| Plan Review Stops For Permit 16120592 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2016-12-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-12-19 |
Time |
16:46 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-12-19 |
Time |
06:47 |
Sent To |
|
|
| Notes |
| 2016-12-19 17:35:06 | APPROVED FOR GUARDS AND HANDRAILS. ADDITIONAL | | | STRUCTURAL DETAILS ARE REQUIRED TO BE SUBMITTED FOR THE | | | STEEL STAIR FABRICATION, AS WELL AS, THE ANCHORING OF | | | THE STAIRS AND GUARDS. THE DRAWING #A2.0 THAT IS | | | REFERENCED IN THE SHOP DRAWINGS WAS NOT SUBMITTED. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-12-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-12-19 |
Time |
16:47 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-12-13 |
Time |
10:15 |
Sent To |
|
|
| Notes |
| 2016-12-16 10:16:05 | SUBMITTAL ROUTED TO RMCDOUGAL |
|
|
|