Plan Review Details - Permit 16090479
| Plan Review Stops For Permit 16090479 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2016-10-18 |
|
|
Cont ID |
|
| Sent By |
tmoore |
Date |
2016-10-18 |
Time |
07:12 |
Rev Time |
0.00 |
| Received By |
tmoore |
Date |
2016-10-18 |
Time |
07:11 |
Sent To |
|
|
| Notes |
| 2016-10-18 07:12:21 | RECEIVED ALL NECESSARY DOCS AND REVIEWS. OK TO ISSUE. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2016-10-15 |
|
|
Cont ID |
|
| Sent By |
destabro |
Date |
2016-10-17 |
Time |
10:13 |
Rev Time |
0.00 |
| Received By |
tmoore |
Date |
2016-10-15 |
Time |
09:18 |
Sent To |
|
|
| Notes |
| 2016-10-15 09:23:46 | SPOKE TO AMY WALLACE OWNER/APPLICANT AND DISCUSSED WHAT | | | WAS NEEDED TO SATISFY HISTORIC PRESERVATION. SCANNED | | | AND E-MAILED A COPY OF HISTORIC COMMENTS AND THE SIGNED | | | OVERRIDE LETTER. | | | AS SOON AS SHE COMPLIES WITH THE HISTORIC PROCESS THE | | | DEMO APPLICATION CAN BE CONVERTED TO PERMIT. KEEPING ON | | | MY DESK FOR NOW. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2016-09-17 |
|
|
Cont ID |
|
| Sent By |
tmoore |
Date |
2016-09-17 |
Time |
10:31 |
Rev Time |
0.00 |
| Received By |
tmoore |
Date |
2016-09-17 |
Time |
10:31 |
Sent To |
ENG |
|
| Notes |
| 2016-09-17 10:31:21 | APPLICATION WAS SUBMITTED WITHOUT ANY UTILITY | | | DISCONNECT CONFIRMATIONS. TO ISSUE PERMIT WE WILL NEED | | | THE FOLLOWING, | | | | | | 1) RELEASE CONFIRMATION FROM F.P.L. (ELEC) | | | | | | 2) RELEASE CONFIRMATION FROM F.P.U. (GAS) | | | | | | 3) CONFIRMATION FROM THE UTILITIES DEPT. THAT THE WATER | | | METER HAS BEEN REMOVED AND THE SEWER LATERAL LOCATED. | | | (I HAVE FAXED THE REQUEST FOR YOU.) | | | | | | 4) A SEWER LATERAL CAPPING PERMIT PULLED BY A PLUMBING | | | CONTRACTOR, A TURN AROUND PERMIT, THE LATERAL CAPPED, | | | AND THE FINAL INSPECTION CALLED FOR AND PASSED. | | | | | | 5) A COPY OF A RODENT LETTER PROVIDED BY A PEST CONTROL | | | COMPANY THAT THE PROPERTY HAS BEEN INSPECTED FOR | | | RODENTS AND NONE FOUND, OR FOUND AND TREATED FOR. | | | | | | 6) THE DEBRIS DISPOSAL FORM FILLED OUT. THIS CAN BE | | | DONE AT PERMIT PICK UP, (A SMALL FEE IS ASSOCIATED WITH | | | THIS FORM.) | | | | | | 7 A COPY OF THE N.O.C. FROM THE CONTRACTOR DUE TO THE | | | VALUE BEING OVER $2499.00. | | | | | | 8) HISTORIC AND ENGINEERING'S REVIEW STOP SIGN OFF. (IF | | | AN OVERRIDE LETTER IS REQUIRED BY HISTORIC, ONE WILL BE | | | PROVIDED.) | | | | | | FEEL FREE TO CALL WITH ANY QUESTIONS. TOM AT | | | 561-805-6669 |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2016-10-13 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
2016-10-13 |
Time |
09:58 |
Rev Time |
0.00 |
| Received By |
mgonzale |
Date |
2016-10-13 |
Time |
09:58 |
Sent To |
|
|
| Notes |
| 2016-10-13 09:59:10 | MUNICODE 94-450 WILL BE IN FORCE. POLLUTION PREVENTION | | | METHODS WILL APPLY. | | | | | | MANUEL JULIAN GONZALEZ | | | ENGINEERING PROJECT COORDINATOR | | | PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS | | | /FORMS,-PERMITS-APPLICATIONS | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-10-17 |
|
|
Cont ID |
|
| Sent By |
destabro |
Date |
2016-10-13 |
Time |
14:46 |
Rev Time |
0.00 |
| Received By |
destabro |
Date |
2016-10-17 |
Time |
10:12 |
Sent To |
B |
|
| Notes |
| 2016-10-17 10:13:05 | 10/17/2016 - HPB DEMOLITION OVERRIDE LETTER INCLUDED - | | | 9/24 ISSUE. DLE | | 2016-10-13 14:49:35 | 10/13/16 - CONTRIBUTING PROPERTY TO THE OLD NORTHWOOD | | | HISTORIC DISTRICT. ALTHOUGH DAMAGED BY FIRE AND DEEMED | | | IRREPARABLE, APPLICANT MUST SUBMIT COA WITH INTENT TO | | | REBUILD SFH ON-SITE. DEMOLITION MAY BE CONDITIONALLY | | | APPROVED BEFORE HPB REVIEW OF NEW INFILL DESIGN, BUT | | | THE COA PROCESS MUST BE INITIATED. DLE |
|
|
|