Plan Review Details - Permit 16080990
Plan Review Stops For Permit 16080990
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-12-13 Cont ID  
Sent By mgonzale Date 2016-12-13 Time   Rev Time 1.00
Received By mgonzale Date 2016-12-13 Time   Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-12-13 Cont ID  
Sent By spalmer Date 2016-12-13 Time 11:25 Rev Time 0.00
Received By spalmer Date 2016-08-23 Time 09:55 Sent To  
Notes
2016-08-24 09:55:38ROUTED TO ZONING

Review Stop Z ZONING
Rev No 2 Status P Date 2016-12-13 Cont ID  
Sent By njwira Date 2016-12-13 Time 11:17 Rev Time 0.00
Received By njwira Date 2016-12-13 Time 11:17 Sent To I
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2016-08-26 Cont ID  
Sent By njwira Date 2016-08-26 Time 16:42 Rev Time 0.00
Received By njwira Date 2016-08-24 Time 13:43 Sent To ENG
Notes
2016-08-26 16:44:458/26/16- FAILED
  
 94-482(A) FAILS TO MEET THE 75% OR 1000SQFT.
 REQUIREMENT FOR LANDSCAPING.
 FIGURE XV-1 DRIVEWAY IS 40FT. WHICH EXCEEDS THE 20FT
 MAXIMUM
  
 PASS
  
 NO TREES BEING REMOVED
 18FT. MEETS THE 5FT. RADIUS REQUIRED
 3FT. SIDE SETBACK MET
  
 PLEASE CONTACT
 NATHAN WIRA
 [email protected]
 (561)822-1442
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved