Plan Review Details - Permit 16100897
Plan Review Stops For Permit 16100897
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-11-10 Cont ID  
Sent By skennedy Date 2016-11-10 Time 10:39 Rev Time 0.00
Received By skennedy Date 2016-11-10 Time 10:39 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-11-04 Cont ID  
Sent By cthroop Date 2016-11-04 Time 13:08 Rev Time 0.00
Received By cthroop Date 2016-11-04 Time 13:02 Sent To  
Notes
2016-11-04 13:12:54BUILDING PLAN REVIEW
 2014 FLORIDA BUILDING CODE W/2010 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 CHRISTOPHER S. THROOP, C.B.O.
 BUILDING PLANS EXAMINER ? PX3169
 CONSTRUCTION SERVICES DIVISION
 TEL: 561-805-6726
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
 1ST REVIEW
 RESULTS: DENIED
  
 1. VALUATION ? BASED ON THE MARSHALL-SWIFT VALUATION
 SERVICE YOUR STATED VALUE APPEARS LOW.
 THE STATED VALUATION IS TOO LOW FOR THE PROPOSED SCOPE
 OF WORK.
 THE PERMIT VALUATION AND PERMIT FEE MUST BE
 COMMENSURATE WITH THE VALUATION AND FEE THAT A LICENSED
 CONTRACTOR WOULD PROVIDE. PLEASE INCREASE THE VALUATION
 ACCORDINGLY.
 YOU MAY PROVIDE A COPY OF THE CONTRACT SIGNED BY THE
 OWNER TO VERIFY VALUE.
  
 CITY OF WPB CHPT. 1
 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE OPINION OF
 THE BUILDING OFFICIAL, THE CLAIMED VALUATION OF
 BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS,
 MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE
 UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE
 DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED,
 QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS
 (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE
 BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION
 OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT
 VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING,
 MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK,
 ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION
 COST ANALYSIS SERVICES (MARSHALL-SWIFT, MEANS, ETC.),
 AS PUBLISHED BY INTERNATIONAL CODE CONGRESS.
 FINAL BUILDING PERMIT VALUATION SHALL BE SET BY THE
 BUILDING OFFICIAL.
  
 2. IDENTIFY LIFT CAPACITY.
  

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2016-11-10 Cont ID  
Sent By skennedy Date 2016-11-10 Time 10:40 Rev Time 0.00
Received By skennedy Date 2016-11-10 Time 10:39 Sent To  
Notes
2016-11-10 10:40:30A SEPARATE PERMIT WILL BE APPLIED FOR FOR THE
 ELECTRICAL WORK.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-11-03 Cont ID  
Sent By mvaldes Date 2016-11-03 Time 18:48 Rev Time 0.00
Received By mvaldes Date 2016-11-03 Time 18:33 Sent To B
Notes
2016-11-03 18:59:421ST REVIEW 2014 5TH FBC ED. NEC 2011
 MARIO VALDES
 ELECTRICAL PLAN EXAMINER
 561-805-6713
 [email protected]
  
  
 1] EVEN THOUGH MANUFACTURE SPECS WERE PROVIDED, A SITE
 SPECIFIC ONE LINE DIAGRAM SHOWING WIRE, BREAKER AND
 CONDUIT SIZE OF THE BRANCH CIRCUIT FEEDING THE BOAT
 LIFT MOTOR CONTROLLER WILL BE REQUIRED. FBC-107.
  
 2] GFCI PROTECTION IS REQUIRED IN ACCORDANCE WITH
 210.8(C). A BLOCK NOTE WILL SUFFICE.
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-11-04 Cont ID  
Sent By cthroop Date 2016-11-04 Time 13:02 Rev Time 0.00
Received By cthroop Date 2016-10-28 Time 12:40 Sent To  
Notes
2016-10-31 12:40:38ROUTED TO ZONING

Review Stop Z ZONING
Rev No 1 Status P Date 2016-11-03 Cont ID  
Sent By njwira Date 2016-11-03 Time 10:23 Rev Time 0.00
Received By njwira Date 2016-11-01 Time 14:17 Sent To E
Notes
***NONE***