Plan Review Details - Permit 17021166
Plan Review Stops For Permit 17021166
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2017-11-16 Cont ID  
Sent By mgonzale Date 2018-04-23 Time 17:49 Rev Time 0.00
Received By shill Date 2017-11-16 Time 18:02 Sent To I
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-03-27 Cont ID  
Sent By shill Date 2017-03-27 Time 14:15 Rev Time 0.00
Received By shill Date 2017-03-27 Time 14:11 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2018-04-23 Cont ID  
Sent By squinone Date 2017-11-23 Time   Rev Time 0.00
Received By mgonzale Date 2017-11-14 Time   Sent To B
Notes
2018-04-23 17:48:41PROVISOS:
  
 1. UTILITY WORK WAS PERFORMED BY CITY O&M.
  
 2. EXTENTS OF PAVEMENT OVERLAY WILL BE DETERMINED BY
 CITY UTILITY CONSTRUCTION COORDINATOR.
  
 3. PROJECT MUST FOLLOW ALL LATEST CITY OF WPB
 STANDARDS.
  
 4. SITE WILL BE CERTIFIED BY ENGINEER OF RECORD.
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
2017-11-14 15:59:211) PAVEMENT RESTORATION FOR OPEN CUT/TRENCH FOR UTILITY
 CONNECTION WORK WILL NEED TO BE IN ACCORDANCE WITH 2016
 CITY'S STANDARD DETAIL GC-9. THE ROAD SHALL BE
 MILLED/RESURFACED FOR FULL ALLEYWAY WIDTH ENCROACHED BY
 THE TRENCH AREA, INCLUDING A TRANSITION AREA OF 50 FEET
 ON EACH SIDE OF THE TRENCH. PLEASE SHOW ON THE FINAL
 PLANS THE EXTENT OF THE MILLING AND RESURFACING.
  
 2) ALLEWAY PAVEMENT (OFF-SITE) SHALL COMPLY WITH CITY'S
 STANDARD DETAIL GC-5 COMMERCIAL/INDUSTRIAL PAVEMENT
 DESIGN, INCLUDE PAVEMENT DESIGN IN THE PLANS.
  
 3) CONTACT THE ENGINEERING SERVICES DEPARTMENT FOR THE
 LATEST REVISED DETAILS IN CAD FORMAT. CITY'S STANDARD
 DETAILS (IN PDF FILE FORMAT) CAN BE DOWNLOADED FROM THE
 FOLLOWING SITE:
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 SOFIA QUINONES-BENEJAM, EI
 PROJECT ENGINEER
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33402
 (MAILING ADDRESS: PO BOX 3366)
 P: 561.494.1108
 C: 561.459.6518
 F: 561.494.1116
 EMAIL: [email protected]
  
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2017-03-24 Cont ID  
Sent By hhall Date 2017-03-24 Time 08:42 Rev Time 0.00
Received By hhall Date 2017-03-24 Time 08:42 Sent To I
Notes
2017-03-24 08:42:45PASSED - NO UTILITY CONFLLICTS

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-11-16 Cont ID  
Sent By shill Date 2017-11-16 Time 18:03 Rev Time 0.00
Received By shill Date 2017-11-02 Time 13:21 Sent To  
Notes
2017-11-03 13:21:58RESUB ROUTED TO LLOUIE VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-03-27 Cont ID  
Sent By shill Date 2017-03-27 Time 14:15 Rev Time 0.00
Received By shill Date 2017-02-27 Time 12:42 Sent To  
Notes
2017-03-09 11:54:55SEPARATED FROM MASTER, SENT TO ZONING. SAK
2017-02-28 12:42:43C38
 *TRAVELLING TOGETHER - 17021163, 17021165, 17021166*

Review Stop Z ZONING
Rev No 3 Status P Date 2017-11-14 Cont ID  
Sent By llouie Date 2017-11-14 Time   Rev Time 0.00
Received By llouie Date 2017-11-07 Time 10:21 Sent To ENG
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2017-06-19 Cont ID  
Sent By llouie Date 2017-06-19 Time   Rev Time 0.00
Received By llouie Date 2017-06-19 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2017-03-14 Cont ID  
Sent By njwira Date 2017-03-23 Time 16:48 Rev Time 0.00
Received By llouie Date 2017-03-10 Time 14:08 Sent To ENG
Notes
2017-03-23 09:44:01** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) SITE PLAN AND STRIPING DETAIL MISSING FROM THE
 PERMIT APPLICATION.
  
 2.) THE MODIFIED CURB CUTS ON PERSHING WAY AND THE
 ALLEY REQUIRES A ROW PERMIT FROM THE ENGINEERING
 SERVICES DEPARTMENT. PLEASE PROVIDE.
  
 3.) PLEASE PROVIDE BICYCLE PARKING. ONE (1) BICYCLE
 PARKING IS REQUIRED FOR EVERY TWENTY (20) PARKING
 SPACES. [ZLDR S. 94-485(Q)]
  
  
 NOTE(S):
  
 REVISIONS TO THE PLANS MAY RESULT IN ADDITIONAL
 COMMENTS. PLEASE CONTACT LINDA LOUIE @ (561) 822-1458
 IF THERE ARE QUESTIONS.
  
2017-03-14 16:49:523/14/17- FAILED
  
 GENERAL COMMERCIAL
  
 NEW PARKING LOT NEED CALCULATIONS FOR SPACES AND OPEN
 SPACE
 MUST PROVIDE STRIPING DETAIL
 94-313(2) ACCESS POINTS TOO CLOSE
 LANDSCAPE PERMIT REQUIRED
  
  
 PLEASE CONTACT
 NATHAN WIRA- ZONING TECHNICIAN
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING AND ZONING
 DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS ST.
 WEST PALM BEACH, FL 33402
 OFFICE HOURS: M-F 8AM - 5PM
 (561)822-1442
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved