Plan Review Details - Permit 16080734
Plan Review Stops For Permit 16080734
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-09-09 Cont ID  
Sent By Mgonzale Date 2016-09-09 Time   Rev Time 1.00
Received By mgonzale Date 2016-09-09 Time   Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-09-09 Cont ID  
Sent By andrian Date 2016-09-09 Time 16:08 Rev Time 0.00
Received By andrian Date 2016-08-17 Time 13:38 Sent To Z
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2016-09-09 Cont ID  
Sent By andrian Date 2016-09-09 Time 16:09 Rev Time 0.00
Received By njwira Date 2016-09-09 Time 15:49 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2016-08-23 Cont ID  
Sent By njwira Date 2016-08-23 Time 11:55 Rev Time 0.00
Received By njwira Date 2016-08-19 Time 16:35 Sent To ENG
Notes
2016-08-23 12:10:318/23/16- FAILED
  
 RESIDENTIAL DRIVEWAY LESS THAN 3 UNITS
  
 FAILED
 1. LANDSCAPING MUST COVER 75% OR 1,000SQFT. IN THE
 FRONT 25FT. SETBACK. 94-482(A)
 2. DRIVEWAY EXCEEDS THE 20FT. MAXIMUM CURB CUT. FIGURE
 XV-1
  
 PASSED
  
 1. NO TREES ARE BEING REMOVED
 2. 3FT. SIDE SETBACK FIGURE XV-1 MET
 3. 5FT. RADIUS MET WITH A 6FT RADIUS
  
 PLEASE CONTACT
 NATHAN WIRA
 [email protected]
 (561)822-1442
  
  