Plan Review Details - Permit 16080487
Plan Review Stops For Permit 16080487
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-08-22 Cont ID  
Sent By mgonzale Date 2016-08-22 Time   Rev Time  
Received By mgonzale Date 2016-08-22 Time   Sent To M
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-08-16 Cont ID  
Sent By pleduc Date 2016-08-16 Time   Rev Time 0.00
Received By pleduc Date 2016-08-16 Time 13:41 Sent To M
Notes
2016-08-16 14:37:48THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
 1) PLEASE ENSURE THAT THE FIRE LINE MANUFACTURE'S SPECS
 ARE ON SITE FOR THE FIRE INSPECTORS REVIEW FOR THE FIRE
 INSPECTION. CLOSE ATTENTION SHALL BE OBSERVED FOR THE
 PROPER TORQUEING OF RESTRAINT BOLTS.
  
 NFPA 24
  
 10.7 REQUIREMENT FOR LAYING PIPE.
 10.7.1 PIPES, VALVES, HYDRANTS, GASKETS, AND FITTINGS
 SHALL BE INSPECTED FOR DAMAGE WHEN RECEIVED AND SHALL
 BE INSPECTED PRIOR TO INSTALLATION. (SEE FIGURE
 10.10.1.)
 10.7.2 THE TORQUING OF BOLTED JOINTS SHALL BE CHECKED.
  
 2) DO NOT COVER THE FIRE LINE PRIOR TO THE FIRE
 INSPECTION.
  
 10.3.5 PIPE JOINT ASSEMBLY.
 10.3.5.1 JOINTS SHALL BE ASSEMBLED BY PERSONS FAMILIAR
 WITH THE PARTICULAR MATERIALS BEING USED AND IN
 ACCORDANCE WITH THE MANUFACTURER?S INSTRUCTIONS AND
 SPECIFICATIONS.
 10.3.5.2 ALL BOLTED JOINT ACCESSORIES SHALL BE CLEANED
 AND THOROUGHLY COATED WITH ASPHALT OR OTHER
 CORROSION-RETARDING MATERIAL AFTER INSTALLATION.
  
 10.10.2.2.4* THE TRENCH SHALL BE BACKFILLED BETWEEN
 JOINTS BEFORE TESTING TO PREVENT MOVEMENT OF PIPE.
  
 3) TEST THE FIRE LINE PER NFPA 24.
  
 10.10 TESTING AND ACCEPTANCE.
 10.10.1 APPROVAL OF UNDERGROUND PIPING. THE INSTALLING
 CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
 (1) NOTIFYING THE AUTHORITY HAVING JURISDICTION AND THE
 OWNER?S REPRESENTATIVE OF THE TIME AND DATE TESTING IS
 TO BE PERFORMED
 (2) PERFORMING ALL REQUIRED ACCEPTANCE TESTS
 (3) COMPLETING AND SIGNING THE CONTRACTOR?S MATERIAL
 AND TEST CERTIFICATE(S) SHOWN IN FIGURE 10.10.1.
  
 10.10.2.2 HYDROSTATIC TEST.
 10.10.2.2.1* ALL PIPING AND ATTACHED APPURTENANCES
 SUBJECTED TO SYSTEM WORKING PRESSURE SHALL BE
 HYDROSTATICALLY TESTED AT 200 PSI (13.8 BAR) OR 50 PSI
 (3.5 BAR) IN EXCESS OF THE SYSTEM WORKING PRESSURE,
 WHICHEVER IS GREATER, AND SHALL MAINTAIN THAT PRESSURE
 AT ?5 PSI (0.35 BAR) FOR 2 HOURS.
 10.10.2.2.2 PRESSURE LOSS SHALL BE DETERMINED BY A DROP
 IN GAUGE PRESSURE OR VISUAL LEAKAGE.
 10.10.2.2.3 THE TEST PRESSURE SHALL BE READ FROM ONE OF
 THE FOLLOWING, LOCATED AT THE LOWEST ELEVATION OF THE
 SYSTEM OR THE PORTION OF THE SYSTEM BEING TESTED:
 (1) A GAUGE LOCATED AT ONE OF THE HYDRANT OUTLETS
 (2) A GAUGE LOCATED AT THE LOWEST POINT WHERE NO
 HYDRANTS ARE PROVIDED
 10.10.2.2.4* THE TRENCH SHALL BE BACKFILLED BETWEEN
 JOINTS BEFORE TESTING TO PREVENT MOVEMENT OF PIPE.
  
  
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-08-24 Cont ID  
Sent By hmoser Date 2016-08-24 Time 10:57 Rev Time 0.00
Received By hmoser Date 2016-08-11 Time 10:06 Sent To  
Notes
2016-08-12 10:07:07ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2016-08-24 Cont ID  
Sent By hmoser Date 2016-08-24 Time 10:56 Rev Time 0.00
Received By hmoser Date 2016-08-24 Time 10:35 Sent To  
Notes
***NONE***