Plan Review Details - Permit 17010599
Plan Review Stops For Permit 17010599
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2018-11-09 Cont ID  
Sent By cthroop Date 2018-11-09 Time 16:11 Rev Time 0.00
Received By cthroop Date 2018-11-09 Time 16:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2018-10-26 Cont ID  
Sent By cthroop Date 2018-10-26 Time 15:50 Rev Time 0.00
Received By cthroop Date 2018-10-26 Time 15:49 Sent To P
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2018-06-22 Cont ID  
Sent By cthroop Date 2018-06-22 Time 08:58 Rev Time 0.00
Received By cthroop Date 2018-06-22 Time 08:58 Sent To FIRE
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2017-02-07 Cont ID  
Sent By cthroop Date 2017-02-07 Time 08:40 Rev Time 0.00
Received By cthroop Date 2017-02-07 Time 08:40 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2018-06-20 Cont ID  
Sent By jpearson Date 2018-06-20 Time 09:03 Rev Time 0.00
Received By jpearson Date 2018-06-20 Time 09:03 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2017-09-29 Cont ID  
Sent By jleahy Date 2017-09-29 Time 12:50 Rev Time 0.00
Received By jleahy Date 2017-09-29 Time 12:50 Sent To FIRE
Notes
2017-09-29 13:03:40FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH ED
 NFPA 70 2011 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL
  
 THE CITY IS GOING ASSESS A VALUE OF $80,000 TO THIS
 PROJECT UNLESS A SIGNED CONTRACT IS SUBMITTED
 SHOWING ALL LABOR AND MATERIALS (SUPPLIED BY OWNER OR
 CONTRACTOR) TOTAL JOB VALUE AS STATED ABOVE.
  
 THIS PROJECT INCLUDES A NEW GENERATOR AND TANK ON
 GROUND WITH CONDUCTORS GOING TO THE ROOF, ALONG
 WITH ALL NEW COMMUNICATIONS EQUIPMENT INCLUDING 9 NEW
 ANTENNAS PLUS RRU'S AND THREE NEW CABINETS, GOUNDING
 FROM GROUND LEVEL TO THE ROOF.
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2018-10-23 Cont ID  
Sent By pleduc Date 2018-10-23 Time   Rev Time 0.00
Received By pleduc Date 2018-10-23 Time 12:04 Sent To B
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2018-06-26 Cont ID  
Sent By pleduc Date 2018-06-26 Time   Rev Time 0.00
Received By pleduc Date 2018-06-25 Time 16:56 Sent To I
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2017-10-03 Cont ID  
Sent By pleduc Date 2017-10-03 Time   Rev Time 0.00
Received By pleduc Date 2017-10-02 Time 14:51 Sent To PC
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2018-10-30 Cont ID  
Sent By lcrespo Date 2018-10-30 Time 07:25 Rev Time 0.00
Received By lcrespo Date 2018-10-30 Time 07:25 Sent To  
Notes
2018-10-30 07:26:5810/30/18 REVIEWED FOR CODE COMPLIANCE (GAS)
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVE PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 LUIS A. CRESPO
 PLUMBING PLAN EXAMINER
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2018-06-20 Cont ID  
Sent By lcrespo Date 2018-06-20 Time 08:09 Rev Time 0.00
Received By lcrespo Date 2018-06-18 Time 15:02 Sent To  
Notes
2018-06-19 15:02:3306/19/2018 2ND GAS REVIEW **DENIED** WITH COMMENTS
  
 NOTE - A COMPREHENSIVE REVIEW COULD NOT BE DONE AT THIS
 TIME AND ADDITIONAL PLAN REVIEW COMMENTS MAY BE
 GENERATED UPON THE RE-REVIEW OF SUBMITTED CORRECTIONS.
  
  
 1. SECOND REQUEST ON SHEET. C-7 UNDER THE HEADING GAS
 PIPING NOTES FOR LINE BETWEEN 2ND STAGE REGULATOR AND
 GENERATOR NOTE #5 SHOULD READ 2014 FUEL GAS CODE NOT
 2010. PER WPB AMEND TO FBC 107.2.1
  
 2. SECOND REQUEST PLEASE PROVIDE SIZING TABLE THAT WERE
 USED FOR THIS SYSTEM. PER WPB AMEND TO FBC 107.2.1.
  
 3. SECOND REQUEST ON THE DISTANCE BETWEEN THE PROPANE
 TANK AND GENERATOR SHOW 3?, THE TANK SHALL BE MIN OF
 10' FROM ANY SOURCE OF IGNITION ACCORDING TO NFPA TABLE
 6.3.4.3 SEPARATION DISTANCE BETWEEN CONTAINER PRESSURE
 RELIEF VALVE AND BUILDING OPENINGS.
  
 LUIS A. CRESPO
 PLUMBING INSPECTOR /
 PLUMBING PLAN REVIEW
 AVAILABLE FROM 1:00 PM TO 4:00 PM
 [email protected]
 561-805-6720
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2017-09-29 Cont ID  
Sent By gjohnson Date 2017-02-10 Time 13:29 Rev Time 0.00
Received By gjohnson Date 2017-02-10 Time 13:28 Sent To  
Notes
2017-09-29 13:29:411ST REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 GAS COMMENTS COMMENTS:
  
 1. SHT. C-7 UNDER THE HEADING GAS PIPING NOTES FOR LINE
 BETWEEN 2ND STAGE REGULATOR AND GENERATOR NOTE #5
 SHOULD READ 2014 FUEL GAS CODE NOT 2010. PER WPB AMEND
 TO FBC 107.2.1
  
 2. PLEASE PROVIDE SIZING TABLE THAT WERE USED FOR THIS
 SYSTEM. PER WPB AMEND TO FBC 107.2.1
  
 3. PLEASE SHOW DISTANCE BETWEEN THE PROPANE TANK AND
 GENERATOR. THE TANK SHALL BE MIN OF 10' FROM ANY SOURCE
 OF IGNITION .PER ASME 6.3.10.
  
 DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND
 THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON
 RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS.
  
 WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES
 AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW
 COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE
 AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE
 THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW.
  

Review Stop I INCOMING/PROCESSING
Rev No 5 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By lmarchan Date 2018-11-13 Time 15:33 Sent To  
Notes
2018-11-28 14:13:30ROUTED TO PERMIT LIBRARY FROM ZONING 11/28/18
2018-11-14 15:33:53RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-11-09 Cont ID  
Sent By cthroop Date 2018-11-09 Time 16:11 Rev Time 0.00
Received By cthroop Date 2018-11-05 Time 15:05 Sent To  
Notes
2018-11-07 16:59:12ROUTED FROM ZONING TO LM 11/8/18
2018-11-06 15:05:16RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-10-30 Cont ID  
Sent By lcrespo Date 2018-10-30 Time 07:26 Rev Time 0.00
Received By lcrespo Date 2018-10-16 Time 14:14 Sent To  
Notes
2018-10-22 15:38:23ROUTED FROM ZONING TO LM 8/22/18
2018-10-17 14:14:19RESUB ROUTED TO ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2018-06-27 Cont ID  
Sent By cpuell Date 2018-06-27 Time 11:09 Rev Time 0.00
Received By cpuell Date 2018-05-29 Time 14:47 Sent To  
Notes
2018-06-08 16:51:37SENT TO LAURA MARCHANT 6/8/18
2018-05-30 14:48:14RESUB ROUTED TO ZONING
 **TRAVELLING WITH 17010598**

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-10-03 Cont ID  
Sent By cpuell Date 2017-10-03 Time 14:07 Rev Time 0.00
Received By cpuell Date 2017-01-18 Time 15:22 Sent To  
Notes
2017-01-19 15:23:10ROUTED TO ZONING
 *TRAVELLING WITH 17010598*

Review Stop P PLUMBING
Rev No 1 Status N Date 2017-09-29 Cont ID  
Sent By gjohnson Date 2017-09-29 Time 13:32 Rev Time 0.00
Received By gjohnson Date 2017-09-29 Time 13:30 Sent To  
Notes
2017-09-29 13:32:26WRONG REVIEW STOP GPJ/9/29/17
2017-02-10 09:57:45.
  

Review Stop Z ZONING
Rev No 5 Status P Date 2018-11-28 Cont ID  
Sent By elevesqu Date 2018-11-28 Time 14:12 Rev Time 0.00
Received By elevesqu Date 2018-11-28 Time 14:12 Sent To  
Notes
2018-11-28 14:13:11PROVISO: TO BE LANDSCAPED AS APPROVED BY PERMIT
 18110483
2018-11-19 15:38:34SPOKE TO CHRISTY BARTOLUCCI ON PHONE ON 11/19/2018 -
 WAITING FOR RESUBMITTAL OF TWO SETS OF PLANS

Review Stop Z ZONING
Rev No 4 Status F Date 2018-11-07 Cont ID  
Sent By elevesqu Date 2018-11-07 Time 15:47 Rev Time 0.00
Received By elevesqu Date 2018-11-07 Time 15:47 Sent To B
Notes
2018-11-07 15:48:37SEPARATE LANDSCAPE PERMIT IS REQUIRED TO BE REVIEWED
 CONCURRENTLY.
 APPLICANT EMAILED ON 11/7/18
  
  
 LIZ LEVESQUE
 URBAN DESIGN PLANNER
 561 822 1426
 [email protected]

Review Stop Z ZONING
Rev No 3 Status F Date 2018-10-22 Cont ID  
Sent By elevesqu Date 2018-10-22 Time 15:38 Rev Time 0.00
Received By elevesqu Date 2018-10-22 Time 15:34 Sent To FIRE
Notes
2018-10-22 15:37:53SEPARATE LANDSCAPE PERMIT REQUIRED PER CITY LANDSCAPE
 PLANNER, RAY CARANCI
  
 PER SECTION 94-305, MECHANICAL EQUIPMENT CANNOT PROJECT
 MORE THAN FOUR FEET INTO A REQUIRED SETBACK. THE
 REQUIRED SIDE INTERIOR SETBACK IS 15 FEET FROM THE
 ADJACENT PROPERTY LINE. THE REQUIRED SETBACK FROM
 AUSTRALIAN AVENUE IS 16 FEET. PLEASE ADJUST ACCORDINGLY
 AND INCLUDE DIMENSIONS FOR:
 - REQUIRED SETBACK
 - MAXIMUM EQUIPMENT ENCROACHMENT (FOUR FEET FROM
 SETBACK LINE)
 - PROPOSED SETBACKS
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 2018-06-08 Cont ID  
Sent By elevesqu Date 2018-06-22 Time 16:51 Rev Time 0.00
Received By elevesqu Date 2018-06-08 Time 16:51 Sent To B
Notes
2018-06-08 16:51:11CHAIN LINK FENCE IS NOT ALLOWED IN THIS LOCATION WITHIN
 THE URBAN CORE BOUNDARIES.
  
 APPROPRIATE SCREENING PER SECTION 94-315 SHALL BE
 CONSTRUCTED OF BRICK, DECORATIVE CONCRETE, OTHER
 DECORATIVE MASONRY OR COMPARABLY DURABLE WOOD AND
 STEEL.
 WALLS SHALL BE LANDSCAPED WITH SHRUBS AND HEDGES
 PLANTED AT 2-FOOT INTERVALS.
  
 PLEASE CALL LIZ LEVESQUE 561-822-1426 WITH ANY
 QUESTIONS.

Review Stop Z ZONING
Rev No 1 Status F Date 2017-02-01 Cont ID  
Sent By   Date 2017-02-01 Time   Rev Time 0.00
Received By kmartin Date 2017-02-01 Time 14:23 Sent To B
Notes
2017-02-01 14:24:17BEFORE OBTAINING A PERMIT, YOU MUST SUBMIT AN
 APPLICATION FOR A WIRELESS COMMUNICATION FACILITY.
  
 FOR MORE INFORMATION, PLEASE CONTACT KEVIN J MARTIN AT
 561-822-1426 OR [email protected]
  


Account Summary | Usage Policy | Privacy Policy