Plan Review Details - Permit 17040644
Plan Review Stops For Permit 17040644
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-04-14 Cont ID  
Sent By shill Date 2017-04-14 Time 12:30 Rev Time 0.00
Received By shill Date 2017-04-14 Time 10:44 Sent To  
Notes
2017-04-14 12:30:40****PROVISOS****
 ****ISSUED AT APPLICANT'S RISK****
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. 105.13 PHASED PERMIT APPROVAL. AFTER SUBMITTAL OF
 THE APPROPRIATE CONSTRUCTION DOCUMENTS, THE BUILDING
 OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT FOR THE
 CONSTRUCTION OF FOUNDATIONS OR ANY OTHER PART OF A
 BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION DOCUMENTS
 FOR THE WHOLE BUILDING OR STRUCTURE HAVE BEEN
 SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE FOUNDATION
 OR OTHER PARTS OF A BUILDING OR STRUCTURE SHALL PROCEED
 AT THE HOLDER?S OWN RISK WITH THE BUILDING OPERATION
 AND WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE
 STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE REQUIRED
 TO MEET THE REQUIREMENTS OF THE TECHNICAL CODES. THIS
 PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE, ALL
 OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION MUST
 BE SECURED PRIOR TO THIS PROVISION BEING APPLIED.
  
 2. SCOPE OF THIS FOUNDATION PERMIT IS LIMITED TO STONE
 COLUMNS AND FOOTINGS, EXCLUDING THE AREA OF THE
 PROPOSED NEW ELEVATOR (SEE LS1.1 ATTACHED FOR
 REFERENCE). ONLY THE BUILDING FOOTPRINT APPROVED BY
 ZONING IS INCLUDED IN THIS PERMIT.
  
 3. SHEET LS1.1 IS INCLUDED FOR ELEVATOR LOCATION ONLY;
 THIS PAGE WILL BE REVIEWED UNDER THE BUILDING PERMIT
 15020937.
  
 4. THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD
 AREA. PRIOR TO CONCRETE POUR, AN ELEVATION CERTIFICATE
 OR FORM BOARD SURVEY SHOWING ELEVATION IS REQUIRED.
 PRIOR TO C.O. A FINISHED CONSTRUCTION ELEVATION
 CERTIFICATE IS REQUIRED.
  
 5. AFTER ISSUANCE, APPLICANT IS TO MAKE A COLOR COPY OF
 THE PERMIT DOCUMENTS FOR THE SPECIAL INSPECTOR. FUTURE
 SUBMITTALS TO INCLUDE THREE SETS.
  
 6. AFTER ISSUANCE, APPLICANT IS TO OBTAIN THE SITE PLAN
 FROM CITY RECORDS (ONLY ONE AVAILABLE AT TIME OF
 ISSUANCE).
  
 7. SOIL IMPROVEMENT WORK TO BE MONITORED BY ARDAMAN &
 ASSOCIATES.
  
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-04-17 Cont ID  
Sent By vperez Date 2017-04-17 Time 08:59 Rev Time 0.00
Received By vperez Date 2017-04-17 Time 08:59 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2017-04-14 Cont ID  
Sent By shill Date 2017-04-14 Time 10:25 Rev Time 0.00
Received By shill Date 2017-04-14 Time 10:25 Sent To  
Notes
2017-04-14 10:26:19SEE REVIEW UNDER 15020937
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-04-21 Cont ID  
Sent By shill Date 2017-04-21 Time 09:47 Rev Time 0.00
Received By shill Date 2017-04-19 Time 11:47 Sent To  
Notes
2017-04-20 11:47:42RESUB ROUTED TO SHILL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-04-17 Cont ID  
Sent By lmarchan Date 2017-04-17 Time 13:31 Rev Time 0.00
Received By lmarchan Date 2017-04-14 Time 10:25 Sent To  
Notes
2017-04-14 12:51:394/14 TO VP DESK
  
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date 2017-04-14 Cont ID  
Sent By shill Date 2017-04-14 Time 13:38 Rev Time 0.00
Received By shill Date 2017-04-14 Time 13:38 Sent To  
Notes
2017-04-14 13:39:19IMPACT FEES REQUIRED ON BUILDING PERMIT (PER MICHELE
 BONANNI)
 HOLD PUT ON BUILDING PERMIT
  
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status P Date 2017-04-14 Cont ID  
Sent By shill Date 2017-04-14 Time 12:49 Rev Time 0.00
Received By shill Date 2017-04-14 Time 10:44 Sent To  
Notes
2017-04-14 12:49:56PROVISO
 SEE BUILDING REVIEW - ELEVATION CERTIFICATE REQUIRED
 PRIOR TO POUR (OR FORM BOARD SURVEY WITH ELEVATIONS),
 FINISHED CONSTRUCTION ELEVATION CERTIFICATE REQUIRED
 PRIOR TO CO
  

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status P Date 2017-04-21 Cont ID  
Sent By shill Date 2017-04-21 Time 09:45 Rev Time 0.00
Received By shill Date 2017-04-20 Time 15:20 Sent To  
Notes
2017-04-21 09:47:42PROVISO
  
 CONTRACTOR'S RESUME IS REQUIRED, SEND VIA EMAIL
 PER CONTRACTOR, ARDAMAN & ASSOCIATES WILL PERFORM SOIL
 IMPROVEMENT & STONE COLUMN MONITORING
  
 A PRE-CONSTRUCTION MEETING WITH THE RESIDENT INSPECTOR,
 CONTRACTOR, AND KEN CONRAD IS REQUIRED. CALL KEN
 CONRAD, 561-805-6666 TO SCHEDULE. THIS IS REQUIRED
 PRIOR TO FOOTER INSPECTION.
  
  

Review Stop Z ZONING
Rev No 1 Status N Date 2017-04-14 Cont ID  
Sent By shill Date 2017-04-14 Time 10:26 Rev Time 0.00
Received By shill Date 2017-04-14 Time 10:26 Sent To  
Notes
2017-04-14 10:27:24SEE 15020937 FOR ZONING REVIEW
 SHEET SP3, REVIEWED AND STAMPED BY ERIC SCHNEIDER ON
 4/4/17, IS INCLUDED IN THIS SUBMITTAL
  
  