| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE PLANS HAVE SEVERAL REFERENCES TO THE 2010 FBC ON |
| | SHEET 1. THE FBC FIFTH EDITION (2014) WENT INTO EFFECT |
| | ON JUNE 30, 2015. ALL NEW PERMITS APPLIED FOR ON OR |
| | AFTER THAT DATE ARE REQUIRED TO COMPLY WITH AND |
| | REFERENCE THE FBC FIFTH EDITION. |
| | |
| | 2) ON SHEET 1 OF THE PLANS THIS PROJECT IS SPECIFIED AS |
| | A LEVEL 3 ALTERATION. IT APPEARS THAT THE WORK INVOLVES |
| | LESS THAN 50 PERCENT OF THE EXISTING BUILDING, WHICH |
| | MAKES THIS A LEVEL 2 ALTERATION. FBC EXISTING BUILDING |
| | SECTION 501 |
| | |
| | 3) PROVIDE AREA CALCULATIONS ON THE PLANS THAT INDICATE |
| | THE AREA OF THE ADDITIONAL CONDITIONED SPACE, |
| | UNCONDITIONED SPACE AND TOTAL AREA. FBC 107.2.1 |
| | |
| | 4) FBC ENERGY CONSERVATION - SECT. 103.1.1.2 CODE |
| | COMPLIANCE CERTIFICATION. THE BUILDING'S OWNER, THE |
| | OWNER'S ARCHITECT, OR OTHER AUTHORIZED AGENT LEGALLY |
| | DESIGNATED BY THE OWNER SHALL CERTIFY THAT THE BUILDING |
| | IS IN COMPLIANCE WITH THE CODE, AS PER SECTION 553.907, |
| | FLORIDA STATUTES, PRIOR TO RECEIVING THE PERMIT TO |
| | BEGIN CONSTRUCTION OR RENOVATION. SUBMIT TWO SETS OF |
| | THE REQUIRED ENERGY COMPLIANCE FORMS. |
| | |
| | 5) GENERAL NOTE #1 ON SHEET A1.0 STATES THAT THIS SET |
| | OF DRAWINGS IS FOR INTERIOR PERMIT WORK ONLY. PLEASE |
| | CORRECT. FBC 107.2.1 |
| | |
| | 6) THE FLOOR PLAN ON A1.0 HAS SECTIONS AA, BB AND CC |
| | WITH TAGS FOR SHEET A.3. THERE WAS NO SHEET A.3 WITH |
| | THESE SECTIONS. PROVIDE THESE SECTIONS ON THE PLANS. |
| | FBC 107.2.1 |
| | |
| | 7) R401.3 DRAINAGE. SURFACE DRAINAGE SHALL BE DIVERTED |
| | TO A STORM SEWER CONVEYANCE OR OTHER APPROVED POINT OF |
| | COLLECTION THAT DOES NOT CREATE A HAZARD. LOTS SHALL BE |
| | GRADED TO DRAIN SURFACE WATER AWAY FROM FOUNDATION |
| | WALLS. THE GRADE SHALL FALL A MINIMUM OF 6 INCHES (152 |
| | MM) WITHIN THE FIRST 10 FEET (3048 MM). |
| | EXCEPTION: WHERE LOT LINES, WALLS, SLOPES OR OTHER |
| | PHYSICAL BARRIERS PROHIBIT 6 INCHES (152 MM) OF FALL |
| | WITHIN 10 FEET (3048 MM), DRAINS OR SWALES SHALL BE |
| | CONSTRUCTED TO ENSURE DRAINAGE AWAY FROM THE STRUCTURE. |
| | IMPERVIOUS SURFACES WITHIN 10 FEET (3048 MM) OF THE |
| | BUILDING FOUNDATION SHALL BE SLOPED A MINIMUM OF 2 |
| | PERCENT AWAY FROM THE BUILDING. |
| | |
| | 8) R803.2.3.1 SHEATHING FASTENINGS. WOOD STRUCTURAL |
| | PANEL SHEATHING SHALL BE FASTENED TO ROOF FRAMING WITH |
| | 8D ANNULAR RING-SHANK NAILS AT 6 INCHES (152 MM) ON |
| | CENTER AT EDGES AND 6 INCHES (152 MM) ON CENTER AT |
| | INTERMEDIATE FRAMING. WHERE ROOF FRAMING WITH A |
| | SPECIFIC GRAVITY, 0.42 > G < 0.49 IS USED, SPACING OF |
| | RING-SHANK FASTENERS SHALL BE 4 INCHES ON CENTER IN |
| | NAILING ZONE 3 IN ACCORDANCE WITH FIGURE R803.2.3.1 |
| | WHERE VULT IS 165 MPH OR GREATER. |
| | |
| | 9) R314.3.1 WHEN ALTERATIONS, REPAIRS OR ADDITIONS |
| | REQUIRING A PERMIT OCCUR, OR WHEN ONE OR MORE SLEEPING |
| | ROOMS ARE ADDED OR CREATED IN EXISTING DWELLINGS, THE |
| | INDIVIDUAL DWELLING UNIT SHALL BE EQUIPPED WITH SMOKE |
| | ALARMS LOCATED AS REQUIRED FOR NEW DWELLINGS. |
| | |
| | 10) FBC-R 315.1 PROVIDE CARBON MONOXIDE ALARMS WITHIN |
| | 10 FEET OF EACH SLEEPING ROOM. |
| | |
| | 11) ON SHEET S1.0 THE WF-12 FOOTING THAT IS SPECIFIED ( |
| | 8" DEPTH X 12" WIDE ) IS NOT ACCEPTABLE. THE SOIL |
| | REPORT REQUIRES A MINIMUM FOOTER WIDTH OF 24 INCHES AND |
| | FBC R403.1.4 REQUIRES THE EXTERIOR FOOTINGS TO BE AT |
| | LEAST 12 INCHES BELOW GRADE. FBC R404.1.6 REQUIRES |
| | CONCRETE FOUNDATIONS TO EXTEND A MINIMUM OF 4" ABOVE |
| | FINISHED GRADE AT ALL POINTS ADJACENT TO THE |
| | FOUNDATION. |
| | |
| | 12) PROVIDE A WINDOW AND DOOR SCHEDULE THAT CORRESPONDS |
| | TO THE WINDOW AND DOOR TAGS ON SHEET A1.0. FBC 107.2.1 |
| | |
| | 13) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS |
| | FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3 |
| | THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE |
| | DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT |
| | APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION |
| | INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR EACH OF |
| | THE ROOFING MATERIALS, WINDOW TYPES, EXTERIOR DOOR |
| | TYPES AND SECTIONAL GARAGE DOORS. THE ONES THAT WERE |
| | SUBMITTED FOR THE WINDOWS AND DOORS ARE EXPIRED. |
| | |
| | 14) SHOW COMPLIANCE WITH FBC - R301.2.1.2 PROTECTION OF |
| | OPENINGS. GLAZED OPENINGS IN BUILDINGS LOCATED IN |
| | WINDBORNE DEBRIS REGIONS SHALL BE PROTECTED FROM |
| | WINDBORNE DEBRIS. LARGE MISSILE IMPACT RATED WINDOWS OR |
| | HURRICANE PANELS ARE REQUIRED. |
| | |
| | 15) SHOW COMPLIANCE WITH R807.1 ATTIC ACCESS. BUILDINGS |
| | WITH COMBUSTIBLE CEILING OR ROOF CONSTRUCTION SHALL |
| | HAVE AN ATTIC ACCESS OPENING TO ATTIC AREAS THAT EXCEED |
| | 30 SQUARE FEET (2.8 M2) AND HAVE A VERTICAL HEIGHT OF |
| | 30 INCHES (762 MM) OR GREATER. THE VERTICAL HEIGHT |
| | SHALL BE MEASURED FROM THE TOP OF THE CEILING FRAMING |
| | MEMBERS TO THE UNDERSIDE OF THE ROOF FRAMING MEMBERS. |
| | |
| | 16) PROVIDE GABLE BRACING DETAIL AND GABLE OVERHANG |
| | FRAMING DETAIL. FBC-R801.2 |
| | |
| | 17) SPECIFY THE TRUSS CONNECTORS AT THE NEW CONCRETE |
| | TIE BEAM AND THE VALLEY TRUSSES TO THE EXISTING ROOF |
| | CONNECTORS. FBC R802.1.7.4 AND R802.1.7.5 |
| | |
| | 18) CLARIFY THE ROOF AT THE GARAGE. THE NORTH ELEVATION |
| | ON SHEET A2.0 SHOWS A GAP BETWEEN THE SLOPED GARAGE |
| | ROOF AND THE ROOF FRAMING PLAN ON S2.0 IS NOT CLEAR. |
| | FBC 107.2.1 |
| | |
| | 19) THE VALUE FOR THE WORK ON THE PERMIT OF $10,000.00 |
| | IS LOW. 109.3 BUILDING PERMIT VALUATIONS. IF, IN THE |
| | OPINION OF THE BUILDING OFFICIAL, THE CLAIMED VALUATION |
| | OF BUILDING, ALTERATION, STRUCTURE, ELECTRICAL, GAS, |
| | MECHANICAL OR PLUMBING SYSTEMS APPEARS TO BE |
| | UNDERESTIMATED ON THE APPLICATION, THE PERMIT SHALL BE |
| | DENIED, UNLESS THE APPLICANT CAN SHOW DETAILED, |
| | QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED CONTRACTS |
| | (EXCLUDING LAND VALUE) TO MEET THE APPROVAL OF THE |
| | BUILDING OFFICIAL. FOR PERMITTING PURPOSES, VALUATION |
| | OF BUILDINGS AND SYSTEMS SHALL BE TOTAL REPLACEMENT |
| | VALUE TO INCLUDE STRUCTURAL, ELECTRIC, PLUMBING, |
| | MECHANICAL, INTERIOR FINISH, RELATIVE SITE WORK, |
| | ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS, |
| | OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE. |
| | VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED |
| | DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES |
| | (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | PROVIDE AN ACCURATE PERMIT VALUE. |
| | |
| | 20) THE COMPONENT AND CLADDING PRESSURES ON SHEET S2.0 |
| | FOR THE ROOF AND WALL AREAS ARE NOT CORRECT. THEY |
| | SHOULD BE ADJUSTED FROM ULTIMATE TO ASD PER FBC |
| | R301.2.1.7. |
| | |
| | 21) THE VENT STACK DETAIL ON S2.0 SPECIFIES SPANISH "S" |
| | ROOF TILE AND THE ROOF DESIGN LOADS IN THE STRUCTURAL |
| | COMPUTATIONS LISTS ASPHALT SHINGLE ROOFING. CLARIFY FBC |
| | R301.1 |
| | |
| | 22) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT |
| | A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| | COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |
| | |
| | |
| | |
| | |