Plan Review Details - Permit 16111205
Plan Review Stops For Permit 16111205
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-12-17 Cont ID  
Sent By tklarge Date 2016-12-17 Time 03:11 Rev Time 0.00
Received By tklarge Date 2016-12-17 Time 03:01 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-12-08 Cont ID  
Sent By tklarge Date 2016-12-08 Time 03:33 Rev Time 0.00
Received By tklarge Date 2016-12-08 Time 03:15 Sent To  
Notes
2016-12-08 03:33:421) INDICATE ON THE PLANS THE TYPE OF BASE/BACKER BOARD
 THAT IS BEING INSTALLED FOR THE TILE IN THE SHOWER.
 COMPLY WITH 2014 FBCR SECS.R702.3.8, R702.3.8.1 &
 R702.4.1.
 2) SHOWER GLASS DOORS SHALL COMPLY WITH 2014 FBCR
 SEC.R308.1. SUBMIT MANUF.SPECIFICATIONS FOR THE GLASS
 DOORS. WPB AMEND. TO FBC SEC. 107.2.1.
 3) SUPPLY MORE INFORMATION FOR THE CEILING REPAIR IN
 THE GARAGE. WHAT EXACTLY IS BEING DONE? "REPAIR
 CEILING" IS TOO VAGUE. IS DRYWALL BEING REMOVED AND
 REPLACED" IF SO HOW MUCH AND WHERE IS IT BEING
 REPLACED? CLARIFY.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-12-17 Cont ID  
Sent By tklarge Date 2016-12-17 Time 03:12 Rev Time 0.00
Received By tklarge Date 2016-12-15 Time 09:06 Sent To  
Notes
2016-12-16 09:06:55RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-12-08 Cont ID  
Sent By tklarge Date 2016-12-08 Time 03:34 Rev Time 0.00
Received By tklarge Date 2016-11-29 Time 11:24 Sent To  
Notes
2016-11-30 11:24:20ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 2 Status P Date 2016-12-17 Cont ID  
Sent By tklarge Date 2016-12-17 Time 03:01 Rev Time 0.00
Received By tklarge Date 2016-12-17 Time 02:53 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-12-08 Cont ID  
Sent By tklarge Date 2016-12-08 Time 03:14 Rev Time 0.00
Received By tklarge Date 2016-12-08 Time 02:59 Sent To  
Notes
2016-12-08 03:14:471) NEW SHOWER VALVE SHALL BE OF THE PRESSURE -BALANCE,
 THERMOSTATIC-MIXING OR COMBINATION
 PRESSURE-BALANCE/THERMOSTATIC-MIXING VALVE TYPE WITH A
 HIGH LIMIT STOPCOMPLYING WITH ASSE 1016 OR ASME
 A112.18/CSA B125.1. 2014 FBCR SEC.P2708.3.INDICATE TYPE
 OF SHOWER VALVE TO BE INSTALLED ON THE PLANS.
 2) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS AND INSTALLATION INSTRUCTIONS FOR THE
 WATERPROOFING SYSTEM FOR THE SHOWER. WPB AMEND. TO FBC
 SEC. 107.2.1.
 3) THE WATERPROOFING SYSTEM SHALL COMPLY WITH 2014 FBCR
 SEC.P2709.2.4 AND ANSI A118.10.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  
  