Plan Review Details - Permit 17021165
Plan Review Stops For Permit 17021165
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2017-06-27 Cont ID  
Sent By shill Date 2017-06-16 Time 10:36 Rev Time 0.00
Received By shill Date 2017-06-16 Time 10:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-03-24 Cont ID  
Sent By shill Date 2017-03-24 Time 15:58 Rev Time 0.00
Received By shill Date 2017-03-24 Time 12:27 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2017-06-27 Cont ID  
Sent By jleahy Date 2017-06-27 Time 10:38 Rev Time 0.00
Received By jleahy Date 2017-06-27 Time 10:38 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2017-04-11 Cont ID  
Sent By vperez Date 2017-04-11 Time 14:21 Rev Time 0.00
Received By vperez Date 2017-04-11 Time 14:21 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2017-03-09 Cont ID  
Sent By vperez Date 2017-03-09 Time 09:05 Rev Time 0.00
Received By vperez Date 2017-03-09 Time 09:05 Sent To  
Notes
2017-03-09 09:06:06PENDING ZONING APPROVAL

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2017-06-27 Cont ID  
Sent By jleahy Date 2017-06-27 Time 10:38 Rev Time 0.00
Received By jleahy Date 2017-06-14 Time 16:24 Sent To  
Notes
2017-06-14 16:25:01C40
 **TRAVELLING WITH 17021163**

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-05-15 Cont ID  
Sent By shill Date 2017-05-03 Time 13:50 Rev Time 0.00
Received By shill Date 2017-04-24 Time 13:12 Sent To  
Notes
2017-04-25 13:12:18C38

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-04-25 Cont ID  
Sent By lmarchan Date 2017-04-25 Time 13:11 Rev Time 0.00
Received By lmarchan Date 2017-04-04 Time 12:47 Sent To  
Notes
2017-04-05 12:47:59C38

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-03-24 Cont ID  
Sent By shill Date 2017-03-24 Time 15:58 Rev Time 0.00
Received By shill Date 2017-02-27 Time 12:43 Sent To  
Notes
2017-02-28 12:43:07C38
 *TRAVELLING TOGETHER - 17021163, 17021165, 17021166*

Review Stop P PLUMBING
Rev No 1 Status N Date 2017-03-18 Cont ID  
Sent By tklarge Date 2017-03-18 Time 02:45 Rev Time 0.00
Received By tklarge Date 2017-03-18 Time 02:43 Sent To  
Notes
2017-03-18 02:47:56THIS PERMIT APPLICATION IS FOR THE SITE LIGHTING. THE
 PLUMBING REVIEW STOP SHOULD NOT HAVE BEEN ADDED WHEN IT
 WAS SUBMITTED. SEE PERMIT APPLICATION # 17 0201163
 PLUMBING PLAN REVIEW. T.LARGE

Review Stop Z ZONING
Rev No 4 Status P Date 2017-06-19 Cont ID  
Sent By llouie Date 2017-06-19 Time   Rev Time 0.00
Received By llouie Date 2017-06-19 Time   Sent To  
Notes
2017-06-19 12:01:32THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF FDOT
 RIGHT-OF-WAY IMPROVEMENTS (I.E. LANDSCAPING,
 IRRIGATION, PAVING AND PLANTERS ) ON SOUTH DIXIE HWY. A
 SEPARATE PERMIT IS REQUIRED FROM FDOT.

Review Stop Z ZONING
Rev No 3 Status F Date 2017-05-03 Cont ID  
Sent By llouie Date 2017-05-03 Time   Rev Time 0.00
Received By llouie Date 2017-05-02 Time   Sent To  
Notes
2017-05-03 11:25:46** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) 3/23/17 AND 4/13/17 REPEAT COMMENT: THE MODIFIED
 CURB CUTS ON PERSHING WAY AND THE ALLEY REQUIRES A ROW
 PERMIT FROM THE ENGINEERING SERVICES DEPARTMENT. PLEASE
 PROVIDE.
  
 2.) 4/13/17 REVISED COMMENT #5: THE LOCATION OF THE
 BICYCLE RACK IS NOW IN CONFLICT WITH THE REQUIREMENT TO
 PROVIDE A TERMINAL LANDSCAPE ISLAND. ALSO, THE BICYCLE
 RACK DETAIL DOES NOT MATCH THE SITE PLAN (I.E. SITE
 PLAN SHOWS TWO RACKS; DETAIL SHOWS THREE RACKS). PLEASE
 ADDRESS.
  
 3.) 4/13/17 REVISED COMMENT #6: BICYCLE PARKING
 CALCULATIONS ARE INCORRECT. TWO (2) BICYCLE PARKING
 SPACES ARE REQUIRED; FOUR (4) BICYCLE PARKING SPACES
 PROVIDED (SITE PLAN INDICATES TWO (2) PROVIDED). PLEASE
 CORRECT.
  
 4.) 4/13/17 REVISED COMMENT #9: SETBACK DIMENSIONS FOR
 THE LIGHT FIXTURES NOT PROVIDED IN THE PHOTOMETRIC
 PLAN. THE LIGHT FIXTURES DO NOT SEEM TO MEET THE
 SETBACK REQUIREMENT OF 5 FT. FROM THE PROPERTY LINE
 WHEN MEASURED WITH A SCALE. PLEASE ADDRESS.
  
  
 NOTES:
  
 * ANY CHANGES TO THE PROJECT SHALL BE REFLECTED IN ALL
 PLANS FOR CONSISTENCY.
  
 * REVISION MAY RESULT IN ADDITIONAL COMMENTS.
  
 * THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF FDOT
 RIGHT-OF-WAY LANDSCAPING AND IRRIGATION ON SOUTH DIXIE
 HWY. A SEPARATE PERMIT IS REQUIRED FROM FDOT.
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 2017-04-13 Cont ID  
Sent By llouie Date 2017-04-13 Time   Rev Time 0.00
Received By llouie Date 2017-04-13 Time   Sent To  
Notes
2017-04-13 10:28:06** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) 3/23/17 REPEAT COMMENT: SURVEY MUST BE SIGNED AND
 SEALED.
  
 2.) 3/23/17 REPEAT COMMENT: THE MODIFIED CURB CUTS ON
 PERSHING WAY AND THE ALLEY REQUIRES A ROW PERMIT FROM
 THE ENGINEERING SERVICES DEPARTMENT. PLEASE PROVIDE.
  
 3.) 3/23/17 REPEAT COMMENT: HOW FAR DOES THE STRUCTURAL
 CANOPY PROJECT INTO THE ROW ALONG SOUTH DIXIE HIGHWAY
 AND PERSHING WAY? ROW PERMIT FROM FDOT IS REQUIRED FOR
 THE STRUCTURAL OVERHANG OVER SOUTH DIXIE HIGHWAY. ALSO,
 PLEASE DIMENSION THE ENCROACHMENT.
  
 4.) 3/23/17 REPEAT COMMENT: PROVIDE ALL SETBACK
 DIMENSIONS FROM THE PROPERTY LINE FOR EACH OF THE
 DUMPSTERS PROPOSED IN THE SITE PLAN.
  
 5.) THE BICYCLE RACKS SHALL BE MOUNTED ON A CONCRETE
 PAD. PLEASE ILLUSTRATE IN THE SITE PLAN AND PROVIDE
 DIMENSIONAL INFORMATION IN THE BICYCLE PARKING DETAIL
 ON SHEET A-8.0. ALSO, THE LOCATION OF THE BICYCLE RACK
 SEEMS TO CONFLICT WITH THE REQUIREMENTS OF PROVIDING
 LANDSCAPE ISLANDS.
  
 6.) PROVIDE BICYCLE PARKING CALCULATIONS IN THE "ZONING
 DATA" TABULAR IN SHEET A-1.0.
  
 7.) THE MINIMUM SETBACK REQUIREMENT FOR LIGHT FIXTURES
 IS 5 FT. FROM THE PROPERTY LINE. PLEASE DEMONSTRATE
 COMPLIANCE BY PROVIDING DIMENSIONS IN THE SITE PLAN.
  
 8.) PLEASE DIMENSION THE LOADING ZONE. THE LOADING ZONE
 SHALL BE A MINIMUM OF 10 FT. WIDE BY 25 FT. LONG. [ZLDR
 S.94-485]
  
 9.) 3/23/17 REPEAT COMMENT: THE PHOTOMETRIC PLAN MUST
 DEMONSTRATE THAT ALL LIGHT FIXTURES WILL NOT CAUSE
 ILLUMINATION IN EXCESS OF 0.5 FOOT CANDLES WHEN
 MEASURED IN A RESIDENTIAL ZONING DISTRICT. PLEASE SHOW
 LIGHT OVERFLOW BEYOND THE NORTH AND EAST PROPERTY LINE
 WHERE THERE ARE RESIDENTIAL UNITS IN THE PHOTOMETRIC
 PLAN. ALL LIGHT FIXTURES MUST BE ARRANGED TO REFLECT
 LIGHT AWAY FROM ALL RESIDENTIAL ZONING DISTRICTS. [ZLDR
 S.94-309 AND S.94-310(D)]
  
 10.) ALL ROOFTOP MECHANICAL EQUIPMENT SHALL NOT BE
 VISIBLE FROM VIEW. THIS SHALL BE NOTATED IN THE PLANS.
  
 NOTES:
  
 * ANY CHANGES TO THE PROJECT SHALL BE REFLECTED IN ALL
 PLANS FOR CONSISTENCY.
  
 * REVISIONS TO THE PLANS MAY RESULT IN ADDITIONAL
 COMMENTS.
  
 * THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF FDOT
 RIGHT-OF-WAY LANDSCAPING AND IRRIGATION FOR SOUTH
 DIXIE. A SEPARATE PERMIT IS REQUIRED FROM FDOT.
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  

Review Stop Z ZONING
Rev No 1 Status F Date 2017-03-23 Cont ID  
Sent By llouie Date 2017-03-23 Time 09:26 Rev Time 0.00
Received By llouie Date 2017-03-23 Time 09:26 Sent To  
Notes
2017-03-23 09:26:35** FAILED **
  
 PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE
 COMMENTS IN WRITING AND/OR ON THE PLANS WHERE
 APPLICABLE:
  
 1.) SURVEY MUST BE SIGNED AND SEALED.
  
 2.) PLEASE PROVIDE A FDOT RIGHT-OF-WAY (ROW) PERMIT FOR
 THE PLANTERS AND LANDSCAPE IMPROVEMENTS ALONG SOUTH
 DIXIE HWY.
  
 3.) THE MODIFIED CURB CUTS ON PERSHING WAY AND THE
 ALLEY REQUIRES A ROW PERMIT FROM THE ENGINEERING
 SERVICES DEPARTMENT. PLEASE PROVIDE.
  
 4.) HOW FAR DOES THE STRUCTURAL CANOPY PROJECT INTO THE
 ROW ALONG SOUTH DIXIE HIGHWAY AND PERSHING WAY? ROW
 PERMITS FROM FDOT AND THE ENGINEERING SERVICES
 DEPARTMENT ARE REQUIRED FOR THE STRUCTURAL ENCROACHMENT
 INTO THE ROWS.
  
 5.) PLEASE PROVIDE BICYCLE PARKING. ONE (1) BICYCLE
 PARKING IS REQUIRED FOR EVERY TWENTY (20) PARKING
 SPACES. [ZLDR S. 94-485(Q)]
  
 6.) SHOW LIGHT FIXTURES IN THE SITE PLAN. INCLUDE
 SETBACK DIMENSIONS FROM THE PROPERTY LINE.
  
 7.) THE PHOTOMETRIC PLAN MUST DEMONSTRATE THAT ALL
 LIGHT FIXTURES WILL NOT CAUSE ILLUMINATION IN EXCESS OF
 0.5 FOOT CANDLES WHEN MEASURED IN A RESIDENTIAL ZONING
 DISTRICT. PLEASE SHOW PHOTOMETRIC RANGE BEYOND THE
 NORTH AND EAST PROPERTY LINE WHERE THERE ARE
 RESIDENTIAL UNITS. ALL LIGHT FIXTURES MUST BE ARRANGED
 TO REFLECT LIGHT AWAY FROM ALL RESIDENTIAL ZONING
 DISTRICTS. [ZLDR S.94-309 AND S. 94-310(D)]
  
 8.) WHERE ARE THE A/C UNITS? SHOW A/C UNITS IN THE
 PLAN(S).
  
 9.) PROVIDE ALL SETBACK DIMENSIONS FROM THE PROPERTY
 LINE FOR EACH DUMPSTER PROPOSED IN THE SITE PLAN.
  
 10.) WHAT IS THE DEPTH OF THE PARKING STALLS WITH WHEEL
 STOPS. PLEASE PROVIDE A DIMENSION IN THE SITE PLAN.
  
 11.) FOR PARKING CALCULATIONS IN THE SITE DATA TABULAR:
 PROVIDE NUMBERS FOR "EXISTING" AND "PROPOSED".
  
 12.) WHERE IS THE LOADING ZONE? PLEASE ILLUSTRATE IN
 THE PLANS.
  
  
 NOTE(S):
  
 REVISIONS TO THE PLANS MAY RESULT IN ADDITIONAL
 COMMENTS. PLEASE CONTACT LINDA LOUIE @ (561) 822-1458
 IF THERE ARE QUESTIONS.
  