Plan Review Details - Permit 16120922
Plan Review Stops For Permit 16120922
Review Stop G GAS REVIEW
Rev No 4 Status P Date 2017-01-18 Cont ID  
Sent By tklarge Date 2017-01-18 Time 12:22 Rev Time 0.00
Received By tklarge Date 2017-01-18 Time   Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2017-01-17 Cont ID  
Sent By tklarge Date 2017-01-17 Time 13:55 Rev Time 0.00
Received By tklarge Date 2017-01-17 Time 13:34 Sent To  
Notes
2017-01-17 13:55:321) THE REVISED PLANS NOW SHOW CSST IN THE CRAWL SPACE
 BUT YOU HAVE NOT PROVIDED THE SIZING TABLE USED FOR THE
 CSST. A COMPLETE REVIEW CANNOT BE DONE WITHOUT KNOWING
 WHICH SIZING TABLE IS BEING USED. 2014 FBC-FUEL GAS
 SEC.402.3.
 2) SUPPLY THE CORRESPONDING EHD FOR THE CSST SIZES.
 3) THE SIZE OF THE 3/4 INCH LOW PRESSURE LINE TO THE
 POOL HEATER SHALL BE 1 INCH PER TABLE 402.4 (2) .
 MAXIMUM BTU LOAD ON 3/4 INCH GALVANIZED PIPE IS 360
 MBTU.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2017-01-10 Cont ID  
Sent By tklarge Date 2017-01-10 Time 06:36 Rev Time 0.00
Received By tklarge Date 2017-01-10 Time 04:44 Sent To  
Notes
2017-01-10 06:35:421) SHT. G-2 - SHOW THE PIPE SIZE OF THE UNDERGROUND PE
 PIPE WHERE IT TRANSITIONS FROM THE 1 1/4" GALVANIZED
 LINE. IF IT IS 3/4 INCH PE PIPE IT IS UNDERSIZED PER
 2014 FBC FUEL GAS TABLE 402.4 (22). A MAXIMUM OF
 860,000 BTU'S CAN BE SUPPLIED BY A 3/4 INCH PE PIPE AT
 133 FEET( MUST USE THE 150 FT. ROW). THE PLANS NOTE THE
 TOTAL LOAD AS 1177 MBTU/H.
 2) SHOW THE PIPE SIZE OF THE SECTION OF 2 PSI PE
 UNDERGROUND PIPE THAT SUPPLIES THE POOL HEATER AND
 TANKLESS WATER HEATER # 3. ( IT IS THE SECTION BETWEEN
 THE TWO "TEE" FITTINGS).
 3) SIZE THE 2 PSI BRANCH LINE TO THE BBQ.IS THIS
 GALVANIZED OR PE?
 4) SIZE THE 2 PSI RISER TO THE TANKLESS WATER HEATER
 #1.
 5) SIZE THE 2 PSI RISER TO THE COOKTOP AND DRYER.
 6) SIZE THE 2 PSI RISER TO THE TANKLESS WATER HEATER
 #2.
 7) SHT. G-2 - CLEARLY INDICATE ON THE RISER DIAGRAM
 WHERE THE PIPING BEGINS IN THE CRAWL SPACE. IT APPEARS
 TO OCCCUR BY TANKLESS WATER HEATER #1. CLARIFY.
 8) SHOW THE DISTANCE FROM THE STEP DOWN REGULATOR TO
 THE APPLIANCE. THIS DISTANCE MUST BE SUPPLIED TO ENSURE
 CORRECT SIZING OF THE LOW PRESSURE SYSTEM. EACH ONE IS
 DIFFERENT SO DO NOT SUPPLY A TYPICAL DISTANCE FOR ALL
 OF THEM.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-12-31 Cont ID  
Sent By tklarge Date 2016-12-31 Time 06:06 Rev Time 0.00
Received By tklarge Date 2016-12-31 Time 05:07 Sent To  
Notes
2016-12-31 05:52:241)THE SUBMITTED PLAN SHEETS CONTAIN AN ARCHITECT'S
 TITLE BLOCK AND COPY OF HIS SEAL. THESE PLANS MUST BE
 SIGNED AND SEALED BY THE ARCHITECT PER THE FL. ADMIN.
 CODE RULE 61G1-16.001.
 2) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE DRYER AND
 THE FIREPLACE. SHOW THE DIMENSIONS (LXWXH) OF THE
 LAUNDRY ROOM AND THE FAMILY ROOM ON THE PLAN. 2014
 FBC-FUEL GAS CODE SEC.304.1 OR 2014 FBC-RES. SEC. G
 2407. THE VENT BLOCKS SHALL BE ADEQUATE TO AUPPLY THE
 REQUIRED AMOUNT OF COMBUSTION AIR.
 3) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS /
 INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY
 COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND
 FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014
 FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED
 AND LABELED. THE INSTALLATION MANUALS FOR ALL GAS
 APPLIANCES / EQUIPMENT SHALL BE ONSITE AT THE TIME OF
 INSPECTION. FGC SEC.305.1, FBC-RES. SEC.G2408.1.
 4) SHOW THE DISTANCE FROM THE POINT OF DELIVERY ( MP
 REGULATOR ) TO THE MOST REMOTE OUTLET IN THE BUILDING
 AND / OR SYSTEM PER THE 2014 FBC-FUEL GAS SEC.402.4.1
 OR 2014 FBC-RES. SEC. G 2413.3. THIS IS REQUIRED TO
 CHECK THE SIZES ON THE LOW-PRESSURE SYSTEM.
 5) SUBMIT TWO COPIES OF A HOUSE PLAN SHOWING THE
 LOCATION OF THE TANKLESS WATER HEATER AND THE LOCATION
 OF ANY OPERABLE DOORS OR WINDOWS. THE LOCATION OF THE
 TANKLESS WATER HEATER SHALL COMPLY WITH THE
 MANUFACTURER'S INSTALLATION INSTRUCTIONS.THE NOTES ON
 THE SURVEY ARE ILLEGIBLE WITH ALL THE GAS INFORMATION
 THAT HAS BEEN WRITTEN ON IT. SUBMIT AN
 ENLARGED/EXPANDED SURVEY WITH THE REQUIRED INFORMATION
 ON IT.
  
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By tklarge Date 2017-01-18 Time 12:11 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-01-17 Cont ID  
Sent By tklarge Date 2017-01-17 Time 13:55 Rev Time 0.00
Received By tklarge Date 2017-01-11 Time 15:15 Sent To  
Notes
2017-01-11 15:15:06RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-01-10 Cont ID  
Sent By tklarge Date 2017-01-10 Time 06:36 Rev Time 0.00
Received By tklarge Date 2017-01-09 Time 17:20 Sent To  
Notes
2017-01-09 17:21:04TLARGE'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-12-31 Cont ID  
Sent By tklarge Date 2016-12-31 Time 06:06 Rev Time 0.00
Received By tklarge Date 2016-12-28 Time 09:42 Sent To  
Notes
2016-12-29 09:42:35ROUTED TO PLUMBING INBOX