| 2017-01-20 14:28:25 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) SHEET A 1.11 - THERE ARE SEVERAL DOORS THAT ARE |
| | INDICATED AS OPENING IN THE EGRESS CORRIDORS : 046, |
| | 045, 034, 033, 032, 027, & 028. |
| | |
| | PER NFPA 101 CAHPTER 38, NEW BUSINESS OCCUPANCIES. |
| | |
| | 38.2 MEANS OF EGRESS REQUIREMENTS. |
| | 38.2.1 GENERAL. |
| | 38.2.1.1 ALL MEANS OF EGRESS SHALL BE IN ACCORDANCE |
| | WITH CHAPTER 7 AND THIS CHAPTER. |
| | |
| | PER NFPA 101 CHAPTER 7 , MEANS OF EGRESS. |
| | |
| | 7.2.4.3 DOOR LEAF ENCROACHMENT |
| | |
| | 7.2.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS OF |
| | EGRESS SHALL LEAVE NOT LESS THAN ONE-HALF OF THE |
| | REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY, |
| | OR A LANDING UNOBSTRUCTED AND SHALL PROJECT NOT MORE |
| | THAN 7 IN. (180 MM) INTO THE REQUIREDWIDTH OF AN AISLE, |
| | A CORRIDOR, A PASSAGEWAY, OR A LANDING UNOBSTRUCTED AND |
| | SHALL PROJECT NOT MORE THAN 7 IN. (180 MM) INTO THE |
| | REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY, |
| | OR A LANDING, WHEN FULLY OPEN, UNLESS BOTH OF THE |
| | FOLLOWING CONDITIONS ARE MET: |
| | (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN |
| | EXISTING BUILDING. |
| | (2) THE DOOR OPENING MEETS THE REQUIREMENT THAT LIMITS |
| | PROJECTION TO NOT MORE THAN 7 IN. (180 MM) INTO THE |
| | REQUIRED WIDTH OF THE STAIR LANDING WHEN THE DOOR LEAF |
| | IS FULLY OPEN. |
| | |
| | 7.2.1.4.3.2 SURFACE-MOUNTED LATCH RELEASE HARDWARE ON |
| | THE DOOR LEAF SHALL BE EXEMPT FROM BEING INCLUDED IN |
| | THE MAXIMUM 7 IN. (180 MM) PROJECTION REQUIREMENT OF |
| | 7.2.1.4.3.1, PROVIDED THAT BOTH OF THE FOLLOWING |
| | CRITERIA ARE MET: |
| | (1) THE HARDWARE IS MOUNTED TO THE SIDE OF THE DOOR |
| | LEAF THAT FACES THE AISLE, CORRIDOR, PASSAGEWAY, OR |
| | LANDING WHEN THE DOOR LEAF IS IN THE OPEN POSITION. |
| | (2) THE HARDWARE IS MOUNTED NOT LESS THAN 34 IN. (865 |
| | MM), AND NOT MORE THAN 48 IN. (1220 MM), ABOVE THE |
| | FLOOR. |
| | |
| | PLEASE PROVIDE FOR THE REQUIREMENTS NOTED ABOVE. |
| | |
| | |
| | |
| | 2) EMERGENCY LIGHTING APPEARS TO BE PROVIDED GENERALLY |
| | THROUGHOUT THE PROPOSED PROJECT; HOWEVER, SOME AREAS OF |
| | THE MEANS OF EGRESS APPEAR TO BE UNDERSERVED. |
| | |
| | 38.2.9 EMERGENCY LIGHTING. |
| | 38.2.9.1 EMERGENCY LIGHTING SHALL BE PROVIDED IN |
| | ACCORDANCE WITH SECTION 7.9 IN ANY BUILDING WHERE ANY |
| | ONE OF THE FOLLOWING CONDITIONS EXISTS: |
| | (1) THE BUILDING IS THREE OR MORE STORIES IN HEIGHT. |
| | (2) THE OCCUPANCY IS SUBJECT TO 50 OR MORE OCCUPANTS |
| | ABOVE OR BELOW THE LEVEL OF EXIT DISCHARGE. |
| | (3) THE OCCUPANCY IS SUBJECT TO 300 OR MORE TOTAL |
| | OCCUPANTS. |
| | |
| | 7.9.2 PERFORMANCE OF SYSTEM. |
| | 7.9.2.1* EMERGENCY ILLUMINATION SHALL BE PROVIDED FOR A |
| | MINIMUM OF 1? HOURS IN THE EVENT OF FAILURE OF NORMAL |
| | LIGHTING. EMERGENCY LIGHTING FACILITIES SHALL BE |
| | ARRANGED TO PROVIDE INITIAL ILLUMINATION THAT IS NOT |
| | LESS THAN AN AVERAGE OF 1 FT-CANDLE (10.8 LUX) AND, AT |
| | ANY POINT, NOT LESS THAN 0.1 FT-CANDLE (1.1 LUX), |
| | MEASURED ALONG THE PATH OF EGRESS AT FLOOR LEVEL. |
| | ILLUMINATION LEVELS SHALL BE PERMITTED TO DECLINE TO |
| | NOT LESS THAN AN AVERAGE OF 0.6 FT-CANDLE (6.5 LUX) |
| | AND, AT ANY POINT, NOT LESS THAN 0.06 FT-CANDLE (0.65 |
| | LUX) AT THE END OF 1? HOURS. A MAXIMUM-TO-MINIMUM |
| | ILLUMINATION UNIFORMITY RATIO OF 40 TO 1 SHALL NOT BE |
| | EXCEEDED. |
| | |
| | 7.9.2.3* THE EMERGENCY LIGHTING SYSTEM SHALL BE |
| | ARRANGED TO PROVIDE THE REQUIRED ILLUMINATION |
| | AUTOMATICALLY IN THE EVENT OF ANY INTERRUPTION OF |
| | NORMAL LIGHTING DUE TO ANY OF THE FOLLOWING: |
| | (1) FAILURE OF A PUBLIC UTILITY OR OTHER OUTSIDE |
| | ELECTRICAL POWER SUPPLY |
| | (2) OPENING OF A CIRCUIT BREAKER OR FUSE |
| | (3) MANUAL ACT(S), INCLUDING ACCIDENTAL OPENING OF A |
| | SWITCH CONTROLLING NORMAL LIGHTING FACILITIES |
| | |
| | PLEASE PROVIDE AND/OR ENSURE COMPLIANCE WITH THE |
| | REQUIRMENTS. |
| | |
| | |
| | |
| | 3) SHEET 0.02 - THERE IS NO INDICATIONS OF FIRE ALARM |
| | SYSTEM WORK. |
| | |
| | ANY AND ALL WORK ON THE FIRE ALARM SYSTEM SHALL BE DONE |
| | UNDER SEPARATE SHOP DRAWINGS AND BY CERTIFIED LIFE |
| | SAFETY CONTRACTORS. |
| | |
| | PLEASE PROVIDE AN APPLICABLE NOTE. |
| | |
| | |
| | |
| | 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | |
| | 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |
| | |