| 2017-01-20 05:20:21 | 1) SUBMIT 2 COPIES OF THE FLOOR PLAN OF THE WASTE GAS |
| | BURNER AREA THAT CLEARLY SHOWS THE LOCATION OF THE LP |
| | TANK.WPB AMEND. TO FBC SEC. 107.2.1. |
| | 2) SHEET M-ADF-39 OF THE MASTER PERMIT SHOWS THE LP |
| | TANK AS 300 GALLONS W.C. AND THE DOCUMENTS SUBMITTED |
| | NOTE A 250 GALLON W.C. TANK TO BE INSTALLED. CLARIFY. |
| | IF THE 250 TANK IS BEING INSTALLED SUBMIT VERIFICATION |
| | FROM THE ENGINEER OF RECORD THAT THIS CHANGE HAS BEEN |
| | REVIEWED AND APPROVED BY HIM/HER. I AM REQUESTING THIS |
| | STEP BECAUSE THE ORIGINAL PLANS WERE SIGNED & SEALED |
| | AND ANY CHANGES SHALL BE REVIEWED AND APPROVED BY THE |
| | ENGINEER OF RECORD. |
| | 3) PROVIDE ENGINEERING DETAILS AS TO HOW THE |
| | ABOVEGROUND LP TANK WILL BE ANCHORED TO WITHSTAND THE |
| | ANTICIPATED WIND LOADS OF 180 MPH (V ULT) PER 2014 |
| | FBC-BUILDING SEC.1603.1.4, 1604.1, 1609.1, 2014 |
| | FBC-FUEL GAS CODE SEC.301.10 . SHOW THE TYPE & LENGTH |
| | OF ANCHORS, ANCHOR LOCATION POINTS, DIAMETER / LENGTH |
| | OF TIE-DOWN CABLES (IF USED), NUMBER OF TIE-DOWN CABLES |
| | REQD. AND CAPACITIES OF THE ANCHORS/ CABLES. ALSO, |
| | REFER TO NFPA 58-2011 ED. SEC. 5.2.4.3 (A) (C). |
| | 4) SUBMIT DETAILS AS TO HOW THE ABOVEGROUND TANK WILL |
| | BE PROTECTED AGAINST PHYSICAL DAMAGE. |
| | 5) IT APPEARS THAT THE PERMIT IS FOR THE TANK ONLY. |
| | PLEASE CONFIRM THAT THE PERMIT DOES NOT INCLUDE ANY |
| | PIPING.WPB AMEND. TO FBC SEC. 107.2.1. IF ANY PIPING IS |
| | INVOLVED, ADDITIONAL PLAN REVIEW CCOMMENTS MAY BE |
| | GENERATED ON THE RE-REVIEW. |
| | |
| | TIM LARGE |
| | CHIEF PLUMBING INSPECTOR |
| | PLUMBING PLAN REVIEW |
| | 561-805-6692 |
| | [email protected] |
| | |