Plan Review Details - Permit 17040391
Plan Review Stops For Permit 17040391
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2017-04-25 Cont ID  
Sent By hhall Date 2017-04-25 Time 10:42 Rev Time 0.00
Received By hhall Date 2017-04-25 Time 10:42 Sent To I
Notes
2017-04-25 10:43:34PASSED - NO UTILITY CONFLICTS
 ADDRESS PLUMBING ISSUES

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-05-22 Cont ID  
Sent By tklarge Date 2017-05-22 Time 11:31 Rev Time 0.00
Received By tklarge Date 2017-05-17 Time 10:39 Sent To  
Notes
2017-05-18 10:39:22RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-04-25 Cont ID  
Sent By cpuell Date 2017-04-25 Time 13:15 Rev Time 0.00
Received By cpuell Date 2017-04-10 Time 12:38 Sent To  
Notes
2017-04-11 12:38:14ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2017-05-22 Cont ID  
Sent By tklarge Date 2017-05-22 Time 11:30 Rev Time 0.00
Received By tklarge Date 2017-05-22 Time 11:17 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-04-13 Cont ID  
Sent By tklarge Date 2017-04-13 Time 06:38 Rev Time 0.00
Received By tklarge Date 2017-04-13 Time 05:34 Sent To  
Notes
2017-04-13 06:38:171) A SPECIFICATION FOR LARGE DIAMETER CONCRETE PIPE HAS
 BEEN SUBMITTED WITH THIS PERMIT APPLICATION. WHAT IS
 THIS FOR? CLARIFY.
 2) THE TANK SHALL COMPLY WITH F.A.C. RULE 64E-6.013 (7)
 (A) FOR THE INLET INVERT MEASUREMENT ABOVE THE LIQUID
 LEVEL LINE (2 1/2 INCHES) AND THE OUTLET PIPE SHALL
 HAVE A TEE WITH A MINIMUM DIAMETER OF 4 INCHES THAT
 EXTENDS TO WITHIN 8 INCHES OF THE BOTTOM OF THE TANK.
 3) SUBMIT A COPY OF THE STATE OF FLORIDA DEPT. OF
 HEALTH APPROVAL THAT CLEARLY SHOWS THAT THIS TANK CAN
 BE USED AS A GREASE INTERCEPTOR.
 4) IF A BAFFLE IS TO BE IN THE TANK, A FLOW THROUGH
 HOLE SHALL BE A MINIMUM OF 8 INCHES IN DIAMETER AND
 LOCATED 12 INCHES FROM THE INSIDE BOTTOM OF THE TANK TO
 THE BOTTOM OF THE FLOW THROUGH HOLE PER THE CITY OF WPB
 STANDARD DETAIL DRAWING GS-7 DATED 2015. A COPY OF THIS
 DRAWING HAS BEEN PLACED IN THE PERMIT APPLICATION FILE
 FOR THE CONTRACTOR.
 5) A SAMPLING PORT SHALL BE INSTALLED IN THE EFFLUENT
 LINE. NOTE - A TWO WAY CLEANOUT EQUAL TO THE DIAMETER
 OF THE EFFLUENT PIPE WILL SATISFY THIS REQUIREMENT.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  
  