| Plan Review Stops For Permit 17010488 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2017-03-23 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2017-03-23 |
Time |
09:54 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2017-03-23 |
Time |
09:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2017-02-15 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2017-02-15 |
Time |
10:24 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2017-02-15 |
Time |
10:24 |
Sent To |
|
|
| Notes |
| 2017-02-15 10:25:11 | INITIAL ELECTRICAL PLAN REVIEW | | | | | | APPLICABLE CODES IN EFFECT: | | | FLORIDA BUILDING CODE 2014 5TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH | | | EDITION | | | NFPA 70- 2011 | | | COMMENTS: | | | | | | PLEASE ADDRESS MECHANICAL COMMENMTS FOR AN ELECTRICAL | | | APPROVAL. | | | FBC 107.3.5 | | | | | | V PEREZ | | | *6717 |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2017-04-04 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-04-04 |
Time |
11:55 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-04-04 |
Time |
11:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2017-02-15 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-02-15 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-02-15 |
Time |
16:37 |
Sent To |
|
|
| Notes |
| 2017-02-15 16:46:41 | 1ST REVIEW | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | PLUMBING COMMENTS: | | | | | | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL | | | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER | | | FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. | | | | | | 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL | | | PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS | | | STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. WPB | | | AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | 3. TYPE OF GAS, (LP OR NATURAL). | | | | | | 4. VENT LIMITERS ARE NOT APPROVED FOR OUT DOOR USE . | | | PER MANUFACTURE SPEC. | | | | | | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, | | | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING | | | AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? | | | USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE | | | SEC. 402.4.1. | | | | | | 6. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014 | | | FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 | | | PSI. | | | | | | 7. NOTE #3 PE PIPE IS NOT APPROVED FOR ABOVE GROUND | | | USE. PER FBC FUEL GAS 404.17.1 | | | | | | DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND | | | THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON | | | RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS. | | | | | | WHEN RESUBMITTING PLANS, REMOVE AND REPLACE ANY PAGES | | | AS NECESSARY. A NARRATIVE LISTING THE ORIGINAL REVIEW | | | COMMENT NUMBER WITH A DESCRIPTION OF THE CHANGES MADE | | | AND IDENTIFYING THE SHEET OR SPECIFICATION PAGE WHERE | | | THE CHANGE CAN BE FOUND WILL HELP EXPEDITE THE REVIEW. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2017-05-09 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-05-09 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-05-01 |
Time |
12:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2017-04-04 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2017-04-04 |
Time |
12:44 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-03-14 |
Time |
08:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2017-02-15 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-02-15 |
Time |
16:48 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-01-27 |
Time |
10:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2017-05-09 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-05-09 |
Time |
13:46 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-05-08 |
Time |
17:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2017-03-27 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-03-27 |
Time |
16:59 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-03-27 |
Time |
16:59 |
Sent To |
|
|
| Notes |
| 2017-03-27 17:15:18 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT # 17010488 | | | 3/27/17 | | | | | | 1) M1.01: PLEASE IDENTIFY ALL ROOMS AND SPACES ON THE | | | PLAN- SECTION M1601.1 FBC-14 RESIDENTIAL | | | | | | 2) M1.01: INDICATE HOW ACESS WILL BE PROVIDED FOR | | | MAINTENANCE AND REPLACEMENT OF THE AIR HANDLER- M1305.1 | | | | | | 3) M1.01: THE 6" FLEX DUCTS ARE UNDERSIZED FOR 150 CFMS | | | WHEN CHECKED WITH THE TRANE DUCTULATER USING 0.1 | | | FRICTION LOSS. | | | | | | 4) M1.01: PROVIDE STRUCTURAL DETAILS FOR INSTALLATION | | | OF THE CONDENSER PAD AND TIE DOWN OF THE CONDENSER- | | | M1305.1.4.1 | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 401 CLEMATIS STREET | | | WEST PALM BEACH FL 33401 | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2017-02-08 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2017-02-08 |
Time |
13:26 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-02-08 |
Time |
13:26 |
Sent To |
|
|
| Notes |
| 2017-02-08 13:55:15 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT #17010488 | | | 2/8/17 | | | | | | 1) PROVIDE AN AC EQUIPMENT SCHEDULE ON THE PLAN THAT | | | LISTS THE MAKES AND MODELS OF THE AIR HANDLER AND | | | CONDENSER, THE COOLING AND HEATING CAPACITIES OF THE | | | SYSTEM, AND THE EFFICIENCY RATING. | | | | | | 2) SUBMIT AN AHRI CERTIFICATE FOR THE AC SYSTEM. | | | | | | 3) PROVIDE DUCTWORK SPECIFICATIONS PER NOTE #5 ON SHEET | | | M1.01. | | | | | | 4) PROVIDE DIFFUSER AND RETURN GRILL SIZES AND THE | | | AIRFLOW CFMS AT EACH LOCATION. | | | | | | 5) PROVIDE AN EQUIPMENT SCHEUDLE FOR THE EXHAUST FAN. | | | | | | 6) PTROVIDE A CONDENSATE DISPOSAL PLAN. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2017-04-04 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-04-04 |
Time |
11:55 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-04-04 |
Time |
11:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2017-02-15 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-02-15 |
Time |
16:37 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-02-15 |
Time |
16:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2017-04-04 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-04-04 |
Time |
11:58 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-04-04 |
Time |
11:58 |
Sent To |
|
|
| Notes |
| 2017-05-09 13:48:53 | MECH DIG/SIG GOOD | | | CCOLE- 5/8/17 | | 2017-04-04 11:59:20 | 4/4/17 DIG SIGS LOOK GOOD/GPJ |
|
|