| Plan Review Stops For Permit 16100063 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2016-12-07 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-12-07 |
Time |
06:51 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-12-07 |
Time |
06:51 |
Sent To |
|
|
| Notes |
| 2016-12-07 06:52:35 | ****PROVISO**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | PROVISO: | | | | | | 1. A FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS | | | REQUIRED PRIOR TO C.O. | | | | | | 2. PRIOR TO INSTALLATION, SUBMIT A LETTER CLARIFYING | | | WIND DESIGN CRITERIA FOR THE ROOFTOP MECHANICAL | | | EQUIPMENT, DETAIL ON M2. THE WIND SPEED WAS PROVIDED | | | BUT EXPOSURE CLASSIFICATION WAS NOT. SEE FBC | | | 1603.1.4(3). THIS SITE REQUIRES A MINIMUM DESIGN | | | CRITERIA OF EXPOSURE C. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2016-11-30 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-11-30 |
Time |
12:12 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-11-30 |
Time |
12:12 |
Sent To |
|
|
| Notes |
| 2016-11-30 12:19:52 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | ALL BUILDING COMMENTS HAVE BEEN ADDRESSED. | | | | | | THE NEW PLAN SHOWS THAT THE PROPOSED WORK IS IN SUITES | | | 5-6, BUT THE APPLICATION IS FOR SUITE 3. PLEASE SUBMIT | | | A NEW APPLICATION THROUGH THE FRONT COUNTER; THE | | | ADDRESS FOR THE PERMIT RECORD MUST ALSO BE CHANGED. FEE | | | MAY APPLY. | | | | | | WHEN THIS IS DONE, PLEASE ADVISE AND THE PLAN REVIEW | | | WILL BE PASSED. | | | | | | THIS PERMIT WILL BE ISSUED WITH PROVISO: | | | | | | 1. A FINISHED CONSTRUCTION ELEVATION CERTIFICATE IS | | | REQUIRED PRIOR TO C.O. | | | | | | 2. PRIOR TO INSTALLATION, SUBMIT A LETTER CLARIFYING | | | WIND DESIGN CRITERIA FOR THE ROOFTOP MECHANICAL | | | EQUIPMENT, DETAIL ON M2. THE WIND SPEED WAS PROVIDED | | | BUT EXPOSURE CLASSIFICATION WAS NOT. SEE FBC | | | 1603.1.4(3). THIS SITE REQUIRES A MINIMUM DESIGN | | | CRITERIA OF EXPOSURE C. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2016-10-18 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-10-18 |
Time |
14:58 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-10-18 |
Time |
14:57 |
Sent To |
|
|
| Notes |
| 2016-10-18 14:59:09 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. PROVIDE THE PERMIT NUMBER WHICH INCLUDED POURING THE | | | FLOOR SLAB FOR THIS STRUCTURE, FBC 107. IF IT IS A PART | | | OF THIS PERMIT, REVISE PLAN TO REFLECT THIS WORK. | | | | | | 2. VALUE HAS BEEN ADJUSTED PER ICC TABLES. PAY THE | | | BALANCE OF THE PLAN REVIEW FEES PRIOR TO RESUBMITTAL, | | | FBC 109. | | | | | | 3. PLANS AND ENERGY CALCS STATE THAT THIS IS AN | | | ALTERATION. THIS BUILDING HAS NOT BEEN ISSUED A C.O. AS | | | THE PERMITTING IS PHASED. THIS IS THE SECOND PHASE | | | (FIRST OCCUPANCY) FOR THIS STRUCTURE. REVISE | | | ACCORDINGLY. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2016-12-08 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2016-12-08 |
Time |
17:59 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2016-12-08 |
Time |
17:26 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2016-10-17 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2016-10-17 |
Time |
17:00 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2016-10-17 |
Time |
14:00 |
Sent To |
|
|
| Notes |
| 2016-10-17 17:21:14 | JOB PERMIT NUMBER: 16100063 | | | JOB ADDRESS: 8170 OKEECHOBEE BLVD SUITE #3 | | | WEST PALM BEACH FLORIDA | | | DATE: OCTOBER 17, 2016 | | | ELECTRICAL PLAN REVIEW COMMENTS | | | | | | THE PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH NEC | | | 2011, (NATIONAL ELECTRICAL CODE) AND FBC 2014, (FLORIDA | | | BUILDING CODE) AS WELL AS THE CITY OF WEST PALM BEACH | | | AMENDMENTS. BELOW IS A LIST OF ITEMS NOTED. | | | | | | 1] LOW VOLTAGE SHALL BE UNDER A SEPARATE PERMIT | | | | | | 2] ADD EMERGENCY LIGHTING TO THE MEANS OF EGRESS PATH | | | INCLUDING THE EXIT DISCHARGE IN MAIN ROOM AREA, STOCK | | | PREP ROOM, AND FUTURE CLEAN ROOM. THE ILLUMINATION | | | LEVEL UNDER EMERGENCY POWER SHALL BE A MINIMUM 1' | | | CANDLE AT THE WALKING SURFACE. FBC-1006 | | | | | | 3] THE LIGHTING IN THE MECHANICAL ROOM WHERE THE | | | ELECTRICAL PANEL IS LOCATED SHALL NOT BE CONTROLLED BY | | | AUTOMATIC MEANS. NEC 110.26(D) | | | | | | 4] CLARIFY IF FUTURE CLEAN ROOM CONTAINS EXPLOSIVE | | | CHEMICALS OR ACIDS THEREFORE CLASSIFIED AS A HAZARDOUS | | | LOCATION PER NEC 500 ? | | | | | | 5] PROVIDE A LIGHTING POWER DENSITY CHART TO | | | DEMONSTRATE MAXIMUM ENERGY ALLOWANCES. SHOW COMPLIANCE | | | USING THE TOTAL BUILDING OR SPACE BY SPACE METHODS WITH | | | TRADE OFF PER FBC-E SEC C405.5. | | | | | | 6] PROVIDE VOLTAGE DROP CALCULATIONS FOR FEEDERS OF | | | PANEL A LOCATED IN SUITE #5. FEEDERS & CUSTOMER OWNED | | | SERVICE CONDUCTORS SHALL BE SIZED FOR A MAXIMUM OF 2% | | | VOLTAGE DROP. BRANCH CIRCUITS SHALL BE SIZED FOR A | | | MAXIMUM OF 3% VOLTAGE DROP. ADD TO ELECT NOTES. | | | | | | 7] ADD TO ELECT NOTES THE SOURCE OF POWER | | | IDENTIFICATION MARK AT PANELBOARD PER NEC 408.4(B) | | | | | | PLEASE REVISE YOUR DRAWINGS TO REFLECT THE ABOVE | | | MENTIONED ITEMS. WHEN RESUBMITTING, FOR A QUICKER | | | RETURN ON YOUR RE-SUBMITTAL, PROVIDE A RESPONSE LETTER | | | (NARRATIVE) ADDRESSING EACH ITEM ALONG WITH THE | | | STANDARD CITY RE-SUBMITTAL FORM. CLOUDING THE CHANGES | | | WILL BE GREATLY APPRECIATED. IF YOU HAVE FURTHER | | | QUESTIONS, PLEASE DON'T HESITATE TO CONTACT ME | | | DIRECTLY. | | | | | | FBC 2014 5TH ED. NEC 2011 | | | MARIO VALDES | | | ELECTRICAL PLAN EXAMINER | | | 561-805-6713 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2016-10-12 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2016-10-12 |
Time |
13:31 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2016-10-12 |
Time |
13:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-12-21 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-12-21 |
Time |
11:50 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-11-28 |
Time |
13:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-11-07 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-10-25 |
Time |
06:46 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-10-04 |
Time |
12:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
N |
Date |
2016-10-31 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-10-31 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-10-31 |
Time |
08:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2016-12-16 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-12-02 |
Time |
11:02 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-12-02 |
Time |
11:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2016-10-13 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-10-13 |
Time |
11:55 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-10-13 |
Time |
11:55 |
Sent To |
|
|
| Notes |
| 2016-10-13 12:13:17 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT #16100063 | | | 10/13/16 | | | | | | 1) SHEET M2: THE VENTILATION RATE FOR THE STOCK AND | | | PREPARATION ROOM SHALL BE CALCULATED AT- (10 PERSONS | | | PER 1000 SQ. FT.) AT (5 CFM PER PERSON) AND (0.18 CFMS | | | PER SQ. FT.). PLEASE CORRECT THE FRESH AIR CALCULATION. | | | | | | 2) THE FUTURE CLEAN ROOM CANNOT BE PERMITTED UNDER THIS | | | APPLICATION WITHOUT MORE SPECIFIC INFORMATION TO | | | CLARIFY THE PROCESSES THAT WILL BE CONDUCTED IN THE | | | ROOM; WHAT EQUIPMENT WILL BE IN THE ROOM, WHAT | | | MATERIALS WILL BE STORED IN THE ROOM, HOW PARTICLE | | | CONCENTRATION AND ENVIRONMENTAL CONDITIONS WILL BE | | | CONTROLLED, AND HOW CROSS-CONTAMINATION WILL BE | | | PREVENTED ETC. THE CURRENT LAYOUT PLAN SHOWS AIR | | | COMMUNICATING FROM OTHER SPACES INTO THE CLEAN ROOM AND | | | VICE-VERSA WHICH MAY BE PROHIBITED PER FDA OR OTHER | | | REGULATORY GUIDELINES. VERY TYPICALLY HEPA FILTERS ARE | | | USED FOR AIR DEVICES IN THESE TYPES OF ROOMS, HOWEVER | | | NONE HAVE BEEN SPECIFIED. PLEASE REFER TO CHAPTER 18 OF | | | THE ASHRAE HANDBOOK FOR MORE INFORMATION. | | | | | | 3) M2: THE WIND LOAD DESGIN CRITERIA FOR ATTACHING THE | | | RTU IS INCOMPLETE AND ALSO SPECIFIES AN INCORRECT WIND | | | SPEED FOR WPB. REFER TO SECTION 1609 FBC-14 BUILDING. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
1 |
Status |
P |
Date |
2016-11-30 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-11-30 |
Time |
11:27 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-11-30 |
Time |
11:27 |
Sent To |
|
|
| Notes |
| 2016-11-30 11:29:02 | PROVISO | | | | | | FINISHED CONSTRUCTION ELEVATION CERTIFICATE REQUIRED | | | PRIOR TO CO |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2016-12-21 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-12-21 |
Time |
11:49 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-12-21 |
Time |
09:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2016-10-25 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-10-25 |
Time |
14:02 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-10-25 |
Time |
14:02 |
Sent To |
|
|
| Notes |
| 2016-10-25 14:05:07 | 1ST REVIEW | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | PLUMBING COMMENTS: | | | | | | 1. SHOW CLEAR FLOOR SPACE AND HEIGHT FOR KITCHENETTE. | | | SHALL COMPLY WITH FBCACC 808/ 606.2/ 606.3 |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2016-10-25 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2016-10-25 |
Time |
09:28 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2016-10-24 |
Time |
17:00 |
Sent To |
|
|
| Notes |
|
|