Plan Review Details - Permit 16080372
Plan Review Stops For Permit 16080372
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-08-14 Cont ID  
Sent By tklarge Date 2016-08-14 Time 03:20 Rev Time 0.00
Received By tklarge Date 2016-08-14 Time 03:16 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-08-11 Cont ID  
Sent By tklarge Date 2016-08-11 Time 03:52 Rev Time 0.00
Received By tklarge Date 2016-08-11 Time 03:41 Sent To  
Notes
2016-08-11 03:52:231) THE PERMIT APPLICATION STATES THAT THE SHOWER HEAD
 IS BEING RELOCATED AND THE SHOWER VALVE IS BEING
 REPLACED. THIS WILL REQUIRE THE REMOVAL OF SOME TILE
 AND BACKING BOARD. SUBMIT TWO COPIES OF A FLOOR PLAN
 SHOWING THE AREAS WHERE THE BACKING BOARD AND TILE WILL
 BE REPLACED AND THE APPROXIMATE SQUARE FOOTAGE OF EACH
 BEING REPLACED. WPB AMEND. TO FBC SEC. 107.2.1. NOTE -
 THE FLOOR PLAN CAN BE HAND DRAWN.
 2) BACKING BOARD BEING INSTALLED IN WET AREAS SHALL
 COMPLY WITH 2014 FBCR SECS.R702.3.8, R702.3.8.1,
 R702.4.2.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-08-14 Cont ID  
Sent By tklarge Date 2016-08-14 Time 03:20 Rev Time 0.00
Received By tklarge Date 2016-08-12 Time 16:14 Sent To  
Notes
2016-08-12 16:14:32RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-08-11 Cont ID  
Sent By tklarge Date 2016-08-11 Time 03:52 Rev Time 0.00
Received By tklarge Date 2016-08-09 Time 11:38 Sent To  
Notes
2016-08-10 11:38:30ROUTED TO PLUMBING INBOX

Review Stop P PLUMBING
Rev No 1 Status P Date 2016-08-11 Cont ID  
Sent By tklarge Date 2016-08-11 Time 03:41 Rev Time 0.00
Received By tklarge Date 2016-08-11 Time 03:37 Sent To  
Notes
***NONE***