Plan Review Details - Permit 17010511
Plan Review Stops For Permit 17010511
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2017-02-20 Cont ID  
Sent By mgonzale Date 2017-02-20 Time   Rev Time 1.00
Received By mgonzale Date 2017-02-20 Time   Sent To I
Notes
2017-02-20 13:02:17PASSED
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-02-21 Cont ID  
Sent By cpuell Date 2017-02-21 Time 09:25 Rev Time 0.00
Received By cpuell Date 2017-01-17 Time 11:53 Sent To  
Notes
2017-01-18 11:53:50ROUTED TO ZONING

Review Stop Z ZONING
Rev No 1 Status P Date 2017-01-19 Cont ID  
Sent By njwira Date 2017-01-19 Time 15:59 Rev Time 0.00
Received By njwira Date 2017-01-19 Time 14:19 Sent To ENG
Notes
2017-01-19 16:02:311/19/17- PASSED
  
 RESIDENTIAL LESS THAN 3 UNITS
  
 LAKEWOOD IS THE FRONT SETBACK
 GARAGE IS APPROVED IN THE FRONT SETBACK
 LOT EXCEEDS 1,000SQFT. OF PERVIOUS SURFACE IN THE FRONT
 SETBACK
 10FT. WIDE DRIVEWAY MEETS 20FT. REQUIREMENT
 10FT. SIDE SETBACK MEETS 3FT. REQUIREMENT
  
 PLEASE CONTACT
 NATHAN WIRA
 [email protected]
 (561)822-1442
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved