Plan Review Details - Permit 16081063
Plan Review Stops For Permit 16081063
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2016-09-14 Cont ID  
Sent By skennedy Date 2016-09-14 Time 11:20 Rev Time 0.00
Received By skennedy Date 2016-09-14 Time 11:20 Sent To  
Notes
2016-09-14 11:24:03SPOKE TO GAS DESIGNERR, ROUGH INSPECTION GAS PASSES
 WITH EXCEPTION OF STUD GUARDS OR OTHER PROTECTION.
 CONTRACTOR/DESIGNER HAS AGREED TO SUPPLY A REVISED GAS
 DRAWING TO INSPECTOR IF REQUESTED. THE FLAT LINE
 DRAWING HAS BEEN ADDED TO FILE COPY. SAK

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-08-27 Cont ID  
Sent By tklarge Date 2016-08-27 Time 03:59 Rev Time 0.00
Received By tklarge Date 2016-08-26 Time 06:29 Sent To  
Notes
2016-08-27 02:54:34 
  
 1) THE GAS RISER HAS BEEN DONE IN AN ERASABLE FORMAT (
 PENCIL? ) AND IS UNACCEPTABLE. SUBMIT 2 COPIES OF THE
 GAS RISER IN AN ACCEPTABLE FORMAT. WPB AMEND. TO FBC
 SEC. 107..1, 107.2.1.
 2) THE LOCATION OF THE GAS METER AND SOME NOTES HAVE
 BEEN CUT OFF OF THE GAS RISER DRAWING. SUBMIT 2 COPIES
 OF THE GAS RISER DIAGRAM THAT CLEARLY SHOWS THE NOTES
 AND THE LOCATION OF THE METER.
 3) SHOW THE CORRESPONDING EHD NUMBER OF THE 1 INCH CSST
 SUPPLYING THE COOKTOP. COMPLY WITH 2014 FGC TABLES
 402.4 (15), 402.4 (16) OR 402.4 (17).
 4) THE GAS RISER SHOWS A DISTANCE OF 50 FEET(?) FROM
 THE METER TO THE 2ND STAGE REGULATOR BUT THE PLAN VIEW
 SHOWS 40 FEET. CLARIFY.
 5) SIZE THE BRANCH LINES TO THE POOL HEATER AND TO THE
 TANKLESS WATER HEATER . COMPLY WITH 2014 FGC SEC.402.3.
 6) SHOW THE LOCATION OF ANY WINDOWS OR DOORS ON THE
 PLAN VIEW DRAWING IN RELATION TO THE LOCATION OF THE
 TANKLESS WATER HEATER. SOFFIT VENTS SHALL ALSO BE TAKEN
 INTO CONSIDERATION. THE LOCATION OF THE TANKLESS WATER
 HEATER SHALL COMPLY WITH THE MANUFACTURER'S
 INSTALLATION INSTRUCTIONS AND THE FGC SEC.503. SUBMIT
 TWO COPIES OF THE PAGES FROM THE MANUFACTURER'S
 INSTALLATION MANUAL THAT SHOWS THE HEATER LOCATION
 REQUIREMENTS. IF THERE IS A DIFFERENCE BETWEEN THE CODE
 AND THE INSTALLATION MANUAL, THE MOST RESTRICTIVE SHALL
 APPLY.WPB AMEND. TO FBC SEC.102.1.
 7) SUBMIT TWO COPIES OF THE MANUFACTURER'S
 SPECIFICATIONS FOR THE TANKLESS WATER HEATER AND THE
 COOKTOP. THE APPLIANCES SHALL BE LISTED AND LABELED PER
 THE FGC SEC. 301.3, WPB AMEND. TO FBC SEC. 107.2.1.
 8) SIZE THE SECTION OF GALVANIZED PIPE BETWEEN THE 2ND
 STAGE REGULATOR AND THE TANKLESS WATER HEATER.
 9) MANUF. SPECIFICATION SHEETS FOR THE REGULATORS SHALL
 BE ONSITE FOR INSPECTION.
  
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 PLUMBING PLAN REVIEW
 561-805-6692
 [email protected]
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-08-27 Cont ID  
Sent By tklarge Date 2016-08-27 Time 03:59 Rev Time 0.00
Received By tklarge Date 2016-08-25 Time 11:47 Sent To  
Notes
2016-08-25 11:47:09REVISION ROUTED TO TKLARGE

Review Stop P PLUMBING
Rev No 2 Status N Date 2016-09-14 Cont ID  
Sent By skennedy Date 2016-09-14 Time 11:19 Rev Time 0.00
Received By skennedy Date 2016-09-14 Time 11:19 Sent To  
Notes
2016-09-14 11:21:28PLUMBING REVIEWED UNDER 16080680

Review Stop P PLUMBING
Rev No 1 Status P Date 2016-08-27 Cont ID  
Sent By tklarge Date 2016-08-27 Time 03:59 Rev Time 0.00
Received By tklarge Date 2016-08-27 Time 03:59 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved