| 2017-02-08 15:15:04 | |
| | 1.)SHOW THE LENGTH OF ALL CUT SECTIONS OF PIPE PER 2014 |
| | FBC-FUEL GAS, SECS. 402.4.1, 402.4.2. OR 2014 FBC-RES |
| | SEC. G2413. |
| | |
| | 2.) SHOW THE TYPE OF PIPE MATERIAL BEING INSTALLED, ALL |
| | PIPE SIZES, AND THE CORRESPONDING EHD NUMBER OF THE |
| | CORRUGATED STAINLESS STEEL TUBING (IF APPLICABLE) FOR |
| | EACH PIPE SIZE. WPB AMENDMENTS TO FBC SEC.107.2.1. |
| | |
| | 3.) SHOW THE BTU LOAD OF EACH APPLIANCE AND THE TOTAL |
| | BTU LOAD ON THE SYSTEM. REFER TO THE 2014 FBC-FUEL GAS |
| | SECS.401.8 THRU 402.6.1 AND TABLES 402.4 (1) THRU 402.4 |
| | (37) OR 2014 FBC-RES. SEC. G2413. |
| | |
| | 4) SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (GAS |
| | METER / MP REGULATOR ) TO THE MOST REMOTE OUTLET IN THE |
| | BUILDING AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS |
| | SEC.402.4.1 OR 2014 FBC-RES. SEC. G 2413.3. |
| | |
| | 5.) INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM |
| | ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. |
| | SEC. G2413.2. . |
| | |
| | 6) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / |
| | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY |
| | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND |
| | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 |
| | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED |
| | AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS |
| | APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF |
| | INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1. |
| | |
| | 7) SUBMIT TWO COPIES OF THE SIZING TABLES USED IN THE |
| | DESIGN FOR THIS GAS SYSTEM OR PLACE A NOTE ON BOTH SETS |
| | OF PLANS LISTING THE SIZING TABLES FROM THE GAS CODE OR |
| | OTHER STANDARD THAT WERE USED IN THE DESIGN OF THIS |
| | SYSTEM. FGC SEC.402.3, FBCR SEC. G 2413.3. |
| | |
| | 8) A SHUTOFF VALVE SHALL BE LOCATED IMMEDIATELY AHEAD |
| | OF EACH REGULATOR. |
| | |
| | 9) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE |
| | LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION |
| | OF ANY OPERABLE DOORS OR WINDOWS. THE |
| | LOCATION OF THE WATER HEATER SHALL COMPLY WITH THE |
| | MANUFACTURER'S INSTALLATION INSTRUCTIONS. THE HOUSE |
| | PLAN CAN BE HAND DRAWN. |
| | |
| | |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |
| | |
| | |
| | |
| | |