Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-03-15 Cont ID  
Sent By jwitmer Date 2017-03-15 Time 11:36 Rev Time 0.00
Received By jwitmer Date 2017-03-15 Time 11:00 Sent To  
Notes
2017-03-15 11:36:16BUILDING PLAN REVIEW
 W. P. B. PERMIT: 16120050
 ADD: 4375 EASLEY DR. NEW SCREENING BUILDING
 CONT: TBD
 TEL: 954-609-1525
 E-MAIL: [email protected]
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2ND REVIEW
 DATE: WED. MARCH 15/ 2017
 ACTION: BUILDING PROVISO:
  
 1) BUILDING PROVISO: DEFERRED SUBMITTAL 107.3.4.2.
 PLEASE PROVIDE COMPLIANCE WITH 2014 FBC-B 1609.1.2
 PROTECTION OF OPENINGS, 1609.6.4.4.1 COMPONENTS &
 CLADDING. FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE
 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR
 CONSTRUCTION SYSTEMS THAT WILL REQUIRE PRODUCT
 APPROVALS:
 (31)(A) EXTERIOR DOORS ,MULLIONS & ROOF HATCHES.
 (B) WINDOWS & MULLIONS
 (C) PANEL WALLS: WALL LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP
 VENTILATORS
 (G) PRE-ENGINEERED A/C STANDS
 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH
 ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR
 TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. FL
 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR
 SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS,
 SHOP DRAWINGS ETC..
  
 JAMES A. WITMER PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION/ DEVELOPMENT SERVICES
 DEPARTMENT
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2017-03-02 Cont ID  
Sent By jwitmer Date 2017-03-02 Time 14:24 Rev Time 0.00
Received By jwitmer Date 2017-03-02 Time 13:34 Sent To  
Notes
2017-03-02 14:24:44BUILDING PLAN REVIEW
 W. P. B. PERMIT: 16120050
 ADD: 4375 EASLEY DR. NEW SCREENING BUILDING
 CONT: TBD
 TEL: 954-609-1525
 E-MAIL: [email protected]
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2ND REVIEW
 DATE: THURS. MARCH 02/ 2017
 ACTION: DENIED
  
 1) COMPLIED.
  
 2) PLEASE NOTE ONLY (1) COLOR COPIED PIXELATED SIGNED
 AND SEALED SOILS REPORT WAS SUBMITTED. 2014 FLORIDA
 BUILDING CODE W 2014 WEST PALM BEACH AMENDMENTS TO THE
 FLORIDA BUILDING CODE, CHAPTER 1, ADMINISTRATION
 SECTION 107.1 SUBMITTAL DOCUMENTS CONSISTING OF
 CONSTRUCTION DOCUMENTS, STATEMENT OF SPECIAL
 INSPECTIONS, GEOTECHNICAL REPORT AND OTHER DATA SHALL
 BE SUBMITTED IN TWO OR MORE SETS WITH EACH PERMIT
 APPLICATION.
  
 3-5) COMPLIED.
  
 6) BUILDING PROVISO: DEFERRED SUBMITTAL 107.3.4.2.
 PLEASE PROVIDE COMPLIANCE WITH 2014 FBC-B 1609.1.2
 PROTECTION OF OPENINGS, 1609.6.4.4.1 COMPONENTS &
 CLADDING. FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE
 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR
 CONSTRUCTION SYSTEMS THAT WILL REQUIRE PRODUCT
 APPROVALS:
 (31)(A) EXTERIOR DOORS ,MULLIONS & ROOF HATCHES.
 (B) WINDOWS & MULLIONS
 (C) PANEL WALLS: WALL LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP
 VENTILATORS
 (G) PRE-ENGINEERED A/C STANDS
 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH
 ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR
 TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. FL
 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR
 SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS,
 SHOP DRAWINGS ETC..
  
 JAMES A. WITMER PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION/ DEVELOPMENT SERVICES
 DEPARTMENT
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-12-21 Cont ID  
Sent By jwitmer Date 2016-12-21 Time 14:36 Rev Time  
Received By jwitmer Date 2016-12-21 Time   Sent To  
Notes
2016-12-21 14:36:00BUILDING PLAN REVIEW
 W. P. B. PERMIT: 16120050
 ADD: 4375 EASLEY DR. NEW SCREENING BUILDING
 CONT: TBD
 TEL: 954-609-1525
 E-MAIL: [email protected]
  
 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 1ST REVIEW
 DATE: WED. DEC. 21/ 2016
 ACTION: DENIED
  
 1A) THE COVERSHEET INDICATES THE SUBMITTED PLANS ARE
 VOLUME 2 OF 2. WHERE IS VOLUME 1 OF 2? IT WOULD APPEAR
 ONLY ? OF THE PLANS WERE SUBMITTED? 107.2.1.3
 ADDITIONAL INFORMATION IS REQUIRED.
  
 1B) THE PLANS INDICATE THE SUBMITTED PLANS ARE FOR
 PERMIT SET NOT CONSTRUCTION, IS THERE GOING TO BE A
 DIFFERENT SET OF PLANS TO BUILD THE STRUCTURE? IF SO
 THEY WILL NEED TO BE REVIEWED AND APPROVED.
 107.3.1 APPROVAL OF CONSTRUCTION DOCUMENTS. WHEN THE
 BUILDING OFFICIAL ISSUES A PERMIT, THE CONSTRUCTION
 DOCUMENTS SHALL BE NOTED, IN WRITING OR BY STAMP, AS
 ?REVIEWED FOR CODE COMPLIANCE.? ONE SET OF CONSTRUCTION
 DOCUMENTS SO REVIEWED SHALL BE RETAINED BY THE BUILDING
 OFFICIAL. THE OTHER SET SHALL BE RETURNED TO THE
 APPLICANT, SHALL BE KEPT AT THE SITE OF WORK AND
 SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL OR
 A DULY AUTHORIZED REPRESENTATIVE.
  
 2) PLEASE NOTE ONLY (1) ORIGINAL SIGNED AND SEALED
 SOILS REPORT WAS SUBMITTED. 2014 FLORIDA BUILDING CODE
 W 2014 WEST PALM BEACH AMENDMENTS TO THE FLORIDA
 BUILDING CODE, CHAPTER 1, ADMINISTRATION SECTION 107.1
 SUBMITTAL DOCUMENTS CONSISTING OF CONSTRUCTION
 DOCUMENTS, STATEMENT OF SPECIAL INSPECTIONS,
 GEOTECHNICAL REPORT AND OTHER DATA SHALL BE SUBMITTED
 IN TWO OR MORE SETS WITH EACH
 PERMIT APPLICATION.
  
 3) SHEET S-SCBG-1 27 OF 112 SHOWS WHAT APPEARS TO BE A
 CONTINUOUS FOUNDATION. SHEET S-SCBG-2 THE FOUNDATION
 STEEL REBAR NOTATION INDICATES: #5@ 8 INCHES EW T & B.
 S-SCBG-1 ALSO HAS THE SAME NOTATION FOR THE STEEL
 REINFORCING AS FOR INDIVIDUAL FOUNDATION PADS. THIS
 STEEL NOTATION IS USUALLY FOR INDIVIDUAL FOOTER PADS
 NOT A CONTINUOUS FOUNDATION AS ILLUSTRATED SHEETS
 A-SCG-1 & S-SCBG-1? 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED.
  
 4A) SHEET S-SCBG-2 INDICATES THE USE OF 8 INCH HOLLOW
 CORE SLABS BY PRECASTER. PRECASTER IS TO INCLUDE IN
 THEIR DESIGN THE WEIGHT OF PIPING TO BE HUNG FROM THE
 HOLLOW CORE ROOF SLABS. SHEET S-GEN-1. THE DESIGN
 CRITERIA FOR THE ROOF LIVE LOADS INDICATES 20 PSF. IS
 THERE TO BE ADDITIONAL WEIGHT FIGURED IN, IF SO PLEASE
 PROVIDE. 2014 FBC-B TABLE 1607.1 SEE CONCENTRATED
 LOADS.
  
 4B) PLEASE PROVIDE THE MANUFACTURERS SHOP DRAWINGS
 SHOWING SPANS, AND LOADING OF THE ROOF DECK. 107.2.1.2
 FOR ROOF ASSEMBLIES REQUIRED BY THE CODE, THE
 CONSTRUCTION DOCUMENTS SHALL ILLUSTRATE, DESCRIBE AND
 DELINEATE THE TYPE OF ROOFING SYSTEM, MATERIALS,
 FASTENING REQUIREMENTS, FLASHING REQUIREMENTS AND WIND
 RESISTANCE RATING THAT ARE REQUIRED TO BE INSTALLED.
 PRODUCT EVALUATION AND INSTALLATION SHALL INDICATE
 COMPLIANCE WITH THE WIND CRITERIA REQUIRED FOR THE
 SPECIFIC SITE OR A STATEMENT BY AN ARCHITECT OR
 ENGINEER FOR THE SPECIFIC SITE MUST BE SUBMITTED WITH
 THE CONSTRUCTION DOCUMENTS.
  
  
 5A) SHEET S-SCBG-2 PLEASE CLARIFY THE NOTATION OF THE
 REBAR OVER THE OVERHEAD DOOR. THERE IS ONE NOTE THAT
 STATES 12 INCH CMU WITH 2X2# 5 BOND BEAM AT TOP OF THE
 WALL. THERE IS ANOTHER NOTE AT THE OVERHEAD DOOR ONLY
 TO PROVIDE ADDED BARS, 2# 7 T & B THE FULL WITH OF THE
 BUILDING AND # 3 TIES @ 16 INCHES ON CENTER.
 THE ADDED TOP # 7 REBARS ARE THEY IN THE SAME TOP
 COURSE AS THE 2X2#5 BARS? WITH CORNER BARS THERE WILL
 NO ROOM LEFT FOR THE CONCRETE MIX PLEASE EXPLAIN?
 107.2.1.3.ADDITIONAL INFORMATION REQUIRED.
 5B) THE SECOND QUESTION IS ABOUT THE #3 VERTICAL TIES,
 ARE THESE TO BE CONSIDERED STIRRUPS, HOOPS OR THE USE
 OF HAIRPINS SINCE THERE ARE MULTIPLE LAYERS OF
 HORIZONTAL STEEL AND LINTEL AND BLOCK COURSE WORK?
 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
  
 6) PLEASE PROVIDE COMPLIANCE WITH 2014 FBC-B 1609.1.2
 PROTECTION OF OPENINGS, 1609.6.4.4.1 COMPONENTS &
 CLADDING. FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE
 9N-3 NOV. 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR
 CONSTRUCTION SYSTEMS THAT WILL REQUIRE PRODUCT
 APPROVALS:
 (31)(A) EXTERIOR DOORS ,MULLIONS & ROOF HATCHES.
 (B) WINDOWS & MULLIONS
 (C) PANEL WALLS: WALL LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP
 VENTILATORS
 (G) PRE-ENGINEERED A/C STANDS
  
 FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH
 ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED
 AND APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR
 TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. FL
 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR
 SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS,
 SHOP DRAWINGS ETC..
  
 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS
 SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE
 PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE
 TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO
 THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD.
 DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR
 APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST
 THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS
 FOR REVIEW BY THE BUILDING OFFICIAL.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 7) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION
 & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
  
  
 JAMES A. WITMER PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION/ DEVELOPMENT SERVICES
 DEPARTMENT
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2017-02-27 Cont ID  
Sent By vperez Date 2017-02-27 Time 14:01 Rev Time 0.00
Received By vperez Date 2017-02-27 Time 14:01 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-12-27 Cont ID  
Sent By vperez Date 2016-12-27 Time 11:06 Rev Time 0.00
Received By vperez Date 2016-12-27 Time 11:06 Sent To  
Notes
2016-12-27 11:07:21PASSED FOR DEMO ONLY
  
 V PEREZ
 *6717

Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2017-03-03 Cont ID  
Sent By   Date 2017-03-03 Time   Rev Time  
Received By   Date 2017-03-03 Time   Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2017-02-23 Cont ID  
Sent By pleduc Date 2017-02-23 Time   Rev Time 0.00
Received By pleduc Date 2017-02-23 Time 12:45 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-12-16 Cont ID  
Sent By pleduc Date 2016-12-16 Time   Rev Time 0.00
Received By pleduc Date 2016-12-16 Time 13:09 Sent To  
Notes
2016-12-16 15:14:47PASSED FOR DEMO ONLY.
  
 SEE FIRE FAILED COMMENTS FOR IMPROVEMENTS # 16120050

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2018-04-04 Cont ID  
Sent By shill Date 2018-01-09 Time 10:48 Rev Time 0.00
Received By shill Date 2018-01-09 Time 10:47 Sent To  
Notes
2018-04-04 10:48:32BOND OBTAINED; NOTICE TO PROCEED ISSUED, ROUTED TO
 FILENET
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2018-04-04 Cont ID  
Sent By shill Date 2017-09-01 Time 10:46 Rev Time 0.00
Received By shill Date 2017-09-01 Time 10:46 Sent To  
Notes
2018-04-04 10:47:29PROJECT OUT TO BID

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-03-03 Cont ID  
Sent By   Date 2017-03-03 Time   Rev Time 0.00
Received By lmarchan Date 2017-02-13 Time 12:50 Sent To  
Notes
2017-02-15 12:50:22C34
 **TRAVELLING WITH 16120051**

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2017-02-13 Cont ID  
Sent By cpuell Date 2017-02-13 Time 15:15 Rev Time 0.00
Received By cpuell Date 2016-12-01 Time 08:58 Sent To  
Notes
2016-12-06 08:58:52C34

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status N Date   Cont ID  
Sent By   Date 2016-12-21 Time   Rev Time  
Received By   Date 2016-12-21 Time   Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2016-12-20 Cont ID  
Sent By ccole Date 2016-12-20 Time 11:06 Rev Time 0.00
Received By ccole Date 2016-12-20 Time 11:06 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2019-04-15 Cont ID  
Sent By gjohnson Date 2019-04-15 Time 07:39 Rev Time 0.00
Received By gjohnson Date 2019-04-15 Time 07:39 Sent To  
Notes
2019-04-15 07:47:35PLUMBING PROVISO:
  
 SHALL COMPLY PRIOR TO FINAL INSPECTION.
  
 1. PROVIDE ISOMETRIC DRAWING FOR THE FLOOR DRAIN. PER
 WPB AMEND TO FBC 107.3.5.1.3(13)
  
 2. A TRAP PRIMER IS REQUIRED ON THE FLOOR DRAIN. FBC PL
 1002.4.1
  
 3. A VENT IS REQUIRED FOR THE FLOOR DRAIN. FBC ACC
 901.2.1
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]

Review Stop P PLUMBING
Rev No 1 Status N Date 2017-01-17 Cont ID  
Sent By gjohnson Date 2017-01-17 Time 14:09 Rev Time 0.00
Received By gjohnson Date 2017-01-17 Time 14:09 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2017-01-10 Cont ID  
Sent By jroach Date 2017-01-10 Time 16:27 Rev Time 0.00
Received By jroach Date 2017-01-10 Time 16:27 Sent To  
Notes
***NONE***