| Plan Review Stops For Permit 16120313 |
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2016-12-14 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-12-14 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-12-13 |
Time |
15:46 |
Sent To |
M |
|
| Notes |
| 2016-12-14 08:39:47 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | | | | | | | 1) THE INSTALLATION CAN USE "WORKING PRESSURE" FOR THE | | | TEST ON THIS INSTALLTION; HOWEVER, IT IS IMPORTANT TO | | | REVIEW THEFIRE PUMP, IF INSTALLED IN THE BLDG, TEST | | | PRESSURE PRIOR TO DETERMINING WORKING PRESSURE. | | | | | | THE FIRE INSPECTOR WILL VERIFY/CONFIRM AND INSPECTION. | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-12-22 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2016-12-22 |
Time |
06:33 |
Rev Time |
0.00 |
| Received By |
hmoser |
Date |
2016-12-08 |
Time |
16:25 |
Sent To |
|
|
| Notes |
| 2016-12-08 16:25:27 | ROUTED TO FIRE INBOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2016-12-22 |
|
|
Cont ID |
|
| Sent By |
hmoser |
Date |
2016-12-22 |
Time |
06:32 |
Rev Time |
0.00 |
| Received By |
hmoser |
Date |
2016-12-22 |
Time |
06:29 |
Sent To |
|
|
| Notes |
|
|
|