| 2017-04-14 12:30:40 | ****PROVISOS**** |
| | ****ISSUED AT APPLICANT'S RISK**** |
| | SAMANTHA HILL |
| | BUILDING PLANS EXAMINER |
| | [email protected] |
| | 561-805-6724 |
| | |
| | 1. 105.13 PHASED PERMIT APPROVAL. AFTER SUBMITTAL OF |
| | THE APPROPRIATE CONSTRUCTION DOCUMENTS, THE BUILDING |
| | OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT FOR THE |
| | CONSTRUCTION OF FOUNDATIONS OR ANY OTHER PART OF A |
| | BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION DOCUMENTS |
| | FOR THE WHOLE BUILDING OR STRUCTURE HAVE BEEN |
| | SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE FOUNDATION |
| | OR OTHER PARTS OF A BUILDING OR STRUCTURE SHALL PROCEED |
| | AT THE HOLDER?S OWN RISK WITH THE BUILDING OPERATION |
| | AND WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE |
| | STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE REQUIRED |
| | TO MEET THE REQUIREMENTS OF THE TECHNICAL CODES. THIS |
| | PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE, ALL |
| | OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION MUST |
| | BE SECURED PRIOR TO THIS PROVISION BEING APPLIED. |
| | |
| | 2. SCOPE OF THIS FOUNDATION PERMIT IS LIMITED TO STONE |
| | COLUMNS AND FOOTINGS, EXCLUDING THE AREA OF THE |
| | PROPOSED NEW ELEVATOR (SEE LS1.1 ATTACHED FOR |
| | REFERENCE). ONLY THE BUILDING FOOTPRINT APPROVED BY |
| | ZONING IS INCLUDED IN THIS PERMIT. |
| | |
| | 3. SHEET LS1.1 IS INCLUDED FOR ELEVATOR LOCATION ONLY; |
| | THIS PAGE WILL BE REVIEWED UNDER THE BUILDING PERMIT |
| | 15020937. |
| | |
| | 4. THIS PROPERTY IS LOCATED IN A SPECIAL FLOOD HAZARD |
| | AREA. PRIOR TO CONCRETE POUR, AN ELEVATION CERTIFICATE |
| | OR FORM BOARD SURVEY SHOWING ELEVATION IS REQUIRED. |
| | PRIOR TO C.O. A FINISHED CONSTRUCTION ELEVATION |
| | CERTIFICATE IS REQUIRED. |
| | |
| | 5. AFTER ISSUANCE, APPLICANT IS TO MAKE A COLOR COPY OF |
| | THE PERMIT DOCUMENTS FOR THE SPECIAL INSPECTOR. FUTURE |
| | SUBMITTALS TO INCLUDE THREE SETS. |
| | |
| | 6. AFTER ISSUANCE, APPLICANT IS TO OBTAIN THE SITE PLAN |
| | FROM CITY RECORDS (ONLY ONE AVAILABLE AT TIME OF |
| | ISSUANCE). |
| | |
| | 7. SOIL IMPROVEMENT WORK TO BE MONITORED BY ARDAMAN & |
| | ASSOCIATES. |
| | |
| | |
| | |
| | |