| Plan Review Stops For Permit 17021163 |
| Review Stop |
AD |
ADDRESSING |
| Rev No |
1 |
Status |
N |
Date |
2017-03-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-03-24 |
Time |
15:59 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-03-24 |
Time |
15:59 |
Sent To |
|
|
| Notes |
| 2017-03-24 15:59:54 | SEND TO ADDRESSING WHEN TENANT BUILDOUT IS APPLIED FOR |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2017-06-19 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-06-19 |
Time |
13:02 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-06-19 |
Time |
13:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2017-05-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-05-15 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-05-15 |
Time |
12:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2017-04-05 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2017-04-05 |
Time |
15:03 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2017-04-05 |
Time |
15:03 |
Sent To |
|
|
| Notes |
| 2017-04-05 15:04:28 | APPROVED 3 A SHEETS WHICH WERE RE-SUBMITTED DUE TO | | | ZONING REQUIREMENTS. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2017-03-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-03-24 |
Time |
14:56 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-03-24 |
Time |
14:30 |
Sent To |
|
|
| Notes |
| 2017-03-24 14:56:36 | PROVISOS | | | ISSUED AT APPLICANT'S RISK | | | SHELL ONLY - SEPARATE PERMITS | | | REQUIRED FOR TENANT BUILDOUTS | | | SEPARATE PERMIT REQUIRED FOR | | | ROOF (SEE ROOF REVIEW) | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2017-06-19 |
|
|
Cont ID |
|
| Sent By |
jleahy |
Date |
2017-06-19 |
Time |
12:31 |
Rev Time |
0.00 |
| Received By |
jleahy |
Date |
2017-06-19 |
Time |
12:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2017-04-06 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2017-04-06 |
Time |
15:32 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2017-04-06 |
Time |
15:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2017-03-09 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2017-03-09 |
Time |
09:04 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2017-03-09 |
Time |
09:04 |
Sent To |
|
|
| Notes |
| 2017-03-09 09:04:22 | INITIAL ELECTRICAL PLAN REVIEW | | | | | | APPLICABLE CODES IN EFFECT: | | | FLORIDA BUILDING CODE 2014 5TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH | | | EDITION | | | NFPA 70- 2011 | | | COMMENTS: | | | | | | 1. GENERAL NOTES TO CONSTRUCTION DOCUMENTS: PLEASE | | | PROVIDE A BLOCK NOTE INDICATING THE REQUIRED SEPARATE | | | PERMITS AND DATA SPECIFICATION SHEET SUBMITTALS FOR ALL | | | SITE LIGHTING AND ASSOCIATED EQUIPMENT, ALL LOW VOLTAGE | | | SYSTEMS. A NOTE WILL SUFFICE. | | | 2. PROVIDE GENERAL NOTES TO ELECTRICAL RISER DIAGRAM TO | | | INDICATE NEC 110.16. ARC FLASH WARNING SIGNS AND NEC | | | 110.24- AVAILABLE FAULT CURRENT- FIELD MARKINGS; SEE | | | VERBIAGE IN CODE. | | | 3. PLEASE SHOW THE SIZE OF WIRE-WAY. FBC 107.3.5 | | | 4. LABEL MAINS 1OF2 2OF 2 ETC. PER NEC 230.2E | | | 5. PROVIDE A GENERAL NOTE TO INDICATE NEC 300.5 BURIAL | | | DEPTH REQUIREMENTS. | | | 6. SHOW LIFE SAFETY EXIT LIGHTS AND EMERGENCY FIXTURES | | | WITHIN SHELL AS SHOWN ON SHEET LSP1.0. PROVIDE LOADS ON | | | HOUSE PANEL IF THAT IS WHERE THEY ORIGINATE FROM. SHOW | | | ON PANEL SCHEDULE | | | 7. COMMENTS MAY FOLLOW UPON RE-REVIEW. PLEASE FEEL FREE | | | TO CONTACT ME SHOULD YOU HAVE ANY | | | | | | | | | VALENTINO PEREZ | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6717 | | | [email protected] | | | | | | | | | | | | |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
N |
Date |
2017-04-05 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2017-04-05 |
Time |
14:07 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2017-04-05 |
Time |
14:07 |
Sent To |
|
|
| Notes |
| 2017-04-05 14:08:07 | SEE REVIEW UNDER 17021166 |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2017-06-22 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2017-06-22 |
Time |
16:12 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2017-06-22 |
Time |
16:12 |
Sent To |
|
|
| Notes |
| 2017-06-22 16:12:17 | APPROVED FOR A SHELL PERMIT ONLY. SEPARATE PERMITS WILL | | | BE NEEDED FOR TENANT FITOUTS IN ORDER TO OCCUPY THE | | | STRUCTURE. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2017-05-03 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2017-05-03 |
Time |
12:29 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2017-05-03 |
Time |
12:29 |
Sent To |
|
|
| Notes |
| 2017-05-03 12:29:54 | APPROVED FOR A SHELL PERMIT ONLY. SEPARATE PERMITS WILL | | | BE NEEDED FOR TENANT FITOUTS IN ORDER TO OCCUPY THE | | | STRUCTURE. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2017-03-02 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2017-03-02 |
Time |
12:06 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2017-03-02 |
Time |
11:42 |
Sent To |
|
|
| Notes |
| 2017-03-02 12:06:16 | APPROVED FOR A SHELL PERMIT ONLY. SEPARATE PERMITS WILL | | | BE NEEDED FOR TENANT FITOUTS IN ORDER TO OCCUPY THE | | | STRUCTURE. |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2017-11-08 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2017-11-08 |
Time |
16:46 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2017-11-08 |
Time |
16:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2017-06-27 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2017-06-27 |
Time |
09:19 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-06-14 |
Time |
16:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2017-05-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-05-15 |
Time |
13:50 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-04-24 |
Time |
13:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2017-04-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-04-20 |
Time |
05:58 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-04-04 |
Time |
12:48 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2017-03-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-03-24 |
Time |
16:00 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-02-27 |
Time |
11:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
3 |
Status |
P |
Date |
2017-06-28 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-06-28 |
Time |
13:58 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-06-28 |
Time |
13:58 |
Sent To |
|
|
| Notes |
| 2017-06-28 17:24:02 | NO MU NUMBER ASSIGNED | | | $0 DUE | | | |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
F |
Date |
2017-05-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-05-22 |
Time |
08:47 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-05-22 |
Time |
08:47 |
Sent To |
|
|
| Notes |
| 2017-05-22 08:47:42 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY IS REQUIRED | | | THE PLANS ARE TO BE STAMPED AND THE RECEIPT SHOWING | | | THAT FEES DUE HAVE BEEN PAID (IF APPLICABLE) ARE TO BE | | | PROVIDED | | | 561-233-5025 FOR MORE INFORMATION | | | | | | PERMITS 17031082, 17021163 | | | | | | |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2017-05-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-03-24 |
Time |
15:07 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-03-24 |
Time |
14:30 |
Sent To |
|
|
| Notes |
| 2017-05-22 08:48:05 | SEE REVIEW #2 - PER EMAIL FROM W.SWOPE | | | | | 2017-03-24 15:07:27 | REDUCTION IN BUILDING SIZE | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2017-06-19 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-06-19 |
Time |
13:05 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-06-19 |
Time |
13:05 |
Sent To |
|
|
| Notes |
| 2017-06-21 11:03:43 | 6/19/17 | | | PLANS SENT TO ENGINEERING | | | CCOLE |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2017-03-03 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-03-03 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-03-03 |
Time |
14:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2017-06-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-06-20 |
Time |
03:56 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-06-20 |
Time |
03:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2017-04-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-04-19 |
Time |
05:58 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-04-19 |
Time |
05:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2017-03-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-03-18 |
Time |
04:49 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-03-18 |
Time |
02:49 |
Sent To |
|
|
| Notes |
| 2017-03-18 04:49:32 | 1) SHT. C-2 - ALL THE DRAIN LINES ON THE DRAWING ARE | | | LABELED AS "SANITARY" THOUGH THERE ARE GREASE WASTE | | | LINES ALSO.IDENTIFY THE GREASE WASTE LINES AS SUCH AND | | | CORRELATE THE GREASE WASTE LINES WITH THOSE SHOWN ON | | | DRAWING P-1.0.WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) SHT. C-2 - NOTES THE GREASE WASTE LINES AS FUTURE. | | | THERE ARE NO GREASE INTERCEPTORS INSTALLED ON ANY OF | | | THESE LINES. CLARIFY. COMPLY WITH 2014 FBC SEC. 1003.2. | | | 3) A CLEANOUT SHALL BE INSTALLED NOT MORE THAN 100 FEET | | | APART ON BUILDING SEWERS MEASURED FROM THE UPSTREAM | | | ENTRANCE OF THE CLEANOUT PER 2014 FBC-PLUMBING | | | SEC.708.3.2. | | | 4) A CLEANOUT BROUGHT TO GRADE SHALL ALSO BE LOCATED AT | | | THE PROPERTY LINE CONNECTION TO THE CITY LATERAL (WPB | | | UTILITIES REQUIREMENT). | | | 5) SUBMIT A STORMWATER RISER FOR REVIEW. WPB AMEND. TO | | | FBC SEC. 107.3.5.1.3. | | | 6) SHT. A-4.0 - INDICATE THE SLOPE OF THE HORIZONAL | | | STORM DRAIN PIPING PER 2014 FBC- PLUMBING TABLE 1106.3. | | | 7) SHOW THE GREASE WASTE LINES ON SHT. P-2.0. | | | 8) SEPARATE PERMITS WILL BE REQUIRED FOR THE BACKFLOW | | | DEVICES. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2017-03-24 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-03-24 |
Time |
15:07 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-03-24 |
Time |
15:07 |
Sent To |
|
|
| Notes |
| 2017-03-24 15:08:57 | SEPARATE PERMIT REQUIRED FOR ROOFING | | | | | | THE ASSEMBLY IN THE NOA SUBMITTED DOES NOT MEET THE | | | DESIGN PRESSURE REQUIREMENT FOR ZONES 2 & 3. IT REFERS | | | TO GENERAL LIMITATION #9. | | | | | | ROOF INSULATION REQUIRED; SEE ENERGY CALC FOR TENANT | | | BUILDOUT AND SHEET A4.0 | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2017-06-19 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2017-06-19 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2017-06-19 |
Time |
|
Sent To |
|
|
| Notes |
| 2017-06-19 11:35:34 | THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF FDOT | | | RIGHT-OF-WAY IMPROVEMENTS (I.E. LANDSCAPING, | | | IRRIGATION, PAVING AND PLANTERS) ON SOUTH DIXIE HWY. A | | | SEPARATE PERMIT IS REQUIRED FROM FDOT. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2017-05-03 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2017-05-03 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2017-05-02 |
Time |
|
Sent To |
|
|
| Notes |
| 2017-05-03 11:18:06 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) 3/23/17 AND 4/13/17 REPEAT COMMENT: THE MODIFIED | | | CURB CUTS ON PERSHING WAY AND THE ALLEY REQUIRES A ROW | | | PERMIT FROM THE ENGINEERING SERVICES DEPARTMENT. PLEASE | | | PROVIDE. | | | | | | 2.) 4/13/17 REVISED COMMENT #5: THE LOCATION OF THE | | | BICYCLE RACK IS NOW IN CONFLICT WITH THE REQUIREMENT TO | | | PROVIDE A TERMINAL LANDSCAPE ISLAND. ALSO, THE BICYCLE | | | RACK DETAIL DOES NOT MATCH THE SITE PLAN (I.E. SITE | | | PLAN SHOWS TWO RACKS; DETAIL SHOWS THREE RACKS). PLEASE | | | ADDRESS. | | | | | | 3.) 4/13/17 REVISED COMMENT #6: BICYCLE PARKING | | | CALCULATIONS ARE INCORRECT. TWO (2) BICYCLE PARKING | | | SPACES ARE REQUIRED; FOUR (4) BICYCLE PARKING SPACES | | | PROVIDED (SITE PLAN INDICATES TWO (2) PROVIDED). PLEASE | | | CORRECT. | | | | | | 4.) 4/13/17 REVISED COMMENT #9: SETBACK DIMENSIONS FOR | | | THE LIGHT FIXTURES NOT PROVIDED IN THE PHOTOMETRIC | | | PLAN. THE LIGHT FIXTURES DO NOT SEEM TO MEET THE | | | SETBACK REQUIREMENT OF 5 FT. FROM THE PROPERTY LINE | | | WHEN MEASURED WITH A SCALE. PLEASE ADDRESS. | | | | | | | | | NOTES: | | | | | | * ANY CHANGES TO THE PROJECT SHALL BE REFLECTED IN ALL | | | PLANS FOR CONSISTENCY. | | | | | | * REVISION MAY RESULT IN ADDITIONAL COMMENTS. | | | | | | * THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF FDOT | | | RIGHT-OF-WAY LANDSCAPING AND IRRIGATION ON SOUTH DIXIE | | | HWY. A SEPARATE PERMIT IS REQUIRED FROM FDOT. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2017-04-13 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2017-04-13 |
Time |
|
Rev Time |
0.00 |
| Received By |
llouie |
Date |
2017-04-13 |
Time |
|
Sent To |
|
|
| Notes |
| 2017-04-13 10:30:55 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) 3/23/17 REPEAT COMMENT: SURVEY MUST BE SIGNED AND | | | SEALED. | | | | | | 2.) 3/23/17 REPEAT COMMENT: THE MODIFIED CURB CUTS ON | | | PERSHING WAY AND THE ALLEY REQUIRES A ROW PERMIT FROM | | | THE ENGINEERING SERVICES DEPARTMENT. PLEASE PROVIDE. | | | | | | 3.) 3/23/17 REPEAT COMMENT: HOW FAR DOES THE STRUCTURAL | | | CANOPY PROJECT INTO THE ROW ALONG SOUTH DIXIE HIGHWAY | | | AND PERSHING WAY? ROW PERMIT FROM FDOT IS REQUIRED FOR | | | THE STRUCTURAL OVERHANG OVER SOUTH DIXIE HIGHWAY. ALSO, | | | PLEASE DIMENSION THE ENCROACHMENT. | | | | | | 4.) 3/23/17 REPEAT COMMENT: PROVIDE ALL SETBACK | | | DIMENSIONS FROM THE PROPERTY LINE FOR EACH OF THE | | | DUMPSTERS PROPOSED IN THE SITE PLAN. | | | | | | 5.) THE BICYCLE RACKS SHALL BE MOUNTED ON A CONCRETE | | | PAD. PLEASE ILLUSTRATE IN THE SITE PLAN AND PROVIDE | | | DIMENSIONAL INFORMATION IN THE BICYCLE PARKING DETAIL | | | ON SHEET A-8.0. ALSO, THE LOCATION OF THE BICYCLE RACK | | | SEEMS TO CONFLICT WITH THE REQUIREMENTS OF PROVIDING | | | LANDSCAPE ISLANDS. | | | | | | 6.) PROVIDE BICYCLE PARKING CALCULATIONS IN THE "ZONING | | | DATA" TABULAR IN SHEET A-1.0. | | | | | | 7.) THE MINIMUM SETBACK REQUIREMENT FOR LIGHT FIXTURES | | | IS 5 FT. FROM THE PROPERTY LINE. PLEASE DEMONSTRATE | | | COMPLIANCE BY PROVIDING DIMENSIONS IN THE SITE PLAN. | | | | | | 8.) PLEASE DIMENSION THE LOADING ZONE. THE LOADING ZONE | | | SHALL BE A MINIMUM OF 10 FT. WIDE BY 25 FT. LONG. [ZLDR | | | S.94-485] | | | | | | 9.) 3/23/17 REPEAT COMMENT: THE PHOTOMETRIC PLAN MUST | | | DEMONSTRATE THAT ALL LIGHT FIXTURES WILL NOT CAUSE | | | ILLUMINATION IN EXCESS OF 0.5 FOOT CANDLES WHEN | | | MEASURED IN A RESIDENTIAL ZONING DISTRICT. PLEASE SHOW | | | LIGHT OVERFLOW BEYOND THE NORTH AND EAST PROPERTY LINE | | | WHERE THERE ARE RESIDENTIAL UNITS IN THE PHOTOMETRIC | | | PLAN. ALL LIGHT FIXTURES MUST BE ARRANGED TO REFLECT | | | LIGHT AWAY FROM ALL RESIDENTIAL ZONING DISTRICTS. [ZLDR | | | S.94-309 AND S.94-310(D)] | | | | | | 10.) ALL ROOFTOP MECHANICAL EQUIPMENT SHALL NOT BE | | | VISIBLE FROM VIEW. THIS SHALL BE NOTATED IN THE PLANS. | | | | | | NOTES: | | | | | | * ANY CHANGES TO THE PROJECT SHALL BE REFLECTED IN ALL | | | PLANS FOR CONSISTENCY. | | | | | | * REVISIONS TO THE PLANS MAY RESULT IN ADDITIONAL | | | COMMENTS. | | | | | | * THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE | | | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF FDOT | | | RIGHT-OF-WAY LANDSCAPING AND IRRIGATION FOR SOUTH | | | DIXIE. A SEPARATE PERMIT IS REQUIRED FROM FDOT. | | | | | | * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE | | | QUESTIONS. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2017-03-23 |
|
|
Cont ID |
|
| Sent By |
llouie |
Date |
2017-03-23 |
Time |
|
Rev Time |
|
| Received By |
llouie |
Date |
2017-03-23 |
Time |
|
Sent To |
|
|
| Notes |
| 2017-03-23 09:19:59 | ** FAILED ** | | | | | | PLEASE ADDRESS THE FOLLOWING COMMENTS. RESPOND TO THE | | | COMMENTS IN WRITING AND/OR ON THE PLANS WHERE | | | APPLICABLE: | | | | | | 1.) SURVEY MUST BE SIGNED AND SEALED. | | | | | | 2.) PLEASE PROVIDE A FDOT RIGHT-OF-WAY (ROW) PERMIT FOR | | | THE PLANTERS AND LANDSCAPE IMPROVEMENTS ALONG SOUTH | | | DIXIE HWY. | | | | | | 3.) THE MODIFIED CURB CUTS ON PERSHING WAY AND THE | | | ALLEY REQUIRES A ROW PERMIT FROM THE ENGINEERING | | | SERVICES DEPARTMENT. PLEASE PROVIDE. | | | | | | 4.) HOW FAR DOES THE STRUCTURAL CANOPY PROJECT INTO THE | | | ROW ALONG SOUTH DIXIE HIGHWAY AND PERSHING WAY? ROW | | | PERMITS FROM FDOT AND THE ENGINEERING SERVICES | | | DEPARTMENT ARE REQUIRED FOR THE STRUCTURAL ENCROACHMENT | | | INTO THE ROWS. | | | | | | 5.) PLEASE PROVIDE BICYCLE PARKING. ONE (1) BICYCLE | | | PARKING IS REQUIRED FOR EVERY TWENTY (20) PARKING | | | SPACES. [ZLDR S. 94-485(Q)] | | | | | | 6.) SHOW LIGHT FIXTURES IN THE SITE PLAN. INCLUDE | | | SETBACK DIMENSIONS FROM THE PROPERTY LINE. | | | | | | 7.) THE PHOTOMETRIC PLAN MUST DEMONSTRATE THAT ALL | | | LIGHT FIXTURES WILL NOT CAUSE ILLUMINATION IN EXCESS OF | | | 0.5 FOOT CANDLES WHEN MEASURED IN A RESIDENTIAL ZONING | | | DISTRICT. PLEASE SHOW PHOTOMETRIC RANGE BEYOND THE | | | NORTH AND EAST PROPERTY LINE WHERE THERE ARE | | | RESIDENTIAL UNITS. ALL LIGHT FIXTURES MUST BE ARRANGED | | | TO REFLECT LIGHT AWAY FROM ALL RESIDENTIAL ZONING | | | DISTRICTS. [ZLDR S.94-309 AND S. 94-310(D)] | | | | | | 8.) WHERE ARE THE A/C UNITS? SHOW A/C UNITS IN THE | | | PLAN(S). | | | | | | 9.) PROVIDE ALL SETBACK DIMENSIONS FROM THE PROPERTY | | | LINE FOR EACH DUMPSTER PROPOSED IN THE SITE PLAN. | | | | | | 10.) WHAT IS THE DEPTH OF THE PARKING STALLS WITH WHEEL | | | STOPS. PLEASE PROVIDE A DIMENSION IN THE SITE PLAN. | | | | | | 11.) FOR PARKING CALCULATIONS IN THE SITE DATA TABULAR: | | | PROVIDE NUMBERS FOR "EXISTING" AND "PROPOSED". | | | | | | 12.) WHERE IS THE LOADING ZONE? PLEASE ILLUSTRATE IN | | | THE PLANS. | | | | | | | | | NOTE(S): | | | | | | REVISIONS TO THE PLANS MAY RESULT IN ADDITIONAL | | | COMMENTS. PLEASE CONTACT LINDA LOUIE @ (561) 822-1458 | | | IF THERE ARE QUESTIONS. | | | |
|
|