Plan Review Details - Permit 17010185
| Plan Review Stops For Permit 17010185 |
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2017-01-12 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-01-20 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2017-01-12 |
Time |
14:38 |
Sent To |
M |
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2017-02-06 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-02-06 |
Time |
11:55 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-02-06 |
Time |
11:55 |
Sent To |
|
|
| Notes |
| 2017-02-06 11:57:51 | PROVISO: | | | ORIGINAL SIGNED AND SEALED ANCHORING DETAILS FOR | | | ABOVEGROUND LP TANK REQUIRED FOR INSPECTION. |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2017-01-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-01-20 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-01-20 |
Time |
09:28 |
Sent To |
|
|
| Notes |
| 2017-01-20 09:31:56 | 1) SUBMIT 2 COPIES OF THE FLOOR PLAN OF THE BOILER AND | | | GAS HANDLING BUILDING THAT CLEARLY SHOWS THE LOCATION | | | OF THE LP TANK.WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) PROVIDE ENGINEERING DETAILS AS TO HOW THE | | | ABOVEGROUND LP TANK WILL BE ANCHORED TO WITHSTAND THE | | | ANTICIPATED WIND LOADS OF 180 MPH (V ULT) PER 2014 | | | FBC-BUILDING SEC.1603.1.4, 1604.1, 1609.1, 2014 | | | FBC-FUEL GAS CODE SEC.301.10 . SHOW THE TYPE & LENGTH | | | OF ANCHORS, ANCHOR LOCATION POINTS, DIAMETER / LENGTH | | | OF TIE-DOWN CABLES (IF USED), NUMBER OF TIE-DOWN CABLES | | | REQD. AND CAPACITIES OF THE ANCHORS/ CABLES. ALSO, | | | REFER TO NFPA 58-2011 ED. SEC. 5.2.4.3 (A) (C). | | | 3) SUBMIT DETAILS AS TO HOW THE ABOVEGROUND TANK WILL | | | BE PROTECTED AGAINST PHYSICAL DAMAGE. | | | 4) IT APPEARS THAT THE PERMIT IS FOR THE TANK ONLY. | | | PLEASE CONFIRM THAT THE PERMIT DOES NOT INCLUDE ANY | | | PIPING.WPB AMEND. TO FBC SEC. 107.2.1. IF ANY PIPING IS | | | INVOLVED, ADDITIONAL PLAN REVIEW CCOMMENTS MAY BE | | | GENERATED ON THE RE-REVIEW. | | | | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | PLUMBING PLAN REVIEW | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2017-02-06 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-02-06 |
Time |
11:56 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-02-03 |
Time |
15:54 |
Sent To |
|
|
| Notes |
| 2017-02-03 15:54:21 | TLARGE'S DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2017-01-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-01-20 |
Time |
09:32 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-01-06 |
Time |
11:01 |
Sent To |
FIRE |
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
N |
Date |
2017-01-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-01-20 |
Time |
09:28 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-01-20 |
Time |
06:31 |
Sent To |
|
|
| Notes |
| 2017-01-20 09:30:00 | THIS REVIEW STEP IS IN ERROR. IT SHOULD HAVE BEEN A GAS | | | REVIEW. SEE THE GAS PLAN REVIEW STEP. |
|
|
|