Plan Review Details - Permit 17021107
Plan Review Stops For Permit 17021107
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-03-09 Cont ID  
Sent By rmcdouga Date 2017-03-09 Time 08:06 Rev Time 0.00
Received By rmcdouga Date 2017-03-09 Time 07:06 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2017-03-09 Cont ID  
Sent By tklarge Date 2017-03-23 Time 05:00 Rev Time 0.00
Received By vperez Date 2017-03-09 Time 13:11 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-03-23 Cont ID  
Sent By tklarge Date 2017-03-23 Time 05:00 Rev Time 0.00
Received By tklarge Date 2017-03-20 Time 13:22 Sent To E
Notes
2017-03-20 13:22:50TRAVELING WITH 17021105

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-03-09 Cont ID  
Sent By rmcdouga Date 2017-03-09 Time 08:07 Rev Time 0.00
Received By rmcdouga Date 2017-02-24 Time 14:34 Sent To  
Notes
2017-02-27 14:34:16**TRAVELLING WITH 17021105**

Review Stop P PLUMBING
Rev No 2 Status P Date 2017-03-23 Cont ID  
Sent By tklarge Date 2017-03-23 Time 04:59 Rev Time 0.00
Received By tklarge Date 2017-03-23 Time 04:38 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-03-08 Cont ID  
Sent By tklarge Date 2017-03-08 Time 12:32 Rev Time 0.00
Received By tklarge Date 2017-03-08 Time 12:07 Sent To  
Notes
2017-03-08 12:32:081) SUBMIT TWO COPIES OF THE COMPLETE FSEC CERTIFICATION
 FOR THE SOLAR COLLECTOR AND ALSO FOR THE THERMAL SYSTEM
 FROM THE FSEC WEBSITE. THERE ARE 3 PAGES FOR EACH
 CERRTIFICATION. REFER TO FSEC CERTIFICATION # 00472N &
 #S00171A. WPB AMEND. TO FBC SEC. 107.2.1.
 2) SHT. 1 OF 1 OF THE DRAWING SIGNED & SEALED BY
 J.TORRES - SOLENE TILTED MOUNT NOTES- NOTE #6 REFERS TO
 THE SOLENE INSTALLATION MANUAL FOR THE PLUMBING & SOLAR
 SPECS. SUBMIT TWO COPIES OF THIS MANUAL FOR REVIEW. WPB
 AMEND. TO FBC SEC. 107.2.1.
 3) SHOW THE SIZE OF THE EXPANSION TANK ON THE DIAGRAM.
 4) INDICATE IF THE SOLAR SYSTEM WILL BE SUBJECTED TO A
 VACUUM AND IF SO COMPLY WITH 2014 FBC-MECHANICAL SEC.
 1402.5.2.
 5) 2014 FBC-ENERGY - SEC. R403.4.1 - CIRCULATING HOT
 WATER SYSTEMS SHALL BE PROVIDED WITH AN AUTOMATIC OR
 READILY ACCESSIBLE MANUAL SWITCH THAT CAN TURN OFF THE
 HOT WATER CIRCULATING PUMP WHEN THE SYSTEM IS NOT IN
 USE.
 6) INSULATION FOR THE HOT WATER PIPE SHALL COMPLY WITH
 2014 FBC-ENERGY SEC.R403.4.2.
 7) HEAT TRAPS ARE REQD. ON THE WATER HEATER. 2014
 FBC-ENERGY SEC.R403.4.3.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved