY AMENDMENTS).
  
 PREVIOUS COMMENT:
 2ND REQUEST. THE DESIGNER OF RECORD HAS NOT PROVIDED A
 CODE ANALYSIS, PROVIDING THE OCCUPANCY TYPE, USAGE,
 (ALCOHOL AND OR DRUG CENTER, GROUP HOME), THE TYPE OF
 MINIMUM CONSTRUCTION REQUIRED, OR IF FIRE SPRINKLERED.
 NOTE FIRE SPRINKLER PLANS FOR R13 SYSTEM SUBMITTED.
  
  
 2. STILL NO CLARIFIED. SEE RESPONSE TO ITEM #1B) ABOVE.
 REGARDING THE ISSUE ON SHEET A-17 & A-18 STATING THAT
 THIS IS A PRIVATE FACILITY NOT OPEN TO THE GENERAL
 PUBLIC OR RENTED OUT TO THE GENERAL PUBLIC. THE
 ARCHITECT'S RESPONSE IS THAT THIS IS A "BOARDING
 HOUSE". THIS NEEDS TO BE COORDINATED WITH ITEM #1B)
 ABOVE. THE USE AND OCCUPANCY STILL NO CLEAR AND NEED TO
 READ THE DEFINITION OF "BOARDING HOUSE" ON CHAPTER 2 OF
 FBC. THE PROPOSED USE AND OCCUPANCY AND THE PRIVATE
 FACILITY ISSUE NEED TO BE CLEARLY DEFINED FOR PROPER
 PLAN REVIEW.
 ALSO, NOTE ON SHEET A-17 AND A-18 DON'T MATCH. ONE
 STATES FAIR HOUSING ACT AND THE OTHER STATES ADAAG.
 NEED TO COORDINATE AND MAKE SURE CORRECT SECTION IS
 CITED.
  
 PREVIOUS COMMENT:
 OCCUPANCY TYPE 301.1 SHORT TERM FACILITY OR LONG TERM
 FACILITY. PLEASE NOTE ON THE COVERSHEET THERE IS A NOTE
 STATING THIS IS A SHORT TERM FACILITY. WHEN DEFINING
 SHORT TERM THE BUILDING CODE USES 30 DAYS OR LESS FOR
 SHORT TERM (TRANSIENT), LONGER STAYS ARE
 (NON-TRANSIENT). IT APPEARS THIS USAGE IS MORE OF A R4
 FACILITY AN ALCOHOL AND OR DRUG REHAB CENTER WITH
 CONGREGATE CARE FACILITIES, (A BUILDING OR PART THERE
 OF THAT CONTAINS SLEEPING UNITS WHERE THE RESIDENTS
 SHARE BATHROOMS AND OR KITCHEN FACILITIES. THE OTHER
 ISSUE IS WITH THE UNITS CONTAINING 2 BEDROOMS AND 2
 OCCUPANTS PER BEDROOM AND SHARED BATHROOMS AND OR
 KITCHEN FACILITIES THE UNIT ALSO RESEMBLES DORMITORIES!
 PLEASE DECLARE OCCUPANCY AND USAGE. 2014 FBC-B 302.1
 CLASSIFICATION.
  
 THE OTHER ISSUE IS THE NOTE FOUND ON SHEET A-17 & A-18
 THAT THIS BUILDING IS A PRIVATE FACILITY NOT OPEN TO
 THE GENERAL PUBLIC OR RENTED OUT TO THE GENERAL PUBLIC.
 HOW DOES ONE END UP AS A TENANT AT THIS ESTABLISHMENT.
 THE DESIGNER OF RECORD WITH NOT DEFINING THE OCCUPANCY
 TYPE AND USAGE WE CAN NOT DEFINE WHICH THE DESIGNER
 MUST DESIGN TOO, FAIR HOUSING OR THE 2014
 FBC-ACCESSIBILITY CODE, NOT ADAAG.
 NOTE THE FLORIDA ACCESSIBILITY CODE IS BLESSED BY THE
 DEPARTMENT OF JUSTICE, AND A MORE RESTRICTIVE CODE.
 IT IS TRUE YOU MAY NOT REQUIRE AN ELEVATOR BUT DOES NOT
 RELIEVE THE DESIGNER FROM THE DUTY OF VERTICAL
 ACCESSIBILITY, ON THE OTHER HAND IF THIS FACILITY IS
 DETERMINED TO FALL UNDER THE GUIDELINES OF FAIR HOUSING
 THEN THE 2014 FBC FAIR HOUSING ACCESSIBILITY GUIDELINES
 WOULD APPLY. PLEASE DECLARE OCCUPANCY AND USAGE. 2014
 FBC-B 302.1 CLASSIFICATION.
  
  
 3) COMPLIED
  
 4)SEMI-COMPLIED. MISSING DETAILS AND SPECIFICATIONS FOR
 PROTECTION OF OPENINGS AND PENETRATIONS OF RATED WALLS.
  
 PREVIOUS COMMENT:
 FIRE-RESISTANT CONSTRUCTION REQUIREMENTS SHALL INCLUDE
 THE FOLLOWING COMPONENTS:
 FIRE-RESISTANT SEPARATIONS
 FIRE-RESISTANT PROTECTION FOR TYPE OF CONSTRUCTION
 PROTECTION OF OPENINGS AND PENETRATIONS OF RATED WALLS
 FIRE BLOCKING AND DRAFTSTOPPING AND CALCULATED FIRE
 RESISTANCE
  
 5.COMPLIED. FIRE SUPPRESSION SYSTEMS SHALL INCLUDE:
 SCHEMATIC FIRE SPRINKLERS
 STANDPIPES
 PRE-ENGINEERED SYSTEMS
  
 6) COMPLIED. LIFE SAFETY SYSTEMS SHALL BE DETERMINED
 AND SHALL INCLUDE THE FOLLOWING REQUIREMENTS:
 OCCUPANT LOAD AND EGRESS CAPACITIES
  
 7. SEMI-COMPLIED. SECOND FLOOR LIFE SAFETY PLAN IS
 INCOMPLETE. MISSING SMOKE DETECTORS, FIRE RATED WALLS,
 ETC. PROVIDE COMPLETE LIFE SAFETY PLAN WITH ALL THE
 REQUIRED INFORMATION.
  
 PREVIOUS COMMENT:
 OCCUPANCY LOAD/EGRESS REQUIREMENTS SHALL INCLUDE:
 NO LIFE SAFETY SHEET!!!!!!! PROVIDE THE AMOUNT OF BEDS
 PER SLEEPING ROOM
 OCCUPANCY LOADS
 GROSS
 NET
 MEANS OF EGRESS
 EXIT ACCESS
 EXIT
 EXIT DISCHARGE
 DOORS
 EMERGENCY LIGHTING AND EXIT SIGNS
 SPECIFIC OCCUPANCY REQUIREMENTS
  
  
 10- SEMI COMPLIED. CLEARLY SHOW THE ACCESSIBLE ROUTE.
 PROVIDE DETAILS ANS SPECIFICATIONS FOR KITCHEN,
 LAUNDRY, CASUAL ROOM AND GREAT ROOM TOILET FACILITIES.
 CLARIFY/REVISE THE COUNTER HEIGHT SHOWN ON THE
 ACCESSIBLE KITCHEN DETAIL ON SHEET A-17 AND HEIGHT
 SHOWN ON THE FIRST FLOOR PLAN. REVISE STAIR SECTION
 1/A11 SHOWN ON SHEET A15.2. NEED TO COMPLY WITH FBC
 ACCESSIBILITY SEC. 505.10.2 FOR EXTENSION AT TOP OF
 STAIRS AND SEC. 505.10.3 FOR EXTENSION AT BOTTOM OF
 STAIRS. SEE DETAILS SUBMITTED AND SEC. 505.10.2 AND
 505.10.3 AND PROVIDE CORRECT DIMENSIONS OF THE
 EXTENSION AT TOP AND BOTTOM. ALSO, ALL PLANS NEED TO
 SHOW THE LOCATION OF THE STAIRS EXTENSIONS.
  
 PREVIOUS COMMENT:
 FL. ACCESSIBILITY CODE OR FAIR HOUSING, VERTICAL
 ACCESSIBILITY?
 ACCESSIBILITY REQUIREMENTS SHALL INCLUDE THE FOLLOWING:
 SITE REQUIREMENTS
 ACCESSIBLE ROUTE
 VERTICAL ACCESSIBILITY
 TOILET AND BATHING FACILITIES
 DRINKING FOUNTAINS
 EQUIPMENT
 SPECIAL OCCUPANCY REQUIREMENTS
 FAIR HOUSING REQUIREMENTS
  
 11. PROVIDE FINISH SCHEDULE.
  
 PREVIOUS COMMENT:
 NO FINISH SCHEDULE!!!!INTERIOR REQUIREMENTS SHALL
 INCLUDE THE FOLLOWING:
 INTERIOR FINISHES (FLAME SPREAD/SMOKE DEVELOPMENT)
 LIGHT AND VENTILATION
 SANITATION
  
 12. NO REQUIRED.
  
 1C) THERE IS A HANDWRITTEN NOTE ON SHEET A-1 STATING
 THAT THIS BUILDING IS CONSIDERED ONE BUILDING. IT LOOKS
 LIKE THE HANDWRITTEN IS NOT DONE BY THE ARCHITECT OF
 RECORD. THE INITIALS ARE NOT THE SAME AS THE ARCHITECT
 OF RECORD. ARCHITECT OF RECORD TO PROVIDE INFORMATION
 ON THE FINAL DRAWING SUBMITTED FOR PUBLIC RECORDS.
 (CHAPTER 481 F.S.). HANDWRITTEN INFORMATION BY OTHER
 PERSON OTHER THAN THE ARCHITECT OF RECORD NOT ALLOWED.
 BESIDES, HANDWRITTEN INFORMATION MAY CREATE CONFLICTS
 DOWN THE ROAD BECAUSE ANY REVISIONS WILL NOT SHOW THE
 HANDWRITTEN INFORMATION.
  
 PREVIOUS COMMENT:
 2ND REQUEST. THE PLANS DO NOT INDICATE IF THE CONCEPT
 FOR THIS PROJECT TO BE CONSIDERED 1 BUILDING (TOTAL
 SQUARE FOOT, FOOT PRINT OR IF THEY ARE TRYING TO COMPLY
 UNDER THE BUILDINGS ON THE SAME LOT, SECTION 503.1.2.
  
 1D) COMPLIED. FIRE SPRINKLER PLANS.
  
 1E) COMPLIED.
  
 2) COMPLIED.
  
 3) COMPLIED.
  
 4) THIRD REQUEST. ART IN PUBLIC PLACES. THE CITY OF
 WEST PALM BEACH ART IN PUBLIC PLACES ORDINANCE
 REQUIREMENT THAT APPLIES TO ANY REMODEL OR NEW
 CONSTRUCTION PROJECT FOR WHICH THE PERMIT APPLICATION
 WAS SUBMITTED AFTER 6/29/14, AND THE TOTAL PROJECT
 CONSTRUCTION COSTS ARE EQUAL TO OR GREATER THAN
 $750,000 WILL NEED TO COMPLY WITH THIS ORDINANCE. PER
 CITY OF WEST PALM BEACH ORDINANCE NO. 4504-14, AND CITY
 OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE V, ART
 IN PUBLIC PLACES, SECTION 78-123(A) AND SECTION
 78-126(A), THE ART ASSESSMENT IS 1% OF THE TOTAL
 PROJECT CONSTRUCTION COST.
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS.
 FOR CONTACT INFORMATION PLEASE CONTACT:
 MS. SYBILLE WELTER ART IN PUBLIC PLACES COORDINATOR
 822-1515 E-MAIL: [email protected]
  
 5) COMPLIED.
  
 6) NEED TO COORDINATE WITH ITEM #1B ABOVE.
  
 PREVIOUS REQUEST:
 2ND REQUEST. PLEASE SHOW HOW COMPLIANCE WITH FBC-B
 SECTION 420 IS ACHIEVED. PLEASE REVIEW 2014 FBC-B 310.6
 GROUP R-4 OCCUPANCIES SHALL MEET THE REQUIREMENTS FOR
 R-3 CONSTRUCTION EXCEPT, AS OTHERWISE PROVIDED IN THIS
 CODE.
 420.1 OCCUPANCIES IN GROUPS I-1, R-1, R-2 AND R-3 SHALL
 COMPLY WITH THE PROVISIONS OF SECTIONS 420.1 THROUGH
 420.5 AND OTHER APPLICABLE PROVISIONS OF THIS CODE.
  
 6A) COMPLIED.
  
 6B) COMPLIED.
  
 6C) COMPLIED. [F] 420.4 AUTOMATIC SPRINKLER SYSTEM.
 GROUP R OCCUPANCIES SHALL BE EQUIPPED THROUGHOUT WITH
 AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH
 SECTION 903.2.8. GROUP I-1 OCCUPANCIES SHALL BE
 EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM
 IN ACCORDANCE WITH SECTION 903.2.6. QUICKRESPONSE OR
 RESIDENTIAL AUTOMATIC SPRINKLERS SHALL BE INSTALLED IN
 ACCORDANCE WITH SECTION 903.3.2.
  
 6D) NEED TO COORDINATE WITH ITEM #1B ABOVE.
  
 PREVIOUS REQUEST:
 [F] 420.5 SMOKE DETECTION AND FIRE ALARM SYSTEMS. FIRE
 ALARM SYSTEMS AND SMOKE ALARMS SHALL BE PROVIDED IN
 GROUP I-1, R-1 AND R-2 OCCUPANCIES IN ACCORDANCE WITH
 SECTIONS 907.2.6, 907.2.8 AND 907.2.9, RESPECTIVELY.
 SINGLE-OR MULTIPLE-STATION SMOKE ALARMS SHALL BE IN
 ACCORDANCE WITH SECTION 907.2.11.
  
 7A)COMPLIED.
  
 7B) SEMI-COMPLIED. ARCHITECT OF RECORD TO PROVIDE
 INFORMATION ON THE FINAL DRAWING SUBMITTED FOR PUBLIC
 RECORDS. (CHAPTER 481 F.S.). HANDWRITTEN INFORMATION BY
 OTHER PERSON OTHER THAN THE ARCHITECT OF RECORD NOT
 ALLOWED. BESIDES, HANDWRITTEN INFORMATION MAY CREAT
 CONFLICTS DOWN THE ROAD BECAUSE ANY REVISIONS WILL NOT
 SHOW THE HANDWRITTEN INFORMATION.
  
 PREVIOUS COMMENT:
 THE WIND PRESSURES PROVIDED ON SHEETS A8 & A9 DO NOT
 INDICATE THEY ARE IN VULT. THE PRESSURES IN ALL OF THE
 PRODUCT APPROVALS ARE VASD, PLEASE PROVIDE THE
 PRESSURES IN VASD. ULTIMATE DESIGN WIND SPEED, VULT,
 (3-SECOND GUST), MILES PER HOUR (KM/HR) AND NOMINAL
 DESIGN WIND SPEED, VASD, AS DETERMINED IN ACCORDANCE
 WITH SECTION 1609.3.1.
 1ST REVIEW. SHEET A8 & A9 SHOW PRESSURES FOR COMPONENTS
 AND CLADDING, BUT THERE IS NO WIND DESIGN CRITERIA TO
 KNOW IF THESE PRESSURES ARE ACCURATE. 2014 FBC-B
 1603.1.4 WIND DESIGN DATA.
 THE FOLLOWING INFORMATION RELATED TO WIND LOADS SHALL
 BE SHOWN, REGARDLESS OF WHETHER WIND LOADS GOVERN THE
 DESIGN OF THE LATERAL FORCE-RESISTING SYSTEM OF THE
 STRUCTURE:
  
 7.1. COMPLIED.
  
 7.2. COMPLIED.
  
 7.3. COMPLIED.
  
 7.4. COMPLIED.
  
 7.5. COMPLIED
  
 8) SEMI-COMPLIED. THE HANDWRITTEN DESIGN PRESSURES
 SHOWN ON THE EXTERIOR ELEVATIONS LOOK TO BE DONE FOR A
 MEAN ROOF HEIGHT OF 20 FEET . THE MEAN ROOF HEIGHT FOR
 THIS BUILDING IS ABOUT 25 FEET. REVISE AS REQUIRED OR
 PROVIDE COMPLETE CALCULATIONS. ALSO, ARCHITECT OF
 RECORD TO PROVIDE INFORMATION ON THE FINAL DRAWING
 SUBMITTED FOR PUBLIC RECORDS. (CHAPTER 481 F.S.).
 HANDWRITTEN INFORMATION BY OTHER PERSON OTHER THAN THE
 ARCHITECT OF RECORD NOT ALLOWED. BESIDES, HANDWRITTEN
 INFORMATION MAY CREATE CONFLICTS DOWN THE ROAD BECAUSE
 ANY REVISIONS WILL NOT SHOW THE HANDWRITTEN
 INFORMATION. ALL PRODUCT APPROVALS WILL BE REVIEWED
 ONCE THE DESIGN PRESSURES ARE REVISED AND ARE ON THE
 FINAL DRAWINGS. NOTE: TO HELP EXPEDITE THE REVIEW AND
 PERMIT ISSUANCE ALL PRODUCT APPROVALS MAY BE
 SUBMITTED/REVIEWED AFTER THE PERMIT ISSUED UNDER
 DEFERRED SUBMITTALS.
  
 PREVIOUS COMMENT:
 2ND REQUEST, UNTIL THE WIND DESIGN PRESSURES ARE IN
 DESIGN PRESSURES (VASD) THE PRODUCT APPROVALS SUBMITTED
 CAN NOT BE CHECKED FOR CODE COMPLIANCE.
 2014 FBC-B 1609.1.2 PROTECTION OF OPENINGS,
 1609.6.4.4.1 COMPONENTS & CLADDING. FLORIDA DEPARTMENT
 OF COMMUNITY AFFAIRS, ADMINISTRATIVE CODE 61G20-3.005,
 RULE 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS
 OR CONSTRUCTION SYSTEMS THAT WILL REQUIRE PRODUCT
 APPROVALS:
 (31)(A) EXTERIOR DOORS ,MULLIONS & ROOF HATCHES.
 (B) WINDOWS & MULLIONS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP
 VENTILATORS (NOTE: CHECK FLAT ROOF ASSEMBLY)
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
  
 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH
 ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR
 TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. FL
 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR
 SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS,
 SHOP DRAWINGS ETC..
  
 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
  
 9) SEMI-COMPLIED. WILL BE REVIEWED ONCE DESIGN
 PRESSURES ARE REVISED ON FINAL DRAWINGS. NOTE: TO HELP
 EXPEDITE THE REVIEW AND PERMIT ISSUANCE ALL PRODUCT
 APPROVALS MAY BE SUBMITTED/REVIEWED AFTER THE PERMIT
 ISSUED UNDER DEFERRED SUBMITTALS.
  
 PREVIOUS COMMENT:
 IDENTIFY GLAZING/ MULLIONS. FOR ALL PRODUCTS WITH
 GLAZING, PLEASE IDENTIFY THE OPENING WIDTH & HEIGHT,
 TYPE OF GLAZING, MULLION INFORMATION IF REQUIRED,
 ATTACHMENTS AND ASSOCIATE PRESSURES FOR EACH OPENING
 SIZE. 2014 FBC-B 1405.13.1 INSTALLATION. WINDOWS AND
 DOORS SHALL BE INSTALLED IN ACCORDANCE WITH APPROVED
 MANUFACTURERS INSTRUCTIONS. FASTENER SIZE AND SPACING
 SHALL BE PROVIDED IN SUCH INSTRUCTIONS AND SHALL BE
 CALCULATED BASED ON MAXIMUM LOADS AND SPACING USED IN
 THE TESTS.
  
 10) SEMI COMPLIED. SEE ITEM #10 ABOVE.
  
 11) SEMI-COMPLIED. PLANS DON'T SHOW FINISH FLOORS.
 UNABLE TO VERIFY FLOOR UNDERLAYMENT INFORMATION
 SUBMITTED. INFORMATION SUBMITTED WILL BE REVIEWED WHEN
 THE PROPOSED FINISH IS SPECIFIED. NEED TO CHECK FINISH
 MATERIAL AND FLOOR ASSEMBLY MATCHES THE ONE THAT WAS
 TESTED. NOTE: TO HELP EXPEDITE THE REVIEW AND PERMIT
 ISSUANCE THIS INFORMATION MAY BE SUBMITTED/REVIEWED
 AFTER THE PERMIT ISSUED UNDER DEFERRED SUBMITTALS.
  
 PREVIOUS COMMENT:
 2ND REQUEST. THE PLANS DO NOT INDICATE WHAT THE 2ND
 FLOOR FINISHES WILL BE? PLEASE SHOW COMPLIANCE WITH:
 FOR TILE, STONE, MARBLE AND WOOD FLOORING ALL NEED TO
 HAVE HAD THE SOUND UNDERLAYMENT TESTED FLOOR ASSEMBLIES
 TO THE FOLLOWING STANDARDS AND MEET THE QUALIFICATIONS
 LISTED UNDER EACH OF THE STANDARDS FOR A HAMBRO FLOOR
 SYSTEM/ NO DROPPED CEILING:
 PLEASE PROVIDE TEST REPORTS SHOWING COMPLIANCE WITH:
 11A) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 11B) SEMI-COMPLIED. THERE ARE NO SPECIFICATIONS ON
 PLANS FOR INSULATION ON WALLS.
  
 PREVIOUS COMMENT:
 FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 11C) SEMI-COMPLIED. THERE ARE NO SPECIFICATIONS ON
 PLANS FOR INSULATION ON WALLS.
  
 PREVIOUS COMMENT:
 TYPE III-TYPE V CONSTRUCTION: FBC-B-2014 720.2
 CONCEALED INSTALLATION. INSULATING MATERIALS, WHERE
 CONCEALED AS INSTALLED IN BUILDINGS OF ANY TYPE OF
 CONSTRUCTION, SHALL HAVE A FLAME SPREAD INDEX OF NOT
 MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE
 THAN 450.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 12) IMPACT FEES. BEFORE A PERMIT TO CONSTRUCT, MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO PALM BEACH COUNTY.
 THE ACTUAL PERMIT SET OF PLANS MUST BE STAMPED BY THAT
 OFFICE, AND A COPY OF THE PAID RECEIPT ATTACHED TO THE
 PERMIT APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 13) THIS REVIEW CYCLE A THOROUGH REVIEW COULD NOT BE
 COMPLETED AND ADDITIONAL AND OR NEW COMMENTS MAY OCCUR
 ON SUBSEQUENT REVIEWS. WHEN RESUBMITTING PLANS PLEASE
 INDICATE THE REVISION & REMOVE ANY VOIDED SHEETS &
 REPLACE ANY PAGES AS NECESSARY, COLLATE AND STAPLE INTO
 SETS OF PLANS. A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 NEW COMMENTS:
 1- PLANS ARE MISSING THE ATTIC ACCES ON SECOND FLOOR AS
 REQUIRED BY SEC. 1209.2 FBC
  
 2- FLOOR DESIGN CRITERIA ON SHEET A-11 NEEDS TO BE
 COORDINATED WITH 2ND FLOOR FRAMING SPECIFICATIONS SHOWN
 ON PLAN AND THE CLEAR SPAN ON SHEET A-12. . JOIST DEPTH
 DOESN'T MATCH AND THE MAXIMUM CLEAR SPAN TABLES SHOWN
 ON SHEET A-12 DON'T INCLUDE THE LIVE AND DEAD LOADS
 REQUIRED FOR THE 2ND FLOOR CONVERSATION PORCH. REVISE
 AS REQUIRED. SEC. 107.2.1.2 CITY AMENDMENTS.
  
 3- TRUSS PACKAGE:
 A) FLAT ROOF AREA ABOVE THE CASUAL ROOM AND LAUNDRY.
 ARCHITECT OF RECORD SPECIFIED ROOF PITCH TOWARDS THE
 PITCHED ROOF. IT LOOKS LIKE THE TRUSS DRAWINGS ARE
 DESIGNED WITH THE SLOPE TOWARDS THE WALL OF THE
 CONVERSATION PORCH. DIVERTING THE WATER TOWARDS THE
 CONVERSATION PORCH WALL WILL AFFECT THE DESIGN OF THE
 ROOF STRUCTURE. REVISE AS REQUIRED TO MATCH. SEC.
 107.2.1 CITY AMENDMENTS.
  
 B) TRUSS ENGINEER TO PROVIDE ORIGINAL SEAL AND
 SIGNATURE ON THE TRUSS PACKAGE COVER PAGE AND PROVIDE
 THE NAME OF THE DESIGNER OF RECORD AS REQUIRED BY SEC.
 61G15-31.003.
  
 ****PLEASE SUBMIT OLD DRAWINGS FOR REFERENCE..
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 BUILDING DIVISION
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2017-09-26 Cont ID  
Sent By jwitmer Date 2017-09-26 Time 14:35 Rev Time 0.00
Received By jwitmer Date 2017-09-26 Time 07:31 Sent To  
Notes
2017-09-26 14:35:022014 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: 17041276
 ADD: 1626 OKEECHOBEE RD.
 CONT: ERETZOR CONSTRUCTION LLC
 TEL: 954-937-7041
 E-MAIL: [email protected]
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2ND REVIEW
 DATE: TUES. SEPT. 26/ 2017
 ACTION: DENIED
  
 4X FEE / NOTICE!!!!! FLORIDA STATUTE 553.80(2)(B).
  
 WITH RESPECT TO EVALUATION OF DESIGN PROFESSIONALS?
 DOCUMENTS, IF A LOCAL GOVERNMENT FINDS IT NECESSARY, IN
 ORDER TO ENFORCE COMPLIANCE WITH THE FLORIDA BUILDING
 CODE AND ISSUE A PERMIT, TO REJECT DESIGN DOCUMENTS
 REQUIRED BY THE CODE THREE OR MORE TIMES FOR FAILURE TO
 CORRECT A CODE VIOLATION SPECIFICALLY AND CONTINUOUSLY
 NOTED IN EACH REJECTION, INCLUDING, BUT NOT LIMITED TO,
 EGRESS, FIRE PROTECTION, STRUCTURAL STABILITY, ENERGY,
 ACCESSIBILITY, LIGHTING, VENTILATION, ELECTRICAL,
 MECHANICAL, PLUMBING, AND GAS SYSTEMS, OR OTHER
 REQUIREMENTS IDENTIFIED BY RULE OF THE FLORIDA BUILDING
 COMMISSION ADOPTED PURSUANT TO CHAPTER 120, THE LOCAL
 GOVERNMENT SHALL IMPOSE, EACH TIME AFTER THE THIRD SUCH
 REVIEW THE PLANS ARE REJECTED FOR THAT CODE VIOLATION,
 A FEE OF FOUR TIMES THE AMOUNT OF THE PROPORTION OF THE
 PERMIT FEE ATTRIBUTED TO PLANS REVIEW.
  
  
 1) COVERSHEET A-1:
  
 1A) SEMI-COMPLIED. THE COVERSHEET A-1 HAS COMPLIED WITH
 THE WORDING IN THE TITLE BLOCK. WITHIN THE BODY OF THE
 PLANS, THE DESIGN PROFESSIONAL STILL INDICATES THIS TO
 BE A LEVEL III ALTERATION.
 1ST ROUND OF COMMENTS. THE PERMIT APPLICATION UNDER THE
 DESCRIPTION OF WORK INDICATES NEW BUILDINGS, TWO
 STORIES WHEREAS THE TITLE BLOCK INDICATES THIS IS AN
 INTERIOR REMODEL. DISCREPANCY IN THE DESCRIPTION OF
 WORK. 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
  
 1B) 2ND REQUEST. THE DESIGNER OF RECORD HAS NOT
 PROVIDED A CODE ANALYSIS, PROVIDING THE OCCUPANCY TYPE,
 USAGE, (ALCOHOL AND OR DRUG CENTER, GROUP HOME), THE
 TYPE OF MINIMUM CONSTRUCTION REQUIRED, OR IF FIRE
 SPRINKLERED. NOTE FIRE SPRINKLER PLANS FOR R13 SYSTEM
 SUBMITTED.
 1ST ROUND OF COMMENTS. THE COVERSHEET APPEARS TO BE THE
 CODE ANALYSIS FOR THE BUILDING INFORMATION. THERE IS NO
 INDEX SHEET LISTING WHERE THIS INFORMATION CAN BE
 FOUND. WITHOUT THE OCCUPANCY TYPE BEING DECLARED AND
 THE MINIMUM BUILDING TYPE DECLARED IT IS ONLY
 ASSUMPTIONS, A THOROUGH REVIEW CANNOT BE ACCOMPLISHED.
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION 107.3.5 MINIMUM PLAN REVIEW CRITERIA FOR
 BUILDINGS.
 107.3.5.1 COMMERCIAL BUILDINGS:
 107.3.5.1.1 BUILDING
 2. OCCUPANCY TYPE 301.1 SHORT TERM FACILITY OR LONG
 TERM FACILITY. PLEASE NOTE ON THE COVERSHEET THERE IS A
 NOTE STATING THIS IS A SHORT TERM FACILITY. WHEN
 DEFINING SHORT TERM THE BUILDING CODE USES 30 DAYS OR
 LESS FOR SHORT TERM (TRANSIENT), LONGER STAYS ARE
 (NON-TRANSIENT). IT APPEARS THIS USAGE IS MORE OF A R4
 FACILITY AN ALCOHOL AND OR DRUG REHAB CENTER WITH
 CONGREGATE CARE FACILITIES, (A BUILDING OR PART THERE
 OF THAT CONTAINS SLEEPING UNITS WHERE THE RESIDENTS
 SHARE BATHROOMS AND OR KITCHEN FACILITIES. THE OTHER
 ISSUE IS WITH THE UNITS CONTAINING 2 BEDROOMS AND 2
 OCCUPANTS PER BEDROOM AND SHARED BATHROOMS AND OR
 KITCHEN FACILITIES THE UNIT ALSO RESEMBLES DORMITORIES!
 PLEASE DECLARE OCCUPANCY AND USAGE. 2014 FBC-B 302.1
 CLASSIFICATION.
  
 THE OTHER ISSUE IS THE NOTE FOUND ON SHEET A-17 & A-18
 THAT THIS BUILDING IS A PRIVATE FACILITY NOT OPEN TO
 THE GENERAL PUBLIC OR RENTED OUT TO THE GENERAL PUBLIC.
 HOW DOES ONE END UP AS A TENANT AT THIS ESTABLISHMENT.
 THE DESIGNER OF RECORD WITH NOT DEFINING THE OCCUPANCY
 TYPE AND USAGE WE CAN NOT DEFINE WHICH THE DESIGNER
 MUST DESIGN TOO, FAIR HOUSING OR THE 2014
 FBC-ACCESSIBILITY CODE, NOT ADAAG.
 NOTE THE FLORIDA ACCESSIBILITY CODE IS BLESSED BY THE
 DEPARTMENT OF JUSTICE, AND A MORE RESTRICTIVE CODE.
 IT IS TRUE YOU MAY NOT REQUIRE AN ELEVATOR BUT DOES NOT
 RELIEVE THE DESIGNER FROM THE DUTY OF VERTICAL
 ACCESSIBILITY, ON THE OTHER HAND IF THIS FACILITY IS
 DETERMINED TO FALL UNDER THE GUIDELINES OF FAIR HOUSING
 THEN THE 2014 FBC FAIR HOUSING ACCESSIBILITY GUIDELINES
 WOULD APPLY. PLEASE DECLARE OCCUPANCY AND USAGE. 2014
 FBC-B 302.1 CLASSIFICATION.
  
  
 3) 2ND REQUEST. MINIMUM TYPE OF CONSTRUCTION (TABLE
 503)
  
 4. FIRE-RESISTANT CONSTRUCTION REQUIREMENTS SHALL
 INCLUDE THE FOLLOWING COMPONENTS:
 FIRE-RESISTANT SEPARATIONS
 FIRE-RESISTANT PROTECTION FOR TYPE OF CONSTRUCTION
 PROTECTION OF OPENINGS AND PENETRATIONS OF RATED WALLS
 FIRE BLOCKING AND DRAFTSTOPPING AND CALCULATED FIRE
 RESISTANCE
 5.COMPLIED. FIRE SUPPRESSION SYSTEMS SHALL INCLUDE:
 SCHEMATIC FIRE SPRINKLERS
 STANDPIPES
 PRE-ENGINEERED SYSTEMS
  
 6-7) COMPLIED. LIFE SAFETY SYSTEMS SHALL BE DETERMINED
 AND SHALL INCLUDE THE FOLLOWING REQUIREMENTS:
 OCCUPANT LOAD AND EGRESS CAPACITIES
  
 7. OCCUPANCY LOAD/EGRESS REQUIREMENTS SHALL INCLUDE:
 NO LIFE SAFETY SHEET!!!!!!! PROVIDE THE AMOUNT OF BEDS
 PER SLEEPING ROOM
 OCCUPANCY LOADS
 GROSS
 NET
 MEANS OF EGRESS
 EXIT ACCESS
 EXIT
 EXIT DISCHARGE
 DOORS
 EMERGENCY LIGHTING AND EXIT SIGNS
 SPECIFIC OCCUPANCY REQUIREMENTS
  
 10) FL. ACCESSIBILITY CODE OR FAIR HOUSING, VERTICAL
 ACCESSIBILITY?
 ACCESSIBILITY REQUIREMENTS SHALL INCLUDE THE FOLLOWING:
 SITE REQUIREMENTS
 ACCESSIBLE ROUTE
 VERTICAL ACCESSIBILITY
 TOILET AND BATHING FACILITIES
 DRINKING FOUNTAINS
 EQUIPMENT
 SPECIAL OCCUPANCY REQUIREMENTS
 FAIR HOUSING REQUIREMENTS
  
 11. NO FINISH SCHEDULE!!!!INTERIOR REQUIREMENTS SHALL
 INCLUDE THE FOLLOWING:
 INTERIOR FINISHES (FLAME SPREAD/SMOKE DEVELOPMENT)
 LIGHT AND VENTILATION
 SANITATION
  
 12.2ND REQUEST TO BE DETERMINED , SPECIAL SYSTEMS:
 ELEVATORS
 LIFTS
  
 1C) 2ND REQUEST. THE PLANS DO NOT INDICATE IF THE
 CONCEPT FOR THIS PROJECT TO BE CONSIDERED 1 BUILDING
 (TOTAL SQUARE FOOT, FOOT PRINT OR IF THEY ARE TRYING TO
 COMPLY UNDER THE BUILDINGS ON THE SAME LOT, SECTION
 503.1.2.
  
 1D) COMPLIED. FIRE SPRINKLER PLANS.
  
 1E) SHEET A2.1 DESIGN LIVE LOADS PLANS INDICATE: STAIRS
 & CORRIDORS 60 PSF CORRECT.
 2014 FBC-B TABLE 1607.1(30) STAIRS 100 PSF,
 2014 FBC-B TABLE 1607.1(25) PUBLIC ROOMS & CORRIDORS
 100 PSF
  
 SHEET A2.1 DESIGN LIVE LOADS PLANS INDICATE: BALCONIES
 30 PSF
 2014 FBC-B TABLE 1607.1(5) BALCONIES & DECKS ? SAME AS
 OCCUPANCY SERVED.
 2014 FBC-B TABLE 1607.1(25) PRIVATE ROOMS AND CORRIDORS
 SERVING THEM 40 PSF.
  
 2) 2ND REQUEST. 2014 FBC-B 1803.5.2 QUESTIONABLE SOIL.
 WHERE THE CLASSIFICATION, STRENGTH OR COMPRESSIBILITY
 OF THE SOIL IS IN DOUBT OR WHERE A LOAD-BEARING VALUE
 SUPERIOR TO THAT SPECIFIED IN THIS CODE IS CLAIMED, THE
 BUILDING OFFICIAL SHALL BE PERMITTED TO REQUIRE THAT A
 GEOTECHNICAL INVESTIGATION BE CONDUCTED.
  
 3)2ND REQUEST, SEE MECHANICAL COMMENTS. PLEASE SUBMIT
 ENERGY CALCULATIONS. 2014 FBC-ENERGY CODE. C401.2
 APPLICATION.
 COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF THE
 FOLLOWING:
 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1.
 2. THE REQUIREMENTS OF SECTIONS C402, C403, C404 AND
 C405. IN ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY
 WITH EITHER SECTION C406.2, C406.3 OR C406.4.
 3. THE REQUIREMENTS OF SECTION C407, C402.4, C403.2,
 C404, C405.2, C405.3, C405.4, C405.6 AND C405.7. THE
 BUILDING ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85
 PERCENT OF THE STANDARD REFERENCE DESIGN BUILDING.
  
 4) 2ND REQUEST. ART IN PUBLIC PLACES. THE CITY OF WEST
 PALM BEACH ART IN PUBLIC PLACES ORDINANCE REQUIREMENT
 THAT APPLIES TO ANY REMODEL OR NEW CONSTRUCTION PROJECT
 FOR WHICH THE PERMIT APPLICATION WAS SUBMITTED AFTER
 6/29/14, AND THE TOTAL PROJECT CONSTRUCTION COSTS ARE
 EQUAL TO OR GREATER THAN $750,000 WILL NEED TO COMPLY
 WITH THIS ORDINANCE. PER CITY OF WEST PALM BEACH
 ORDINANCE NO. 4504-14, AND CITY OF WEST PALM BEACH CODE
 OF ORDINANCES, ARTICLE V, ART IN PUBLIC PLACES, SECTION
 78-123(A) AND SECTION 78-126(A), THE ART ASSESSMENT IS
 1% OF THE TOTAL PROJECT CONSTRUCTION COST.
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS.
 FOR CONTACT INFORMATION PLEASE CONTACT:
 MS. SYBILLE WELTER ART IN PUBLIC PLACES COORDINATOR
 822-1515 E-MAIL: [email protected]
  
 5) COMPLIED.
  
 6) 2ND REQUEST. PLEASE SHOW HOW COMPLIANCE WITH FBC-B
 SECTION 420 IS ACHIEVED. PLEASE REVIEW 2014 FBC-B 310.6
 GROUP R-4 OCCUPANCIES SHALL MEET THE REQUIREMENTS FOR
 R-3 CONSTRUCTION EXCEPT, AS OTHERWISE PROVIDED IN THIS
 CODE.
 420.1 OCCUPANCIES IN GROUPS I-1, R-1, R-2 AND R-3 SHALL
 COMPLY WITH THE PROVISIONS OF SECTIONS 420.1 THROUGH
 420.5 AND OTHER APPLICABLE PROVISIONS OF THIS CODE.
  
 6A) 420.2 SEPARATION WALLS. WALLS SEPARATING DWELLING
 UNITS IN THE SAME BUILDING, WALLS SEPARATING SLEEPING
 UNITS IN THE SAME BUILDING AND WALLS SEPARATING
 DWELLING OR SLEEPING UNITS FROM OTHER OCCUPANCIES
 CONTIGUOUS TO THEM IN THE SAME BUILDING SHALL BE
 CONSTRUCTED AS FIRE PARTITIONS IN ACCORDANCE WITH
 SECTION 708.
  
 6B) 420.3 HORIZONTAL SEPARATION. FLOOR ASSEMBLIES
 SEPARATING DWELLING UNITS IN THE SAME BUILDINGS, FLOOR
 ASSEMBLIES SEPARATING SLEEPING UNITS IN THE SAME
 BUILDING AND FLOOR ASSEMBLIES SEPARATING DWELLING OR
 SLEEPING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO
 THEM IN THE SAME BUILDING SHALL BE CONSTRUCTED AS
 HORIZONTAL ASSEMBLIES IN ACCORDANCE WITH SECTION 711.
  
 6C) COMPLIED. [F] 420.4 AUTOMATIC SPRINKLER SYSTEM.
 GROUP R OCCUPANCIES SHALL BE EQUIPPED THROUGHOUT WITH
 AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH
 SECTION 903.2.8. GROUP I-1 OCCUPANCIES SHALL BE
 EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM
 IN ACCORDANCE WITH SECTION 903.2.6. QUICKRESPONSE OR
 RESIDENTIAL AUTOMATIC SPRINKLERS SHALL BE INSTALLED IN
 ACCORDANCE WITH SECTION 903.3.2.
  
 6D) [F] 420.5 SMOKE DETECTION AND FIRE ALARM SYSTEMS.
 FIRE ALARM SYSTEMS AND SMOKE ALARMS SHALL BE PROVIDED
 IN GROUP I-1, R-1 AND R-2 OCCUPANCIES IN ACCORDANCE
 WITH SECTIONS 907.2.6, 907.2.8 AND 907.2.9,
 RESPECTIVELY. SINGLE-OR MULTIPLE-STATION SMOKE ALARMS
 SHALL BE IN ACCORDANCE WITH SECTION 907.2.11.
  
 7A)2ND REQUEST. THE COVERSHEET NOW INDICATES WIND
 DESIGN. THE COVERSHEET UNDER THE WIND DESIGN INDICATES
 A BASIC WIND SPEED OF 160 MPH, THEN 2 LINES DOWN A WIND
 SPEED IN 3 SECOND GUST OF 140 MPH. THEN ON SHEET A2.1
 WIND SPEED OF 170 MPH. PLEASE SEE THE 2014 FBC-B FIGURE
 1609A FOR BUILDINGS WITH A RISK CATEGORY II. THE FIGURE
 SHOWS THE CITY OF WEST PALM BEACH IN A WIND ZONE OF 170
 VULT/ 3 SECOND GUST. THE WIND SPEED CONVERSION TABLE
 1609.3.1 INDICATES FOR 170 VULT THE CONVERSION TO VASD
 WILL BE 132 VASD/ 3 SECOND GUST. PLEASE CORRECT.
  
 7B) THE WIND PRESSURES PROVIDED ON SHEETS A8 & A9 DO
 NOT INDICATE THEY ARE IN VULT. THE PRESSURES IN ALL OF
 THE PRODUCT APPROVALS ARE VASD, PLEASE PROVIDE THE
 PRESSURES IN VASD. ULTIMATE DESIGN WIND SPEED, VULT,
 (3-SECOND GUST), MILES PER HOUR (KM/HR) AND NOMINAL
 DESIGN WIND SPEED, VASD, AS DETERMINED IN ACCORDANCE
 WITH SECTION 1609.3.1.
 1ST REVIEW. SHEET A8 & A9 SHOW PRESSURES FOR COMPONENTS
 AND CLADDING, BUT THERE IS NO WIND DESIGN CRITERIA TO
 KNOW IF THESE PRESSURES ARE ACCURATE. 2014 FBC-B
 1603.1.4 WIND DESIGN DATA.
 THE FOLLOWING INFORMATION RELATED TO WIND LOADS SHALL
 BE SHOWN, REGARDLESS OF WHETHER WIND LOADS GOVERN THE
 DESIGN OF THE LATERAL FORCE-RESISTING SYSTEM OF THE
 STRUCTURE:
  
 7.1. ULTIMATE DESIGN WIND SPEED, VULT, (3-SECOND GUST),
 MILES PER HOUR (KM/HR) AND NOMINAL DESIGN WIND SPEED,
 VASD, AS DETERMINED IN ACCORDANCE WITH SECTION
 1609.3.1.
  
 7.2. RISK CATEGORY.
  
 7.3. WIND EXPOSURE. APPLICABLE WIND DIRECTION IF MORE
 THAN ONE WIND EXPOSURE IS UTILIZED. TABLE 1609.7.2.
 HEIGHT AND EXPOSURE.
  
 7.4. APPLICABLE INTERNAL PRESSURE COEFFICIENT.
  
 7.5. DESIGN WIND PRESSURES TO BE USED FOR EXTERIOR
 COMPONENT AND CLADDING MATERIALS NOT SPECIFICALLY
 DESIGNED BY THE REGISTERED DESIGN PROFESSIONAL
 RESPONSIBLE FOR THE DESIGN OF THE STRUCTURE, PSF (KN/
 M2).
 TABLE 1609.7(2) ADJUSTMENT FACTORS FOR HEIGHT &
 EXPOSURE. PROVIDE THE MEAN ROOF HEIGHT FOR THE
 BUILDING.
 1609.3.1 WIND SPEED CONVERSION VULT TO VASD.
  
 8) 2ND REQUEST, UNTIL THE WIND DESIGN PRESSURES ARE IN
 DESIGN PRESSURES (VASD) THE PRODUCT APPROVALS SUBMITTED
 CAN NOT BE CHECKED FOR CODE COMPLIANCE.
 2014 FBC-B 1609.1.2 PROTECTION OF OPENINGS,
 1609.6.4.4.1 COMPONENTS & CLADDING. FLORIDA DEPARTMENT
 OF COMMUNITY AFFAIRS, ADMINISTRATIVE CODE 61G20-3.005,
 RULE 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS
 OR CONSTRUCTION SYSTEMS THAT WILL REQUIRE PRODUCT
 APPROVALS:
 (31)(A) EXTERIOR DOORS ,MULLIONS & ROOF HATCHES.
 (B) WINDOWS & MULLIONS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP
 VENTILATORS
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
  
 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH
 ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR
 TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. FL
 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR
 SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS,
 SHOP DRAWINGS ETC..
  
 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
  
 9) IDENTIFY GLAZING/ MULLIONS. FOR ALL PRODUCTS WITH
 GLAZING, PLEASE IDENTIFY THE OPENING WIDTH & HEIGHT,
 TYPE OF GLAZING, MULLION INFORMATION IF REQUIRED,
 ATTACHMENTS AND ASSOCIATE PRESSURES FOR EACH OPENING
 SIZE. 2014 FBC-B 1405.13.1 INSTALLATION. WINDOWS AND
 DOORS SHALL BE INSTALLED IN ACCORDANCE WITH APPROVED
 MANUFACTURERS INSTRUCTIONS. FASTENER SIZE AND SPACING
 SHALL BE PROVIDED IN SUCH INSTRUCTIONS AND SHALL BE
 CALCULATED BASED ON MAXIMUM LOADS AND SPACING USED IN
 THE TESTS.
  
 10) 2ND ROUND OF COMMENTS. SHEET A15.1 SHOW POST FOR
 HANDRAIL ANCHORING. THE PLANS SUBMITTED DOES NOT SHOW
 THE HANDRAIL HEIGHT (1012.2) GRASPABILITY (1012.3),
 CONTINUITY (1012.4) EXTENSIONS IF REQUIRED (1012.6),
 GUARDS 1013.3, OPENING LIMITATIONS (1013.4),
 1607.8.1.1 CONCENTRATED LOAD. HANDRAILS AND GUARDS
 SHALL ALSO BE DESIGNED TO RESIST A CONCENTRATED LOAD OF
 200 POUNDS IN ACCORDANCE WITH SECTION 4.5.1 OF ASCE 7.
 1607.8.1.2 INTERMEDIATE RAILS. INTERMEDIATE RAILS (ALL
 THOSE EXCEPT THE HANDRAIL), BALUSTERS AND PANEL FILLERS
 SHALL BE DESIGNED TO RESIST A CONCENTRATED LOAD OF 50
 POUNDS IN ACCORDANCE WITH SECTION 4.5.1 OF ASCE 7.
 1ST ROUND OF COMMENTS. PLANS ARE DEFICIENT IN STAIR
 DESIGN AS TO TYPE OF MATERIAL, LOADING PER SQ. FT.
 THERE IS NO HANDRAIL OR GUARDRAIL DESIGN WITHIN THE
 PERMIT PACKAGE SET OF PLANS.
  
 11) 2ND REQUEST. THE PLANS DO NOT INDICATE WHAT THE 2ND
 FLOOR FINISHES WILL BE? PLEASE SHOW COMPLIANCE WITH:
 FOR TILE, STONE, MARBLE AND WOOD FLOORING ALL NEED TO
 HAVE HAD THE SOUND UNDERLAYMENT TESTED FLOOR ASSEMBLIES
 TO THE FOLLOWING STANDARDS AND MEET THE QUALIFICATIONS
 LISTED UNDER EACH OF THE STANDARDS FOR A HAMBRO FLOOR
 SYSTEM/ NO DROPPED CEILING:
 PLEASE PROVIDE TEST REPORTS SHOWING COMPLIANCE WITH:
 11A) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 11B) FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 11C) TYPE III-TYPE V CONSTRUCTION: FBC-B-2014 720.2
 CONCEALED INSTALLATION. INSULATING MATERIALS, WHERE
 CONCEALED AS INSTALLED IN BUILDINGS OF ANY TYPE OF
 CONSTRUCTION, SHALL HAVE A FLAME SPREAD INDEX OF NOT
 MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE
 THAN 450.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 12) IMPACT FEES. BEFORE A PERMIT TO CONSTRUCT, MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO PALM BEACH COUNTY.
 THE ACTUAL PERMIT SET OF PLANS MUST BE STAMPED BY THAT
 OFFICE, AND A COPY OF THE PAID RECEIPT ATTACHED TO THE
 PERMIT APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 13) THIS REVIEW CYCLE A THOROUGH REVIEW COULD NOT BE
 COMPLETED AND ADDITIONAL AND OR NEW COMMENTS MAY OCCUR
 ON SUBSEQUENT REVIEWS. WHEN RESUBMITTING PLANS PLEASE
 INDICATE THE REVISION & REMOVE ANY VOIDED SHEETS &
 REPLACE ANY PAGES AS NECESSARY, COLLATE AND STAPLE INTO
 SETS OF PLANS. A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST.
 WEST PALM BEACH. FL 33402
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 DEVELOPMENT SERVICES HOME PAGE
 HTTP://WWW.CITYOFWPB.COM/CONSTRUCTION/INDEX.PHP
  
 PLEASE NOTE: FLORIDA HAS A VERY BROAD PUBLIC RECORDS
 LAW. WRITTEN COMMUNICATIONS TO OR FROM LOCAL OFFICIALS
 REGARDING CITY BUSINESS ARE PUBLIC RECORD, AVAILABLE TO
 THE PUBLIC UPON REQUEST. YOUR E-MAIL COMMUNICATIONS ARE
 THEREFORE SUBJECT TO PUBLIC DISCLOSURE.
 MEMBER OF BOAF: BUILDING OFFICIALS ASSOCIATION OF
 FLORIDA SAVING LIVES AND PROPERTY SINCE 1953
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2017-05-15 Cont ID  
Sent By jwitmer Date 2017-05-15 Time 09:52 Rev Time 0.00
Received By jwitmer Date 2017-05-15 Time 08:20 Sent To  
Notes
2017-05-15 09:44:242014 FBC- BUILDING PLAN REVIEW
 W. P. B. PERMIT: 17041276
 ADD: 1626 OKEECHOBEE RD.
 CONT: ERETZOR CONSTRUCTION LLC
 TEL: 954-937-7041
 E-MAIL: [email protected]
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 1ST REVIEW
 DATE: MON. MAY 15/ 2017
 ACTION: DENIED
  
 1) COVERSHEET A-1:
  
 1A) THE PERMIT APPLICATION UNDER THE DESCRIPTION OF
 WORK INDICATES NEW BUILDINGS, TWO STORIES WHEREAS THE
 TITLE BLOCK INDICATES THIS IS AN INTERIOR REMODEL.
 DISCREPANCY IN THE DESCRIPTION OF WORK. 107.2.1.3
 ADDITIONAL INFORMATION IS REQUIRED.
  
 1B) THE COVERSHEET APPEARS TO BE THE CODE ANALYSIS FOR
 THE BUILDING INFORMATION. THERE IS NO INDEX SHEET
 LISTING WHERE THIS INFORMATION CAN BE FOUND. WITHOUT
 THE OCCUPANCY TYPE BEING DECLARED AND THE MINIMUM
 BUILDING TYPE DECLARED IT IS ONLY ASSUMPTIONS, A
 THOROUGH REVIEW CANNOT BE ACCOMPLISHED.
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION 107.3.5 MINIMUM PLAN REVIEW CRITERIA FOR
 BUILDINGS.
 107.3.5.1 COMMERCIAL BUILDINGS:
 107.3.5.1.1 BUILDING
 2. OCCUPANCY TYPE 301.1 SHORT TERM FACILITY OR LONG
 TERM FACILITY
 3) MINIMUM TYPE OF CONSTRUCTION (TABLE 503)
 4. FIRE-RESISTANT CONSTRUCTION REQUIREMENTS SHALL
 INCLUDE THE FOLLOWING COMPONENTS:
 FIRE-RESISTANT SEPARATIONS
 FIRE-RESISTANT PROTECTION FOR TYPE OF CONSTRUCTION
 PROTECTION OF OPENINGS AND PENETRATIONS OF RATED WALLS
 FIRE BLOCKING AND DRAFTSTOPPING AND CALCULATED FIRE
 RESISTANCE
 5. FIRE SUPPRESSION SYSTEMS SHALL INCLUDE:
 SCHEMATIC FIRE SPRINKLERS
 STANDPIPES
 PRE-ENGINEERED SYSTEMS
 6. LIFE SAFETY SYSTEMS SHALL BE DETERMINED AND SHALL
 INCLUDE THE FOLLOWING REQUIREMENTS:
 OCCUPANT LOAD AND EGRESS CAPACITIES
 7. OCCUPANCY LOAD/EGRESS REQUIREMENTS SHALL INCLUDE:
 NO LIFE SAFETY SHEET!!!!!!! PROVIDE THE AMOUNT OF BEDS
 PER SLEEPING ROOM
 OCCUPANCY LOADS
 GROSS
 NET
 MEANS OF EGRESS
 EXIT ACCESS
 EXIT
 EXIT DISCHARGE
 DOORS
 EMERGENCY LIGHTING AND EXIT SIGNS
 SPECIFIC OCCUPANCY REQUIREMENTS
 10) FL. ACCESSIBILITY CODE OR FAIR HOUSING, VERTICAL
 ACCESSIBILITY?
 ACCESSIBILITY REQUIREMENTS SHALL INCLUDE THE FOLLOWING:
 SITE REQUIREMENTS
 ACCESSIBLE ROUTE
 VERTICAL ACCESSIBILITY
 TOILET AND BATHING FACILITIES
 DRINKING FOUNTAINS
 EQUIPMENT
 SPECIAL OCCUPANCY REQUIREMENTS
 FAIR HOUSING REQUIREMENTS
  
 11. NO FINISH SCHEDULE!!!!INTERIOR REQUIREMENTS SHALL
 INCLUDE THE FOLLOWING:
 INTERIOR FINISHES (FLAME SPREAD/SMOKE DEVELOPMENT)
 LIGHT AND VENTILATION
 SANITATION
 12. SPECIAL SYSTEMS:
 ELEVATORS
 ESCALATORS
 LIFTS
  
  
  
 1C) THE PLANS DO NOT INDICATE IF THE CONCEPT FOR THIS
 PROJECT TO BE CONSIDERED 1 BUILDING (TOTAL SQUARE FOOT,
 FOOT PRINT OR IF THEY ARE TRYING TO COMPLY UNDER THE
 BUILDINGS ON THE SAME LOT, SECTION 503.1.2.
  
 1D) FIRE SPRINKLER PLANS WILL BE REQUIRED FOR EITHER AN
 I OCCUPANCY (903.2.6) OR AN R OCCUPANCY (903.2.8.)
 W. P. B. ADMINISTRATIVE CODE105.3.1.2(2) FIRE SPRINKLER
 DOCUMENTS FOR ANY NEW BUILDING OR ADDITION WHICH
 INCLUDES A FIRE SPRINKLER SYSTEM WHICH CONTAINS 50 OR
 MORE SPRINKLER HEADS. A CONTRACTOR I, CONTRACTOR II OR
 CONTRACTOR IV, CERTIFIED UNDER SECTION 633.521, FLORIDA
 STATUTES, MAY DESIGN A FIRE
 SPRINKLER SYSTEM OF 49 OR FEWER HEADS AND MAY DESIGN
 THE ALTERATION OF AN EXISTING FIRE SPRINKLER SYSTEM IF
 THE ALTERATION CONSISTS OF THE RELOCATION, ADDITION OR
 DELETION OF NOT MORE THAN 49 HEADS, NOT WITHSTANDING
 THE SIZE OF THE EXISTING FIRE SPRINKLER SYSTEM.
  
 2) 2014 FBC-B 1803.5.2 QUESTIONABLE SOIL. WHERE THE
 CLASSIFICATION, STRENGTH OR COMPRESSIBILITY OF THE SOIL
 IS IN DOUBT OR WHERE A LOAD-BEARING VALUE SUPERIOR TO
 THAT SPECIFIED IN THIS CODE IS CLAIMED, THE BUILDING
 OFFICIAL SHALL BE PERMITTED TO REQUIRE THAT A
 GEOTECHNICAL INVESTIGATION BE CONDUCTED.
  
 3) PLEASE SUBMIT ENERGY CALCULATIONS. 2014 FBC-ENERGY
 CODE. C401.2 APPLICATION.
 COMMERCIAL BUILDINGS SHALL COMPLY WITH ONE OF THE
 FOLLOWING:
 1. THE REQUIREMENTS OF ANSI/ASHRAE/IESNA 90.1.
 2. THE REQUIREMENTS OF SECTIONS C402, C403, C404 AND
 C405. IN ADDITION, COMMERCIAL BUILDINGS SHALL COMPLY
 WITH EITHER SECTION C406.2, C406.3 OR C406.4.
 3. THE REQUIREMENTS OF SECTION C407, C402.4, C403.2,
 C404, C405.2, C405.3, C405.4, C405.6 AND C405.7. THE
 BUILDING ENERGY COST SHALL BE EQUAL TO OR LESS THAN 85
 PERCENT OF THE STANDARD REFERENCE DESIGN BUILDING.
  
 4) ART IN PUBLIC PLACES. THE CITY OF WEST PALM BEACH
 ART IN PUBLIC PLACES ORDINANCE REQUIREMENT THAT APPLIES
 TO ANY REMODEL OR NEW CONSTRUCTION PROJECT FOR WHICH
 THE PERMIT APPLICATION WAS SUBMITTED AFTER 6/29/14, AND
 THE TOTAL PROJECT CONSTRUCTION COSTS ARE EQUAL TO OR
 GREATER THAN $750,000 WILL NEED TO COMPLY WITH THIS
 ORDINANCE. PER CITY OF WEST PALM BEACH ORDINANCE NO.
 4504-14, AND CITY OF WEST PALM BEACH CODE OF
 ORDINANCES, ARTICLE V, ART IN PUBLIC PLACES, SECTION
 78-123(A) AND SECTION 78-126(A), THE ART ASSESSMENT IS
 1% OF THE TOTAL PROJECT CONSTRUCTION COST.
 PER CITY OF WEST PALM BEACH CODE OF ORDINANCES, ARTICLE
 V, ART IN PUBLIC PLACES, SECTION 78-122, RENOVATION AND
 NEW CONSTRUCTION PROJECTS ARE ASSESSED CUMULATIVELY, SO
 THE ART ASSESSMENT WILL BE APPLICABLE TO ALL FUTURE
 PROJECTS.
 FOR CONTACT INFORMATION PLEASE CONTACT:
 MS. SYBILLE WELTER ART IN PUBLIC PLACES COORDINATOR
 822-1515 E-MAIL: [email protected]
  
 5) SHEET A4: UNITS 1A, 1B, 2D & 2E ALL SHOW WHAT
 APPEARS TO BE EITHER A DIVIDER OR PONY WALL (HALF
 WALL).
 THE PLANS DO NOT HAVE A DETAIL OF THIS AREA, AND THERE
 IS NO FURNITURE PLAN SHOWING IF THERE IS 2 BEDS OR 4
 BEDS IN EACH OF THE IDENTIFIED BEDROOMS. AGAIN THE
 OCCUPANT LOAD CANNOT BE IDENTIFIED NOR CAN THE PLUMBING
 FIXTURE COUNT. FBC-B TABLE 1004.1.2.
  
 6) PLEASE SHOW HOW COMPLIANCE WITH FBC-B SECTION 420 IS
 ACHIEVED.
 420.1 OCCUPANCIES IN GROUPS I-1, R-1, R-2 AND R-3 SHALL
 COMPLY WITH THE PROVISIONS OF SECTIONS 420.1 THROUGH
 420.5 AND OTHER APPLICABLE PROVISIONS OF THIS CODE.
  
 420.2 SEPARATION WALLS. WALLS SEPARATING DWELLING UNITS
 IN THE SAME BUILDING, WALLS SEPARATING SLEEPING UNITS
 IN THE SAME BUILDING AND WALLS SEPARATING DWELLING OR
 SLEEPING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO
 THEM IN THE SAME BUILDING SHALL BE CONSTRUCTED AS FIRE
 PARTITIONS IN ACCORDANCE WITH SECTION 708.
  
 420.3 HORIZONTAL SEPARATION. FLOOR ASSEMBLIES
 SEPARATING DWELLING UNITS IN THE SAME BUILDINGS, FLOOR
 ASSEMBLIES SEPARATING SLEEPING UNITS IN THE SAME
 BUILDING AND FLOOR ASSEMBLIES SEPARATING DWELLING OR
 SLEEPING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO
 THEM IN THE SAME BUILDING SHALL BE CONSTRUCTED AS
 HORIZONTAL ASSEMBLIES IN ACCORDANCE WITH SECTION 711.
  
 [F] 420.4 AUTOMATIC SPRINKLER SYSTEM. GROUP R
 OCCUPANCIES SHALL BE EQUIPPED THROUGHOUT WITH AN
 AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION
 903.2.8. GROUP I-1 OCCUPANCIES SHALL BE EQUIPPED
 THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM IN
 ACCORDANCE WITH SECTION 903.2.6. QUICKRESPONSE OR
 RESIDENTIAL AUTOMATIC SPRINKLERS SHALL BE INSTALLED IN
 ACCORDANCE WITH SECTION 903.3.2.
  
 [F] 420.5 SMOKE DETECTION AND FIRE ALARM SYSTEMS. FIRE
 ALARM SYSTEMS AND SMOKE ALARMS SHALL BE PROVIDED IN
 GROUP I-1, R-1 AND R-2 OCCUPANCIES IN ACCORDANCE WITH
 SECTIONS 907.2.6, 907.2.8 AND 907.2.9, RESPECTIVELY.
 SINGLE-OR MULTIPLE-STATION SMOKE ALARMS SHALL BE IN
 ACCORDANCE WITH SECTION 907.2.11.
  
 7) SHEET A8 & A9 SHOW PRESSURES FOR COMPONENTS AND
 CLADDING, BUT THERE IS NO WIND DESIGN CRITERIA TO KNOW
 IF THESE PRESSURES ARE ACCURATE. 2014 FBC-B 1603.1.4
 WIND DESIGN DATA.
 THE FOLLOWING INFORMATION RELATED TO WIND LOADS SHALL
 BE SHOWN, REGARDLESS OF WHETHER WIND LOADS GOVERN THE
 DESIGN OF THE LATERAL FORCE-RESISTING SYSTEM OF THE
 STRUCTURE:
  
 7.1. ULTIMATE DESIGN WIND SPEED, VULT, (3-SECOND GUST),
 MILES PER HOUR (KM/HR) AND NOMINAL DESIGN WIND SPEED,
 VASD, AS DETERMINED IN ACCORDANCE WITH SECTION
 1609.3.1.
  
 7.2. RISK CATEGORY.
  
 7.3. WIND EXPOSURE. APPLICABLE WIND DIRECTION IF MORE
 THAN ONE WIND EXPOSURE IS UTILIZED. TABLE 1609.7.2.
 HEIGHT AND EXPOSURE.
  
 7.4. APPLICABLE INTERNAL PRESSURE COEFFICIENT.
  
 7.5. DESIGN WIND PRESSURES TO BE USED FOR EXTERIOR
 COMPONENT AND CLADDING MATERIALS NOT SPECIFICALLY
 DESIGNED BY THE REGISTERED DESIGN PROFESSIONAL
 RESPONSIBLE FOR THE DESIGN OF THE STRUCTURE, PSF (KN/
 M2).
 TABLE 1609.7(2) ADJUSTMENT FACTORS FOR HEIGHT &
 EXPOSURE. PROVIDE THE MEAN ROOF HEIGHT FOR THE
 BUILDING.
 1609.3.1 WIND SPEED CONVERSION VULT TO VASD.
  
 8) 2010/ 2014 FBC-B 1609.1.2 PROTECTION OF OPENINGS,
 1609.6.4.4.1 COMPONENTS & CLADDING. FLORIDA DEPARTMENT
 OF COMMUNITY AFFAIRS, ADMINISTRATIVE CODE 61G20-3.005,
 RULE 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS
 OR CONSTRUCTION SYSTEMS THAT WILL REQUIRE PRODUCT
 APPROVALS:
 (31)(A) EXTERIOR DOORS ,MULLIONS & ROOF HATCHES.
 (B) WINDOWS & MULLIONS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP
 VENTILATORS
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
  
 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH
 ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR
 TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. FL
 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR
 SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS,
 SHOP DRAWINGS ETC..
  
 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
  
 9) IDENTIFY GLAZING/ MULLIONS. FOR ALL PRODUCTS WITH
 GLAZING, PLEASE IDENTIFY THE OPENING WIDTH & HEIGHT,
 TYPE OF GLAZING, MULLION INFORMATION IF REQUIRED,
 ATTACHMENTS AND ASSOCIATE PRESSURES FOR EACH OPENING
 SIZE. 2014 FBC-B 1405.13.1 INSTALLATION. WINDOWS AND
 DOORS SHALL BE INSTALLED IN ACCORDANCE WITH APPROVED
 MANUFACTURERS INSTRUCTIONS. FASTENER SIZE AND SPACING
 SHALL BE PROVIDED IN SUCH INSTRUCTIONS AND SHALL BE
 CALCULATED BASED ON MAXIMUM LOADS AND SPACING USED IN
 THE TESTS.
  
 10) PLANS ARE DEFICIENT IN STAIR DESIGN AS TO TYPE OF
 MATERIAL, LOADING PER SQ. FT. THERE IS NO HANDRAIL OR
 GUARDRAIL DESIGN WITHIN THE PERMIT PACKAGE SET OF
 PLANS.
  
 11) THE PLANS DO NOT INDICATE WHAT THE 2ND FLOOR
 FINISHES WILL BE? PLEASE SHOW COMPLIANCE WITH:
 FOR TILE, STONE, MARBLE AND WOOD FLOORING ALL NEED TO
 HAVE HAD THE SOUND UNDERLAYMENT TESTED FLOOR ASSEMBLIES
 TO THE FOLLOWING STANDARDS AND MEET THE QUALIFICATIONS
 LISTED UNDER EACH OF THE STANDARDS FOR A HAMBRO FLOOR
 SYSTEM/ NO DROPPED CEILING:
 PLEASE PROVIDE TEST REPORTS SHOWING COMPLIANCE WITH:
 11A) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 11B) FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 11C) TYPE III-TYPE V CONSTRUCTION: FBC-B-2014 720.2
 CONCEALED INSTALLATION. INSULATING MATERIALS, WHERE
 CONCEALED AS INSTALLED IN BUILDINGS OF ANY TYPE OF
 CONSTRUCTION, SHALL HAVE A FLAME SPREAD INDEX OF NOT
 MORE THAN 25 AND A SMOKE-DEVELOPED INDEX OF NOT MORE
 THAN 450.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 12) IMPACT FEES. BEFORE A PERMIT TO CONSTRUCT, MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO PALM BEACH COUNTY.
 THE ACTUAL PERMIT SET OF PLANS MUST BE STAMPED BY THAT
 OFFICE, AND A COPY OF THE PAID RECEIPT ATTACHED TO THE
 PERMIT APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 13) THIS REVIEW CYCLE A THOROUGH REVIEW COULD NOT BE
 COMPLETED AND ADDITIONAL AND OR NEW COMMENTS MAY OCCUR
 ON SUBSEQUENT REVIEWS. WHEN RESUBMITTING PLANS PLEASE
 INDICATE THE REVISION & REMOVE ANY VOIDED SHEETS &
 REPLACE ANY PAGES AS NECESSARY, COLLATE AND STAPLE INTO
 SETS OF PLANS. A TRANSMITTAL LETTER LISTING THE
 ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF
 THE REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL
 HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR
 ANTICIPATED COOPERATION.
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST.
 WEST PALM BEACH. FL 33402
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 DEVELOPMENT SERVICES HOME PAGE
 HTTP://WWW.CITYOFWPB.COM/CONSTRUCTION/INDEX.PHP
  
 PLEASE NOTE: FLORIDA HAS A VERY BROAD PUBLIC RECORDS
 LAW. WRITTEN COMMUNICATIONS TO OR FROM LOCAL OFFICIALS
 REGARDING CITY BUSINESS ARE PUBLIC RECORD, AVAILABLE TO
 THE PUBLIC UPON REQUEST. YOUR E-MAIL COMMUNICATIONS ARE
 THEREFORE SUBJECT TO PUBLIC DISCLOSURE.
 MEMBER OF BOAF: BUILDING OFFICIALS ASSOCIATION OF
 FLORIDA SAVING LIVES AND PROPERTY SINCE 1953
  
  
  

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2018-05-10 Cont ID  
Sent By jpearson Date 2018-05-09 Time 16:43 Rev Time 0.00
Received By jpearson Date 2018-05-09 Time 16:43 Sent To  
Notes
2018-05-09 16:43:35PROVISO ITEMS ON PLAN:
  
 1. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR EACH
 PANEL INCLUDING INFORMATION FROM THE POWER COMPANY
 STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR
 THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE
 SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE.
 NEC 110.9, 110.10 (NOT PROVIDED, WE WILL ACCEPT THIS AS
 A DEFERRED SUBMITTAL WITH A NOTE ON PLAN INDICATING
 THAT THE CALCULATION WILL BE PROVIDED BEFORE FINAL.)
 2. ALL EXTERIOR RECEPTACLES REQUIRE GFCI PROTECTION.
 PROVIDE CORRECTION. NEC 210.8 (RECEPTACLES FOR WATER
 HEATERS AND A/C'S NEED GFCI ALSO)
 3. PROVIDE GFCI PROTECTED OUTLET ON THE KITCHEN
 PENINSULA. NEC 210.8, 210.52(C)(3) (NOT PROVIDED)

Review Stop E ELECTRICAL
Rev No 3 Status F Date 2018-04-16 Cont ID  
Sent By jpearson Date 2018-04-16 Time 14:25 Rev Time 0.00
Received By jpearson Date 2018-04-16 Time 10:49 Sent To  
Notes
2018-04-16 14:25:18CODES IN EFFECT:
 FBC = FLORIDA BUILDING CODE 2014 5TH EDITION
 FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2014
 5TH EDITION
 FBC RE = FLORIDA RESIDENTIAL CODE 2014 5TH EDITION
 NEC = NFPA 70 2011 EDITION, NATIONAL ELECTRICAL CODE
 FS = FLORIDA STATUTES
  
 ELECTRICAL REVIEW STATUS: DENIED, SEE COMMENTS BELOW.
  
 1. PROVIDE LOCATION OF ELECTRICAL SERVICE ON PLAN. WPB
 FBC 107.2.1
 2. PROVIDE AVAILABLE SHORT CIRCUIT CALCULATION FOR EACH
 PANEL INCLUDING INFORMATION FROM THE POWER COMPANY
 STATING WHAT THE AVAILABLE SHORT CIRCUIT CURRENT IS FOR
 THE SERVICE TO CONFIRM THE STATED AIC RATING OF THE
 SERVICE EQUIPMENT AND DOWNSTREAM PANELS IS ADEQUATE.
 NEC 110.9, 110.10
 3. BE ADVISED THAT FIRE ALARM, LOW VOLTAGE SYSTEMS,
 DAS, LIGHTNING PROTECTION, GENERATORS, COMMERCIAL HOOD
 SYSTEMS, SIGNS, SITE LIGHTING, AND SWIMMING POOLS
 (WHERE APPLICABLE) ARE NOT INCLUDED IN THE SCOPE OF
 THIS PLAN REVIEW. PROVIDE A BLOCK NOTE INDICATING THE
 REQUIRED SEPARATE PERMITS AND DATA SPECIFICATION SHEET
 SUBMITTALS FOR ANY OF THESE SYSTEMS PRESENT. FBC 105.1,
 107.2.1
 4. PROVIDE CHART OF INTERIOR LIGHTING POWER ALLOWANCES
 EXPRESSED IN WATTAGE PER THE FBC ENERGY CODE IN
 RELATION TO THE WATTAGE OF THE CONNECTED INTERIOR
 LIGHTING PROPOSED TO COMPLY WITH CODE FOR
 NON-RESIDENTIAL AREAS. FOR RESIDENTAIL AREAS, PROVIDE
 NOTE FOR COMPLIANCE: PROVIDE COMPLIANCE: "A MINIMUM OF
 75 PERCENT OF THE LAMPS IN PERMANENTLY INSTALLED
 LIGHTING FIXTURES SHALL BE HIGH-EFFICACY LAMPS OR A
 MINIMUM OF 75 PERCENT OF THE PERMANENTLY INSTALLED
 LIGHTING FIXTURES SHALL CONTAIN ONLY HIGH EFFICACY
 LAMPS". FBC EC 405.5.2
 5. PROVIDE THE ADDITIONAL LIGHTING CONTROLS STIPULATED
 IN THE FBC ENERGY CODE. MANY AREAS DO NOT SHOW THE
 AUTOMATIC CONTROL REQUIRED. FBC EC 405.2.2, 405.2.2.2
 6. PROVIDE ACCURATE LOAD CALCULATION INCLUDING ALL
 LOADS. THE CALCULATION PROVIDED APPLIES DEMAND FACTORS
 ONCE AT THE PANELS, AND THEN AGAIN FOR THE NUMBER OF
 UNITS FOR THE SERVICE. DEMAND FACTORS CAN ONLY BE
 APPLIED ONCE. SEE CODE SECTION FOR EXPLANATION. NEC
 220.84
 7. RISER DIAGRAM SHOWS AN EQUIPMENT GROUNDING CONDUCTOR
 IN THE CONDUIT TO FPL FROM THE METER BASE. THIS CONDUIT
 SHOULD NOT HAVE AN EGC. PROVIDE CORRECTION. NEC 250.6
 8. RISER SHOWS ONE GROUND ROD. SERVICE GROUNDING
 ELECTRODE NEEDS TO BE AUGMENTED BY AN ADDITIONAL
 ELECTRODE AT LEAST 6 FEET AWAY OR PROVIDE EVIDENCE OF
 RESISTANCE TO GROUND OF 25 OHMS OR LESS. PROVIDE
 CORRECTION. NEC 250.56
 9. ALL RECEPTACLES IN KITCHEN FOR COUNTER TOP USE
 REQUIRE GFCI PROTECTION. PROVIDE CORRECTION. NEC 210.8
 10. ALL EXTERIOR RECEPTACLES REQUIRE GFCI PROTECTION.
 PROVIDE CORRECTION. NEC 210.8
 11. PROVIDE GFCI PROTECTED OUTLET ON THE KITCHEN
 PENINSULA. NEC 210.8, 210.52(C)(3)
 12. PROVIDE CORRECT ADDRESS WITH CORRECT STREET NAME ON
 PLAN. FBC 107.2.1
  
 END OF COMMENTS.
  
 PLEASE NOTE: SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. WHEN
 RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RESUBMITTAL FORM. ADDITIONALLY, INSERT CORRECTED PAGES
 INTO THE ORIGINAL SUBMITTAL AND REMOVE OR VOID THE
 PREVIOUSLY REVIEWED SHEETS.
  
 SINCERELY,
  
 JOHN PEARSON
 ELECTRICAL PLANS EXAMINER
 561-805-6746
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2018-04-16 Cont ID  
Sent By jpearson Date 2017-09-20 Time 07:12 Rev Time 0.00
Received By jpearson Date 2017-09-20 Time 07:12 Sent To  
Notes
2018-04-16 12:56:26CHANGED STATUS TO FAIL PER REVIEW DATED 4-16-18

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2018-04-16 Cont ID  
Sent By jleahy Date 2017-05-15 Time 14:19 Rev Time 0.00
Received By jpearson Date 2017-05-15 Time 13:09 Sent To  
Notes
2018-04-16 12:55:55CHANGED STATUS TO FAIL PER REVIEW DATED 4-16-18

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2018-04-20 Cont ID  
Sent By Mgonzale Date 2018-04-20 Time   Rev Time 1.00
Received By mgonzale Date 2018-04-20 Time   Sent To I
Notes
2018-04-05 13:15:40SEE E18010008

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2017-10-12 Cont ID  
Sent By mgonzale Date 2017-10-12 Time   Rev Time 1.00
Received By mgonzale Date 2017-10-12 Time   Sent To I
Notes
2017-10-12 16:25:47ADDRESS PLANNING COMMENTS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2017-05-18 Cont ID  
Sent By mgonzale Date 2017-05-18 Time   Rev Time 1.00
Received By mgonzale Date 2017-05-18 Time   Sent To I
Notes
2017-05-18 15:46:39SEPERATE DEVELOPMENT PERMIT WILL BE REQUIRED THRU
 ENGINEERING DEPARTMENT.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 HTTPS://WETRANSFER.COM/
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2018-04-17 Cont ID  
Sent By pleduc Date 2018-04-17 Time   Rev Time 0.00
Received By pleduc Date 2018-04-16 Time 15:31 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2017-09-06 Cont ID  
Sent By pleduc Date 2017-09-06 Time   Rev Time 0.00
Received By pleduc Date 2017-09-05 Time 15:50 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2017-05-04 Cont ID  
Sent By pleduc Date 2017-05-04 Time   Rev Time 0.00
Received By pleduc Date 2017-05-04 Time 13:31 Sent To  
Notes
2017-05-04 14:59:59THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) SHEET A 1 - THERE ARE REFERENCES TO ANY CURRENT
 EDITIONS OF THE NFPA 1 & 101.
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.
  
 PLEASE CORRECT.
  
  
 2) A LIFE SAFETY REVIEW SHEET WAS NOT PROVIDED
 INDICATING COMPLIANCE WITH ANY LIFE SAFETY OCCUPANCY
 CHAPTER OF NFPA 101. IT APPEARS THAT THE OCCUPANCY MAY
 BE CHAPTER IS NFPA 101, CHAPTER 30, NEW APARTMENT
 BUILDINGS. CHAPTER 32 RESIDENTIAL BOARD AND CARE, OR
 CHAPTER 26 LODGING AND ROOMING HOUSES.
  
 IT APPEARS THAT THERE ARE TWO SEPARATE SLEEPING AREAS
 PER BEDROOM.
  
 PLEASE REVIEW AND PROVIDE DETAILS AS TO THE USE AND
 FUNCTION OF THESE APARTMENTS AND THE APPLICABLE NFPA
 101 OCCUPANCY CHAPTER AND ALL LIFE SAFETY FEATURES
 REQUIREMENTS OF THAT CHAPTER.
  
  
  
 3) SHEET A 3 - THE IS AN AREA INDICATED AS CASUAL
 ROOM/GUEST ROOM THAT APPEARS TO BE AN ASSEMBLY
 SPACE/OCCUPANCY.
  
 THERE IS NO INDICATION OF COMPLAINCE WITH THE ASSEMBLY
 OCCPANCY CODE.
  
 PLEASE REVIEW AND COORECT ENSURE COMPLIANCE WITH ALL
 APPLICABLE NFPA 101 REQUIREMENTS.
  
  
  
 4) SHEET A 3 - A DOOR/GATE, # 11, IS INDICATED IN THE
 PATH OF EXIT TRAVEL. BUT NO DETAIL PROVIDED AS TO THE
 EXIT HARDWARE IN COMPLINACE WITH NFPA 101, CHAPTER 7,
 MEANS OF EGRESS.
  
 30.2.2.2 DOORS.
 30.2.2.2.1 DOORS COMPLYING WITH 7.2.1 SHALL BE
 PERMITTED.
 30.2.2.2.2 DOOR-LOCKING ARRANGEMENTS SHALL COMPLY WITH
 30.2.2.2.2.1, 30.2.2.2.2.2, 30.2.2.2.2.3, OR
 30.2.2.2.2.4.
 30.2.2.2.2.1* NO DOOR IN ANY MEANS OF EGRESS SHALL BE
 LOCKED AGAINST EGRESS WHEN THE BUILDING IS OCCUPIED.
  
 7.2.1.4 SWING AND FORCE TO OPEN.
 7.2.1.4.1* SWINGING-TYPE DOOR ASSEMBLY REQUIREMENT. ANY
 DOOR ASSEMBLY IN A MEANS OF EGRESS SHALL BE OF THE
 SIDE-HINGED OR PIVOTED-SWINGING TYPE, AND SHALL BE
 INSTALLED TO BE CAPABLE OF SWINGING FROM ANYPOSITION TO
 THE FULL REQUIRED WIDTH OF THE OPENING IN WHICH IT IS
 INSTALLED, UNLESS OTHERWISE SPECIFIED AS FOLLOWS:
 (1) DOOR ASSEMBLIES IN DWELLING UNITS, AS PROVIDED IN
 CHAPTER 24, SHALL BE PERMITTED.
 (2) DOOR ASSEMBLIES IN RESIDENTIAL BOARD AND CARE
 OCCUPANCIES, AS PROVIDED IN CHAPTERS 32 AND 33, SHALL
 BE PERMITTED.
 (3) WHERE PERMITTED IN CHAPTERS 11 THROUGH 43,
 HORIZONTAL-SLIDING OR VERTICAL-ROLLING SECURITY GRILLES
 OR DOOR ASSEMBLIES THAT ARE PART OF THE REQUIRED MEANS
 OF EGRESS SHALL BE PERMITTED, PROVIDED THAT ALL OF THE
 FOLLOWING CRITERIA ARE MET:
 (A) SUCH GRILLES OR DOOR ASSEMBLIES SHALL REMAIN
 SECURED IN THE FULLY OPEN POSITION DURING THE PERIOD OF
 OCCUPANCY BY THE GENERAL PUBLIC.
 (B) ON OR ADJACENT TO THE GRILLE OR DOOR OPENING, THERE
 SHALL BE A READILY VISIBLE, DURABLE SIGN IN LETTERS NOT
 LESS THAN 1 IN. (25 MM) HIGH ON A CONTRASTING
 BACKGROUND THAT READS AS FOLLOWS: THIS DOOR TO REMAIN
 OPEN WHEN THE BUILDING IS OCCUPIED.
 (C) DOOR LEAVES OR GRILLES SHALL NOT BE BROUGHT TO THE
 CLOSED POSITION WHEN THE SPACE IS OCCUPIED.
 (D) DOOR LEAVES OR GRILLES SHALL BE OPERABLE FROM
 WITHIN THE SPACE WITHOUT THE USE OF ANY SPECIAL
 KNOWLEDGE OR EFFORT.
 (E) WHERE TWO OR MORE MEANS OF EGRESS ARE REQUIRED, NOT
 MORE THAN HALF OF THE MEANS OF EGRESS SHALL BE EQUIPPED
 WITH HORIZONTAL-SLIDING OR VERTICAL-ROLLING GRILLES OR
 DOOR ASSEMBLIES.
  
 7.2.1.5 LOCKS, LATCHES, AND ALARM DEVICES.
 7.2.1.5.1 DOOR LEAVES SHALL BE ARRANGED TO BE OPENED
 READILY FROM THE EGRESS SIDE WHENEVER THE BUILDING IS
 OCCUPIED.
 7.2.1.5.2* THE REQUIREMENT OF 7.2.1.5.1 SHALL NOT APPLY
 TO DOOR LEAVES OF LISTED FIRE DOOR ASSEMBLIES AFTER
 EXPOSURE TO ELEVATED TEMPERATURE IN ACCORDANCE WITH THE
 LISTING, BASED ON LABORATORY FIRE TEST PROCEDURES.
 7.2.1.5.3 LOCKS, IF PROVIDED, SHALL NOT REQUIRE THE USE
 OF A KEY, A TOOL, OR SPECIAL KNOWLEDGE OR EFFORT FOR
 OPERATION FROM THE EGRESS SIDE.
  
  
 PLEASE PROVIDE DETAILS MEETING THE REQUIREMENTS.
  
  
  
  
 5) SHEET A 3 & 5 - STAIRS, HARDRAILS AND RAILINGS ARE
 INDICATED; HOWEVER NO DETAILS ARE PROVIDED.
  
 PER NFPA 101, CHAPTER 7, MEANS OF EGRESS
  
 7.2.2 STAIRS.
 7.2.2.1 GENERAL.
 7.2.2.1.1 STAIRS USED AS A COMPONENT IN THE MEANS OF
 EGRESS SHALL CONFORM TO THE GENERAL REQUIREMENTS OF
 SECTION 7.1 AND TO THE SPECIAL REQUIREMENTS OF 7.2.2,
 UNLESS OTHERWISE SPECIFIED IN 7.2.2.1.2.
  
 7.2.2.3 STAIR DETAILS.
 7.2.2.3.1 CONSTRUCTION.
 7.2.2.3.1.1 ALL STAIRS SERVING AS REQUIRED MEANS OF
 EGRESS SHALL BE OF PERMANENT FIXED CONSTRUCTION, UNLESS
 THEY ARE STAIRS SERVING SEATING THAT IS DESIGNED TO BE
 REPOSITIONED IN ACCORDANCE WITH CHAPTERS 12 AND 13.
  
 7.2.2.4 GUARDS AND HANDRAILS.
 7.2.2.4.1 HANDRAILS.
 7.2.2.4.1.1 STAIRS AND RAMPS SHALL HAVE HANDRAILS ON
 BOTH SIDES, UNLESS OTHERWISE PERMITTED IN 7.2.2.4.1.5
 OR 7.2.2.4.1.6.
  
 PLEASE PROVIDE DETAILS MEETING THE REQUIREMENTS
  
  
  
 6) SEET A 6 & 7 - THERE ARE NO EXIT SIGNS IN ANY EXIT
 CORRIDOR OR ASSEMBLY AREAS.
  
 NFPA 101
  
 ILLUMINATION OF MEANS OF EGRESS. MEANS OF EGRESS SHALL
 BE ILLUMINATED IN ACCORDANCE WITH SECTION 7.8.
  
 MARKING OF MEANS OF EGRESS. MEANS OF EGRESS SHALL HAVE
 SIGNS IN ACCORDANCE WITH SECTION 7.10 IN ALL BUILDINGS
 REQUIRING MORE THAN ONE EXIT.
  
  
  
  
 7) ANY SHEETS - THE SUBMITTAL DOES NOT INDICATED EXITS
 LEADING TO A PUBLIC WAY.
  
 DISCHARGE FROM EXITS. EXIT DISCHARGE SHALL COMPLY WITH
 SECTION 7.7.
  
 7.7 DISCHARGE FROM EXITS.
 7.7.1* EXIT TERMINATION. EXITS SHALL TERMINATE
 DIRECTLY, AT A PUBLIC WAY OR AT AN EXTERIOR EXIT
 DISCHARGE, UNLESS OTHERWISE PROVIDED IN 7.7.1.2 THROUGH
 7.7.1.4.
  
 PLEASE PROVIDE A DETAIL INDICATING COMPLIANCE WITH THE
 REQUIREMENTS.
  
  
  
  
 8) NO SHEET SUBMITTALS - THERE ARE NO FIRE SPRINKLER
 DOCUMENTS WITH THIS SUBMITTAL.
  
 30.3.5 EXTINGUISHMENT REQUIREMENTS.
 30.3.5.1 ALL BUILDINGS SHALL BE PROTECTED THROUGHOUT BY
 AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM
 INSTALLED IN ACCORDANCE WITH 30.3.5.2.
  
 PER FLORIDA ADMINISTRATIVE CODE SECTION 61G15-32.004,
 FIRE PROTECTION ENGINEERING DOCUMENTS SHALL INCLUDE THE
 POINT OF SERVICE FOR THE WATER SUPPLY, A LIST OF
 APPLICABLE NFPA STANDARDS APPLICABLE TO THE PROJECT,
 CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA, SUPPRESSION SYSTEM TYPE, DESIGN DENSITIES, WATER
 SUPPLY DATA (FIRE PUMP DATA, HYDRANT FLOW TEST DATA)
 AND ANY PERFORMANCE BASED INFORMATION SUCH AS
 PRE-ENGINEERED SYSTEMS.
  
 61G15-32.003 COMMON REQUIREMENTS TO ALL FIRE PROTECTION
 ENGINEERING
 DOCUMENTS.
 (1) THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS
 SHALL PROVIDE THE ENGINEERING REQUIREMENTS TO BE USED
 IN THE PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT
 DOCUMENTS AND TO INDICATE THE NATURE AND SCOPE OF THE
 WORK, AND TO DESCRIBE, DETAIL, DIMENSION, LABEL AND
 DEFINE THE FIRE PROTECTION COMPONENTS, SYSTEM(S),
 MATERIALS, ASSEMBLIES, EQUIPMENT AND ITS STRUCTURAL AND
 UTILITY SUPPORT SYSTEM(S), INSOFAR AS THEY INVOLVE THE
 SAFEGUARDING OF LIFE, HEALTH OR PROPERTY.
 (2) THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS
 SHALL SPECIFY THE APPLICABLE REQUIREMENTS FOR THE
 ACCEPTANCE TESTING OF THE FIRE PROTECTION SYSTEM AND
 COMPONENTS, WHICH SHALL BE BASED UPON APPLICABLE CODES
 AND STANDARDS, WHERE AVAILABLE.
 (3) THE OCCUPANCY OF THE AREA OR DESCRIPTION OF A
 SPECIFIC HAZARD BEING PROTECTED BY THE FIRE PROTECTION
 SYSTEM(S) SHALL BE SHOWN ON THE FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENTS.
 (4) THE APPLICABLE CODE AND STANDARD TO BE USED IN THE
 PREPARATION OF THE FIRE PROTECTION SYSTEM LAYOUT
 DOCUMENTS SHALL BE SHOWN ON THE FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENTS. WHEN CODES AND STANDARDS ARE NOT
 AVAILABLE OR APPLICABLE, AND SAID LAYOUT DOCUMENTS ARE
 TO BE BASED ON ENGINEERING JUDGMENT, ANY REASONS AND
 ASSUMPTIONS MADE TO DEVELOP THE FIRE PROTECTION CONCEPT
 SHALL BE IDENTIFIED ON THE FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENTS.
 (5) STRUCTURAL SUPPORT AND STRUCTURAL OPENINGS REQUIRED
 BY THE FIRE PROTECTION SYSTEM SHALL BE SHOWN ON THE
 FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS AND SHALL
 BE REFERENCED ON STRUCTURAL ENGINEERING DOCUMENTS.
 (6) WHEN LAYOUT DOCUMENTS CONTAIN MATERIAL DEVIATION
 FROM THE ENGINEER OF RECORD'S FIRE PROTECTION SYSTEM
 ENGINEERING DOCUMENT, SUCH LAYOUT DOCUMENTS ARE NOT
 COMPLIANT UNLESS THEY ARE ACCOMPANIED BY REVISED
 ENGINEERING DOCUMENTS MADE AND SEALED BY THE ENGINEER
 OF RECORD FOR THE FIRE PROTECTION SYSTEM.
 (7) REQUIREMENTS FOR ACTIVATION CONTROL SYSTEMS,
 SEQUENCE, OPERATING PARAMETERS, INTERLOCKS, SAFETY
 RELATED DEVICES, INDICATORS AND ALARMS, SHALL BE SHOWN
 ON THE FIRE PROTECTION SYSTEM ENGINEERING DOCUMENTS,
 UNLESS SHOWN ON OTHER RELATED DOCUMENTS.
 (8) ANY INFORMATION DEEMED APPROPRIATE BY THE ENGINEER
 OF RECORD TO ASSIST THE AUTHORITY HAVING JURISDICTION
 IN UNDERSTANDING THE OWNER?S INTENDED USE AND PROPOSED
 PROTECTION OF THE BUILDING OR FACILITY AND TO PROVIDE
 SUFFICIENT DIRECTION TO THE INSTALLATION CONTRACTOR OR
 OTHER INTERESTED PARTIES REGARDING THE LAYOUT OF THE
 SYSTEM(S), SHALL BE INCLUDED IN THE FIRE PROTECTION
 SYSTEM ENGINEERING DOCUMENTS.
 SPECIFIC AUTHORITY 471.008, 471.033(2), FS
 LAW IMPLEMENTED 471.005(7), 471.033(2), FS
 HISTORY?NEW 5-19-93, FORMERLY 21H-32.003, AMENDED
 4-2-2000, 6-26-01
  
 61G15-32.004 DESIGN OF WATER BASED FIRE PROTECTION
 SYSTEMS.
 (1) WATER BASED FIRE PROTECTION SYSTEMS INCLUDE, BUT
 ARE NOT LIMITED TO, AUTOMATIC SPRINKLER SYSTEMS OF WET,
 DRY, FINE WATER SPRAY (MIST), MANUAL, AND DELUGE VALVE
 CONTROLLED TYPES, PUMPING SYSTEMS, STANDPIPES, FIRE
 WATER MAINS AND DEDICATED FIRE PROTECTION WATER
 SOURCES.
 (2) TO ENSURE MINIMUM DESIGN QUALITY IN FIRE PROTECTION
 SYSTEM ENGINEERING DOCUMENTS, SAID DOCUMENTS SHALL
 INCLUDE AS A MINIMUM THE FOLLOWING INFORMATION WHEN
 APPLICABLE:
 (A) THE POINT OF SERVICE FOR THE FIRE PROTECTION WATER
 SUPPLY AS DEFINED BY 633.021(18) F.S.
 (B) APPLICABLE NFPA STANDARD TO BE APPLIED, OR IN THE
 CASE WHERE NO SUCH STANDARD EXISTS, THE ENGINEERING
 STUDY, JUDGMENTS, AND/OR PERFORMANCE BASED ANALYSIS AND
 CONCLUSIONS.
 (C) CLASSIFICATION OF HAZARD OCCUPANCY FOR EACH ROOM OR
 AREA.
 (D) DESIGN APPROACH, WHICH INCLUDES SYSTEM TYPE,
 DENSITIES, DEVICE TEMPERATURE RATING, AND SPACING FOR
 EACH SEPARATE 42 HAZARD OCCUPANCY.
 (E) CHARACTERISTICS OF WATER SUPPLY TO BE USED, SUCH AS
 MAIN SIZE AND LOCATION, WHETHER IT IS DEAD-END OR
 CIRCULATING; AND IF DEAD-END, THE DISTANCE TO THE
 NEAREST CIRCULATING MAIN, AS WELL AS ITS MINIMUM
 DURATION AND RELIABILITY FOR THE MOST HYDRAULICALLY
 DEMANDING DESIGN AREA.
 (F) WHEN PRIVATE OR PUBLIC WATER SUPPLIES ARE USED, THE
 FLOW TEST DATA, INCLUDING DATE AND TIME OF TEST, WHO
 CONDUCTED TEST OR SUPPLIED INFORMATION, TEST ELEVATION,
 STATIC GAUGE PRESSURE AT NO FLOW, FLOW RATE WITH
 RESIDUAL GAUGE PRESSURE, HYDRANT BUTT COEFFICIENT, AND
 LOCATION OF TEST IN RELATION TO THE HYDRAULIC POINT OF
 SERVICE.
 (G) VALVING AND ALARM REQUIREMENTS TO MINIMIZE
 POTENTIAL FOR IMPAIRMENTS AND UNRECOGNIZED FLOW OF
 WATER.
 (H) MICROBIAL INDUCED CORROSION (MIC). THE ENGINEER OF
 RECORD SHALL MAKE REASONABLE EFFORTS TO IDENTIFY WATER
 SUPPLIES THAT COULD LEAD TO MICROBIAL INDUCED CORROSION
 (MIC). SUCH EFFORTS MAY CONSIST OF DISCUSSIONS WITH THE
 LOCAL WATER PURVEYOR AND/OR FIRE OFFICIAL, FAMILIARITY
 WITH CONDITIONS IN THE LOCAL AREA, OR LABORATORY
 TESTING OF WATER SUPPLIES. WHEN CONDITIONS ARE FOUND
 THAT MAY RESULT IN MIC CONTAMINATION OF THE FIRE
 PROTECTION PIPING, THE ENGINEER SHALL DESIGN CORRECTIVE
 MEASURES.
 (I) BACKFLOW PREVENTION AND METERING SPECIFICATIONS AND
 DETAILS TO MEET LOCAL WATER PURVEYOR REQUIREMENTS
 INCLUDING MAXIMUM ALLOWABLE PRESSURE DROP.
 (J) QUALITY AND PERFORMANCE SPECIFICATIONS OF ALL YARD
 AND INTERIOR FIRE PROTECTION COMPONENTS.
 (3) CONTRACTOR SUBMITTALS WHICH DEVIATE FROM THE ABOVE
 MINIMUM DESIGN PARAMETERS SHALL BE CONSIDERED MATERIAL
 DEVIATIONS AND REQUIRE SUPPLEMENTAL ENGINEERING
 APPROVAL AND DOCUMENTATION.
 (4) IN THE EVENT THE ENGINEER OF RECORD PROVIDES MORE
 INFORMATION AND DIRECTION THAN IS ESTABLISHED ABOVE, HE
 OR SHE SHALL BE HELD RESPONSIBLE FOR THE TECHNICAL
 ACCURACY OF THE WORK IN ACCORDANCE WITH APPLICABLE
 CODES, STANDARDS, AND SOUND ENGINEERING PRINCIPLES.
 SPECIFIC AUTHORITY 471.008, 471.033(2), FS
 LAW IMPLEMENTED 471.005(7), 471.033(2), FS
 HISTORY?NEW 5-19-93, FORMERLY 21H-32.004, AMENDED
 4-2-2000, 6-26-01, 7-12-05
  
  
 PLEASE REVIEW AND PROVIDES APPLICABLE SIGNED AND SEALED
 EOR PLAN SHEETS OR WRITTEN NARRATIVE DOCUMENT
 CONTAINING THE SAME INFO. SHOP DRAWINGS CAN THEN BE
 PRODUCED, PREPARED AND SUBITTED SEPARATELY BY A FIRE
 SPRINKLER CONTRACTOR.
  
  
  
 9) SHEET A 8 & 9 - LIGHTWEIGHT TRUSS FLOORS AND TRUSSES
 ARE INDICATED.
  
 PER FLORIDA 69A-60.0081; NOTICE SIGNAGE IS REQUIRED FOR
 STRUCTURES WITH LIGHT-FRAME TRUSS-TYPE CONSTRUCTION.
 ANY COMMERCIAL, INDUSTRIAL, OR ANY MULTIUNIT
 RESIDENTIAL STRUCTURE OF THREE UNITS OR MORE WHICH USES
 HORIZONTAL OR VERTICAL LIGHT-FRAME TRUSS-TYPE
 CONSTRUCTION IN ANY PORTION SHALL BE MARKED WITH A
 MALTESE CROSS SIGN MEASURING 8 INCHES HORIZONTALLY AND
 8 INCHES VERTICALLY, OF A BRIGHT RED REFLECTIVE COLOR.
 THE APPROVED SYMBOL SHALL BE PLACED WITHIN 24 INCHES TO
 THE LEFT OF THE MAIN ENTRY DOOR.
 1. STRUCTURES WITH LIGHT-FRAME TRUSS ROOFS SHALL BE
 MARKED WITH THE LETTER "R".
 2. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR SYSTEMS
 SHALL BE MARKED WITH THE LETTER "F".
 3. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR AND ROOF
 SYSTEMS SHALL BE MARKED WITH THE LETTERS "R/F".
  
  
  
 10) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
 11) THERE IS INSUFFICIENT INFORMATION SUBMITTED TO DO A
 COMPLETE REVIEW OF THE LIFE SAFETY FEATURES AND
 PROTECTION OF THIS PROJECT.
  
 ADDITIONAL COMMENTS MAY BE PROVIDED ON THE RE-SUBMITTAL
 OF THE ABOVE.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
2017-05-04 14:49:00 
  

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-04-20 Cont ID  
Sent By gjohnson Date 2018-04-20 Time 10:45 Rev Time 0.00
Received By gjohnson Date 2018-04-20 Time 10:45 Sent To  
Notes
2018-04-20 10:46:07 
 PLUMBING/GAS PROVISO:
 1. INDICATE ON THE PLAN WHICH DESIGN SPEC A OR B IS
 BEING USED FOR THE BATHROOMS IN THE GROUND FLOOR UNITS.
 PER FHA DESIGN MANUAL REQUIREMENT #7
 2. PROVIDE DETAILS SHOWING THE MOUNTING HEIGHTS OF THE
 BACKING FOR THE GRAB BARS IN THE BATHROOMS. PER FHA
 DESIGN MANUAL REQUIREMENT #6
 3. PROVIDE ON JOBSITE FOR INSPECTIONS THE MANUFACTURE
 SPECIFICATIONS AND INSTALLATION GUIDES FOR THE TANKLESS
 WATER HEATERS AND PRESSURE REGULATORS. PER WPB AMEND TO
 FBC 107.2.1
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2017-09-26 Cont ID  
Sent By gjohnson Date 2017-09-26 Time 18:01 Rev Time 0.00
Received By gjohnson Date 2017-09-26 Time 18:01 Sent To  
Notes
2017-09-26 18:26:342ND REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 GAS COMMENTS:
  
 1. THE FIRST BRANCH OF GALV PIPE FEED 4 TANKLESS
 HEATERS SHALL BE 1' . PER FBC FG TABLE 402.4(5)
  
 2. THE TANKLES WATER HEATER SHALL BE MOUNTED 4' AWAY
 FROM ALL OPENINGS PLEASE PROVIDE MANUFACTURE
 INSTILLATION GUIDE TO VERIFY. PER WPB AMEN TO FBC
 107.2.1
  
 3. SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL
 GAS REGULATORS TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2
  
 4. PLEASE PROVIDE SEDIMENT TRAPS AT EACH APPLIANCE. PER
 FBC FG 408.4
  
 5. SHOW SYSTEM PRESSURE ON RISER DIAGRAM FOR CLARITY IT
 SHOWS A REGULATOR AFTER THE METER AND THEN ON AT EACH
 APPLIANCE . WPB AMEND TO FBC 107.2.1
  
  
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-05-18 Cont ID  
Sent By gjohnson Date 2017-05-18 Time 10:08 Rev Time 0.00
Received By gjohnson Date 2017-05-18 Time 10:08 Sent To  
Notes
2017-05-18 10:10:201ST REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 GAS COMMENTS:
  
 1. THE FIRST SECTION OF PE PIPE SHALL BE 1 1/4" PER FBC
 FUEL GAS TABLE 402.4(22) USING LONGEST LENGTH METHOD @
 265'-8" WHICH WOULD BE ROUNDED TO 300' ON THE TABLE.
  
 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE
 FBC-2014 FUEL GAS CODE SEC. 304.
  
 3. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND
 TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE
 SEC. 502 THRU 505.
  
 4. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL
 GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2
  
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2018-05-15 Cont ID  
Sent By skennedy Date 2018-05-15 Time 16:03 Rev Time 0.00
Received By skennedy Date 2018-05-09 Time 14:22 Sent To  
Notes
2018-05-09 14:23:36SENT TO JPEARSON DESK.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-04-27 Cont ID  
Sent By lmarchan Date 2018-04-27 Time 15:21 Rev Time 0.00
Received By lmarchan Date 2018-04-26 Time 15:16 Sent To  
Notes
2018-04-27 15:21:36IMPACT FEES GIVEN TO SKENNEDY, WILL REVIEW WHEN THEY
 RESUBMIT. LEM
2018-04-27 15:16:42IMPACT FEES ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-04-21 Cont ID  
Sent By shill Date 2018-04-20 Time 09:49 Rev Time 0.00
Received By shill Date 2018-04-05 Time 12:16 Sent To  
Notes
2018-04-05 13:55:49C05

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-10-12 Cont ID  
Sent By cpuell Date 2017-10-12 Time 16:15 Rev Time 0.00
Received By cpuell Date 2017-08-31 Time 10:51 Sent To  
Notes
2017-09-01 10:51:26C36

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-05-19 Cont ID  
Sent By lmarchan Date 2017-05-19 Time 10:01 Rev Time 0.00
Received By lmarchan Date 2017-04-27 Time 15:08 Sent To  
Notes
2017-04-28 15:08:52C20

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2018-05-15 Cont ID  
Sent By skennedy Date 2018-05-15 Time 16:03 Rev Time 0.00
Received By skennedy Date 2018-05-15 Time 16:03 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2017-05-15 Cont ID  
Sent By shill Date 2017-05-15 Time 08:03 Rev Time 0.00
Received By jwitmer Date 2017-05-15 Time 09:48 Sent To  
Notes
2017-05-15 09:52:07PLEASE NOTE THE DEMO-PERMIT 17010693 WAS ISSUED FOR THE
 DEMOLITION OF 2 STRUCTURES, ON 3/21/2017 A FINAL WAS
 CALLED IN AND PASSED. PLEASE CLOSE OUT THIS PERMIT BY
 REQUESTING A CERTIFICATE OF COMPLETION. TAKE THE DEMO-
 CERTIFICATE OF COMPLETION TO PALM BEACH COUNTY IMPACT
 FEE OFFICE TO RECEIVE A CREDIT DUE BEFORE THE PAYMENT
 OF IMPACT FEES.
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST.
 WEST PALM BEACH. FL 33402
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
2017-05-15 08:04:20IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED
 561-233-5025 FOR MORE INFORMATION
 PLAN TO BE REVISED TO CLARIFY SCOPE PRIOR TO IMPACT FEE
 ASSESSMENT (SEE BUILDING REVIEW)
  
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2018-04-17 Cont ID  
Sent By ccole Date 2018-04-17 Time 09:27 Rev Time 0.00
Received By ccole Date 2018-04-17 Time 09:27 Sent To  
Notes
2018-04-17 09:28:06MECHANICAL PROVISOS:
  
 1) THE AC LAYOUT PLANS WILL REQUIRE REVISIONS TO MATCH
 THE AIRFLOWS SHOWN IN THE AC CALCULATIONS.
 2) NO COMBUSTIBLE MATERIALS PERMITTED IN AC CLOSETS
 USED AS OPEN RETURNS. CLOSED RETURNS- ALL DUCTS, AIR
 HANDLERS, FILTER BOXES, BUILDING CAVITIES, AND ENCLOSED
 SUPPORT PLATFORMS SHALL BE SEALED WITH APPROVED CLOSURE
 SYSTEMS- SECTION C403.2.7.3 FBC-14 ENERGY CONSERVATION.
 3) MANUFACTURER'S SPECIFICATIONS FOR THE AC SYSTEMS,
 DRYERS, WATER HEATERS, RANGES, AND RANGE HOODS SHALL BE
 ONSITE AT TIME OF INSPECTION
  
 CCOLE- 4/17/18
  
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2017-09-19 Cont ID  
Sent By ccole Date 2017-09-19 Time 15:58 Rev Time 0.00
Received By ccole Date 2017-09-19 Time 14:23 Sent To  
Notes
2017-09-19 16:27:341ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17041276
 9/19/17
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) AC AND ENERGY CALCULATIONS HAVE BEEN SUBMITTED AS
 REQUESTED, HOWEVER OF THE FOUR END UNITS ON THE 1ST AND
 2ND FLOOR, CALCULATIONS FOR ONLY TWO OF THE UNITS HAVE
 BEEN SUBMITTED.
  
 2) THE SUMMER AND WINTER OUTSIDE DRYBULB TEMPERATURES
 INDICATED ON THE AC CALCULATIONS AT 94 AND 35 DEGREES F
 ARE NOT IN COMPLIANCE WITH THE ACCA/ASHRAE STANDARD
 WHICH SPECIFIES 91 AND 45 DEGREES.
  
 3) THE FRONT DOOR DIRECTIONAL ORIENTATIONS SHOWN ON THE
 PLANS DO NOT MATCH THE AC CALCULATIONS WHICH ARE
 INDICATING SW FOR ALL OF THE UNITS.
  
 4) SHEET A-14: 2ND REQUEST FOR COMBUSTION AIR
 CALCULATIONS AND VENTING PLANS FOR THE GAS DRYERS.
  
 5) A-14: 2ND REQUEST FOR COMPLETE AC EQUIPMENT
 SCHEDULES THAT INDICATE TOTAL SUPPLY CFMS, EFFICIENCY
 RATINGS, AND ELECTRICAL HEATING DATA. PLEASE NOTE THAT
 THE SCHEDULE IS INDICATING OFFICE/LAUNDRY HOWEVER THERE
 IS NO OFFICE ON THE PLANS- PLEASE CORRECT.
  
 6) EXHAUST VENTILATION IS REQUIRED FOR THE KITCHENS AND
 THE COOKING APPLIANCES., HOWEVER NO INFORMATION HAS
 BEEN PROVIDED ON THE PLANS. REFER TO SECTION 505 AND
 SHOW COMPLIANCE ON THE PLANS.
  
 7) THE AC CLOSET DOORS SHALL BE NON-COMBUSTIBLE IN
 COMPLIANCE WITH SECTION C403.2.7.2 FBC-14 ENERGY
 CONSERVATION AND SECTION 602 FBC-14 MECHANICAL.
  
 8) 2ND REQUEST WIND LOAD ENGINEERING FOR INSTALLATION
 OF THE EXTERIOR CONDENSERS.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT
 CORRECTED PLAN SHEETS INTO THE SETS, REMOVE THE
 PREVIOUSLY REVIEWED SHEETS AND MARK VOID ON THEM, AND
 KEEP THEM WITH THE SUBMITTALS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2017-05-02 Cont ID  
Sent By ccole Date 2017-05-02 Time 14:44 Rev Time 0.00
Received By ccole Date 2017-05-02 Time 14:44 Sent To  
Notes
2017-05-02 15:06:111ST REVIEW FBC-2014 MECHANICAL
 PERMIT #17041276
 5/2/17
  
 1) THE MECHANICAL PLANS ARE INCOMPLETE. PLEASE PROVIDE
 THE FOLLOWING:
  
 A) AC COOLING HEATING CALCULATIONS- SECTION C403.2.1
 FBC-14 ENERGY CONSERVATION.
 B) ENERGY CALCULATIONS- SECTIONS C101.3, C101.5, AND
 C401.2 FBC-14 ENERGY CONSERVATION.
 C) MINIMUM VENTIALTION CALCULATIONS FOR ALL OCCUPIED
 ROOMS AND SPACES. PROVIDE A TABLE THAT INCLUDES THE
 REQUIRED AND PROVIDED CFMS OF OUTSIDE AIR- TABLE 403.3
 FBC-14 MECHANICAL.
 D) EXHAUST VENTILATION CALCULATIONS FOR THE RESTROOMS-
 TABLE 403.3
 E) COMBUSTION AIR CALCULATIONS AND VENTING PLANS FOR
 THE GAS DRYERS - SECTION 304 AND 501.1 FBC-14 ENERGY
 CONSERVATION.
 F) COMPLETE DUCT LAYOUT AND AIR DISTRIBUTION PLANS
 SHOWING DUCT SIZES, DIFFUSER AND RETURN GRILL SIZES,
 TRANSFER GRILLS OR DUCTS WHERE REQUIRED, AND CFM'S AT
 EACH DEVICE.
 G) COMPLETE AC EQUIPMENT SCHEDULES THAT INDICATE THE
 MAKES AND MODELS OF THE COMPONENTS, COOLING AND HEATING
 CAPACITIES, SUPPLY CFMS, EFFICIENCY RATINGS, AND
 ELECTRICAL DATA.
 H) WIND LOAD ENGINEERING FOR INSTALLATION OF THE
 EXTERIOR CONDENSERS.
  
 2) SHEET A-14: THE PLAN APPEARS TO SHOW AN AIR HANDLER
 IN THE ATTIC ABOVE THE GREAT ROOM WHICH IS PROHIBITED
 PER SECTION C403.2.7.6 FBC-14 ENERGY COMPLIANCE.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 3 Status P Date 2018-04-20 Cont ID  
Sent By gjohnson Date 2018-04-20 Time 10:25 Rev Time 0.00
Received By gjohnson Date 2018-04-20 Time 10:25 Sent To  
Notes
2018-04-20 10:29:00 
 PLUMBING/GAS PROVISO:
 1. INDICATE ON THE PLAN WHICH DESIGN SPEC A OR B IS
 BEING USED FOR THE BATHROOMS IN THE GROUND FLOOR UNITS.
 PER FHA DESIGN MANUAL REQUIREMENT #7
 2. PROVIDE DETAILS SHOWING THE MOUNTING HEIGHTS OF THE
 BACKING FOR THE GRAB BARS IN THE BATHROOMS. PER FHA
 DESIGN MANUAL REQUIREMENT #6
 3. PROVIDE ON JOBSITE FOR INSPECTIONS THE MANUFACTURE
 SPECIFICATIONS AND INSTALLATION GUIDES FOR THE TANKLESS
 WATER HEATERS AND PRESSURE REGULATORS. PER WPB AMEND TO
 FBC 107.2.1
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2017-09-26 Cont ID  
Sent By gjohnson Date 2017-09-26 Time 17:20 Rev Time 0.00
Received By gjohnson Date 2017-09-26 Time 17:20 Sent To  
Notes
2017-09-26 18:00:432ND REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS: 2ND REQUEST NOT COMPLIED A NARRATIVE
 LISTING THE ORIGINAL REVIEW COMMENT NUMBER WITH A
 DESCRIPTION OF THE CHANGES MADE AND IDENTIFYING THE
 SHEET OR SPECIFICATION PAGE WHERE THE CHANGE CAN BE
 FOUND WILL HELP EXPEDITE THE REVIEW.
  
  
 2. THE PLAN DOES NOT INDICATE WHAT TYPE OF OCCUPANCY
 THIS PROJECT IS IF IT IS GOING TO BE MULTI FAMILY
 RESIDENTIAL AN R3 OR R4 THE GROUND FLOOR UNIT WILL HAVE
 TO COMPLY WITH THE FHA DESIGN MANUAL. PLEASE PROVIDE
 TYPE OF OCCUPANCY. PER WPB AMEND TO FBC 107.2.1
  
 3. THE BATHROOMS IN THE GREAT ROOM IS A COMMON AREA AND
 SHALL COMPLY WITH THE FBC ACC 603,604, 606, 609
  
 4. THE TRANSFER SHOWER IN BATHROOM #1 IN UNIT 1A AND 1B
 SHAL BE 36" X 36". PER FBC ACC 608.2.1
  
 5. THE GRAB BARS FOR THE ROLL IN SHOWER IN BATHROOM #1
 IN UNIT 1C SHALL COMPLY WITH. PER FBC ACC 608.3.2
  
 6. SHOW IN ALL ACCESSIBLE BATHROOMS THE CLEAR FLOOR
 SPACE FOR THE TOILET , LAVATORY AND SHOWER. PER FBC ACC
 608.2.1 ,608.2.2.1 ,606.2,604.3.1
  
 7. SHOW HEIGHT DIMENSIONS FOR SHOWER SEATS AND
 CONTROLS. PER FBC ACC 608.5.1 , 610.3 , 608.5.2 ,
 610.3.2, 610.3.1
  
 8. PLEASE LABEL THE SOILSTACKS ON PLAN VIEW TO COINCIDE
 WITH TAGS ON RISER DIAGRAM. PER WPB AMEND TO FBC
 107.2.1,
  
 9. PLEASE PROVIDE WATER RISER DIAGRAM. WPB AMEND TO FBC
 107.3.5.1.3(13)
  
 10. PLEASE PROVIDE COMPLETE SANITARY RISER DIAGRAM. WPB
 AMEND TO FBC 107.3.5.1.3(13)
  
 11. BRANCH DRAIN FOR WASHING MACHINE SHALL BE 3". PER
 FBC PL 406.2
  
 NEW COMMENTS:
  
 1. GRAB BARS SHALL BE ABOVE THE FINISH FLOOR MEASURED
 TO THE TOP OF THE GRIPPING SURFACE. PER FBC ACC 609.4
  
 2. SHOWER SPRAY UNIT SHALL BE INSTALLED ON THE SIDE
 WALL OPPOSITE THE SEAT 38 INCHES MINIMUM AND 48 INCHES
 MAXIMUM ABOVE THE SHOWER FLOOR AND SHALL BE LOCATED ON
 THE CONTROL WALL 15 INCHES (380 MM) MAXIMUM FROM THE
 CENTERLINE OF THE SEAT TOWARD THE SHOWER OPENING. PER
 FBC ACC 608.5.1
  
 3. THE SOIL STACKS FROM SECOND FLOOR SHALL CONNECT TO
 BUILDING DRAIN DOWN STREAM OF FIRST FLOOR BATHROOM
 GROUP. PER FBC PL 912.1
  
 4. A CLEANOUT SHALL BE PROVIDED AT THE BASE OF EACH
 WASTE OR SOIL STACK. PER FBC PL 708.3.4
  
 6. A LENT TRAP IS REQUIRED FOR THE WASHING MACHINES.
 PER FBC PL 1003.6
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-05-18 Cont ID  
Sent By gjohnson Date 2017-05-18 Time 09:53 Rev Time 0.00
Received By gjohnson Date 2017-05-17 Time 17:30 Sent To  
Notes
2017-05-18 10:05:081ST REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1. ON THE APPLICATION DESCRIPTION OF WORK IT STATES A
 NEW BUILDING BUT ON THE PLANS IN THE TITLE BLOCK IT
 STATES IT IS AN INTERIOR REMODEL PLEASE CLARIFY. PER
 WPB AMEND TO FBC 107.2.1
  
 2. THE PLAN DOES NOT INDICATE WHAT TYPE OF OCCUPANCY
 THIS PROJECT IS IF IT IS GOING TO BE MULTI FAMILY
 RESIDENTIAL AN R3 OR R4 THE GROUND FLOOR UNIT WILL HAVE
 TO COMPLY WITH THE FHA DESIGN MANUAL. PLEASE PROVIDE
 TYPE OF OCCUPANCY. PER WPB AMEND TO FBC 107.2.1
  
 3. THE BATHROOMS IN THE GREAT ROOM IS A COMMON AREA AND
 SHALL COMPLY WITH THE FBC ACC 603,604, 606, 609
  
 4. THE TRANSFER SHOWER IN BATHROOM #1 IN UNIT 1A AND 1B
 SHAL BE 36" X 36". PER FBC ACC 608.2.1
  
 5. THE GRAB BARS FOR THE ROLL IN SHOWER IN BATHROOM #1
 IN UNIT 1C SHALL COMPLY WITH. PER FBC ACC 608.3.2
  
 6. SHOW IN ALL ACCESSIBLE BATHROOMS THE CLEAR FLOOR
 SPACE FOR THE TOILET , LAVATORY AND SHOWER. PER FBC ACC
 608.2.1 ,608.2.2.1 ,606.2,604.3.1
  
 7. SHOW HEIGHT DIMENSIONS FOR SHOWER SEATS AND
 CONTROLS. PER FBC ACC 608.5.1 , 610.3 , 608.5.2 ,
 610.3.2, 610.3.1
  
 8. PLEASE LABEL THE SOILSTACKS ON PLAN VIEW TO COINCIDE
 WITH TAGS ON RISER DIAGRAM. PER WPB AMEND TO FBC
 107.2.1,
  
 9. PLEASE PROVIDE WATER RISER DIAGRAM. WPB AMEND TO FBC
 107.3.5.1.3(13)
  
 10. PLEASE PROVIDE COMPLETE SANITARY RISER DIAGRAM. WPB
 AMEND TO FBC 107.3.5.1.3(13)
  
 11. BRANCH DRAIN FOR WASHING MACHINE SHALL BE 3". PER
 FBC PL 406.2
  
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  

Review Stop Z ZONING
Rev No 4 Status F Date   Cont ID  
Sent By   Date 2018-06-20 Time   Rev Time 0.00
Received By pgreilic Date 2018-06-20 Time 16:23 Sent To  
Notes
2018-06-20 16:23:22PROVIDE APPROVED SITE PLAN WITH PLAN SET
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 3 Status P Date   Cont ID  
Sent By   Date 2018-05-29 Time   Rev Time 0.00
Received By pgreilic Date 2018-05-29 Time 16:26 Sent To  
Notes
2018-04-19 16:26:24APPROVED AS MULTIFAMILY APARTMENT
 BUILDINGS
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 2 Status F Date   Cont ID  
Sent By   Date 2017-10-05 Time   Rev Time 0.00
Received By pgreilic Date 2017-09-27 Time 15:53 Sent To  
Notes
2017-10-06 14:07:331.) APPLICATION REQUIRES LEVEL 1 SITE PLAN REVIEW (PER
 SEC. 94-35(D)
  
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]

Review Stop Z ZONING
Rev No 1 Status F Date   Cont ID  
Sent By   Date 2017-05-15 Time   Rev Time 0.00
Received By pgreilic Date 2017-05-15 Time 15:36 Sent To  
Notes
2017-05-17 14:32:11 
 PAUL GREILICH, SENIOR PLANNER
 561-822-1443
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved