Plan Review Details - Permit 17020752
Plan Review Stops For Permit 17020752
Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2017-12-07 Cont ID  
Sent By mgonzale Date 2017-12-07 Time   Rev Time 1.00
Received By mgonzale Date 2017-12-07 Time   Sent To I
Notes
2017-12-07 14:00:47PROVISO: SUPPLY A TEST PORT (MINI MANHOLE OR LARGE
 CLEANOUT)
  
  
 MANNY GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2017-02-28 Cont ID  
Sent By MGONZALE Date 2017-02-28 Time   Rev Time 0.00
Received By mgonzale Date 2017-02-28 Time 12:29 Sent To I
Notes
2017-02-28 12:32:13ADDRESS PLANNING COMMENTS:
  
 1. LOCATION OF THE GREASE SEPARATOR UNKNOWN.
 YOU MAY SUPPLY A SURVEY OR LOCATION SKETCH
  
 MGONZALEZ
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-12-07 Cont ID  
Sent By cpuell Date 2017-12-07 Time 14:14 Rev Time 0.00
Received By cpuell Date 2017-11-07 Time 13:36 Sent To  
Notes
2017-11-08 13:36:20RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-02-28 Cont ID  
Sent By cpuell Date 2017-02-28 Time 13:16 Rev Time 0.00
Received By cpuell Date 2017-02-16 Time 09:35 Sent To  
Notes
2017-02-17 09:35:23ROUTED TO PLUMB<5K

Review Stop P PLUMBING
Rev No 2 Status P Date 2017-11-16 Cont ID  
Sent By tklarge Date 2017-11-16 Time 07:19 Rev Time 0.00
Received By tklarge Date 2017-11-16 Time 06:53 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2017-02-18 Cont ID  
Sent By tklarge Date 2017-02-18 Time 03:35 Rev Time 0.00
Received By mgonzale Date 2017-02-18 Time 03:14 Sent To  
Notes
2017-02-18 03:35:271) SUBMIT SIZING CALCULATIONS FOR THE INTERCEPTOR.
 COMPLY WITH F.A.C. 64E-6 OR PDI STANDARD G101.
 2) GREASE INTERCEPTOR CAPACITY SHALL COMPLY WITH 2014
 FBC-PLUMBING SEC.1003.3.4.1 & TABLE 1003.3.4.1.
 3) INDICATE ON THE SUBMITTED SPECIFICATION SHEET WHICH
 MODEL OF THE GREASE TRAP IS BEING INSTALLED. WPB AMEND.
 TO FBC SEC. 107.2.1.
 4) SUBMIT A FLOOR PLAN SHOWING THE LOCATION OF THE
 INTERCEPTOR.WPB AMEND. TO FBC SEC. 107.2.1.
 5) SUBMIT A SANITARY RISER DIAGRAM SHOWING HOW THIS
 WILL BE CONNECTED TO THE SANITARY SYSTEM.
 6) IS THIS REPLACING AN EXISTING UNIT OR IS THIS A NEW
 INSTALLLATION. INDICATE SUCH ON THE REQUIRED FLOOR
 PLAN.
 7) WHAT TYPE OF FIXTURE(S) IS DISCHARGING INTO THIS
 INTERCEPTOR? SHOW ON THE REQUIRED FLOOR PLAN.
 8) SINKS USED FOR THE WASHING, RINSING OR SANITIZING OF
 UTENSILS,DISHES, POTS, PANS OR SERVICE WARE USED IN THE
 PREPARATION, SERVING OR EATING OF FOOD SHALL DDISCHARGE
 INDIRECTLY THROUGH AN AIR GAP OR AIR BREAK TO THE
 DRAINAGE SYSTEM. 2014 FBC-PLUMBING SEC.802.1.8.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved