|
 |
 |
 |
 |
 |
Plan Review Details - Permit 16080655
| Plan Review Stops For Permit 16080655 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2016-08-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-08-19 |
Time |
10:49 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-08-19 |
Time |
10:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2016-08-17 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-08-17 |
Time |
11:18 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-08-16 |
Time |
19:03 |
Sent To |
|
|
| Notes |
| 2016-08-17 11:18:14 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | SECTIONS G & H - TECTUM DECK | | | | | | 1) SPECIFY THE APPROVED ASSEMBLY AND ITS MAXIMUM DESIGN | | | PRESSURE FROM THE ONES THAT ARE LISTED IN NOA NO. | | | 14-0626.04 THAT WILL BE USED. FBC 107.2.1 | | | NOTE: THE NOA REFERS TO RAS 117 FOR INSULATION | | | ATTACHMENT. RAS 117 SECTION 12.6.1 BONDED ROOF | | | ASSEMBLIES MAY BE TESTED IN ACCORDANCE WITH TAS 124 TO | | | VERIFY ATTACHMENT IN THE ELEVATED PRESSURE ZONES. | | | | | | SECTIONS C, D, E, F & H - STEEL DECK | | | | | | 1) SPECIFY WHICH ONE OF THE FASTENING OPTIONS ON PAGE | | | 16 OF NOA NO.14-0626.02 WILL BE USED. FBC 107.2.1 | | | | | | 2) SUBMIT TWO SETS OF SIGNED AND SEALED RAS 117 AND/OR | | | RAS 137 CALCULATIONS FOR ENHANCED FASTENING IN THE | | | PERIMETER AND CORNER AREAS AS REQUIRED BY LIMITATION | | | NUMBER 7 ON PAGE 24 OF NOA NO.14-0626.02. | | | | | | 3) SUBMIT TWO SETS OF FIELD WITHDRAWAL TESTING AND | | | SIGNED & SEALED CALCULATIONS AS REQUIRED BY STEEL DECK | | | LIMITATIONS NUMBER 1 ON PAGE 23 OF NOA NO.14-0626.02. | | | ALL TESTING AND FASTENING DESIGN SHALL BE IN COMPLIANCE | | | WITH TAS 105 AND RAS 137. | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
P |
Date |
2016-08-19 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-08-19 |
Time |
10:49 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-08-19 |
Time |
10:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-08-17 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-08-17 |
Time |
11:18 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-08-16 |
Time |
14:25 |
Sent To |
|
|
| Notes |
| 2016-08-16 14:25:38 | RMCDOUGAL |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |