| 2016-08-11 14:28:38 | REVIEW 2014 5TH FBC ED. NEC 2011 |
| | MARIO VALDES |
| | ELECTRICAL PLAN EXAMINER |
| | 561-805-6713 |
| | [email protected] |
| | |
| | |
| | - CLARIFY NEC STANDARD BEING USED WERE CURRENTLY IN |
| | 2011 VERSION. ADD A NOTE |
| | |
| | - PROVIDE A COMPLETE ONE-LINE DIAGRAM SHOWING HOW THE |
| | INTERCONNECTION IS BEING MADE TO THE ELECTRICAL |
| | DISTRUBUTION SYSTEM. IF ITS BEING TAPPED OFF THE SUPPLY |
| | SIDE OF THE SERVICE PLEASE REFLECT WHAT TYPE OF |
| | ENCLOSURE, HOW THE CONNECTION IS MECHANICALLY BEING |
| | TAPPED AS FAR AS WITH UL LISTED LUGS, POLARIS OR ANY |
| | OTHER METHOD ACCEPTABLE AND SERVICE EQUIPMENT SHALL BE |
| | SUITABLE TO HANDLE AVALIABLE FAULT CURRENTS AND SHORT |
| | CIRCUIT RATINGS . IF ITS BEING TAPPED OF THE LOAD SIDE |
| | REFLECT COMPLIANCE WITH PANEL BOARD BUS RATING |
| | LIMITATIONS, FEEDER TAP RULES, AND CICUIT BREAKERS MUST |
| | BE SUITABLE FOR BACKFEEDING IF NOT MARKED LINE & LOAD. |
| | NEC 215.5 & NEC 705.12 |
| | |
| | - PROVIDE MANUFACTURE SPECS OF SOLAR MODULES, ARRAY |
| | GROUNDING AND BONDING FITTINGS, AND INVERTER. FBC 107 |
| | |
| | - FBC 107 BUILDING PLANS SHALL BE DRWAN TO A MINIMUM |
| | 1/8'' SCALE FOR THE QUALITY OF REVIEW. |
| | |
| | - THE SITE PLANS TO INCLUDE A DIRECTORY FOR AC & PV |
| | DISCONNECTING MEANS AT THE SERVICE DENOTING ALL |
| | LOCATIONS IN THE BUILDING.NEC 690.4(H) MULTIPLE |
| | INVERTERS. |
| | |
| | - PER FAC RULE 61G-15.021. A SEPERATE ELECTRICAL PERMIT |
| | BY A LICENSED ELECTRICAL CONTRACTOR IS REQUIRED FOR THE |
| | CONNECTION TO THE PREMISES INTERGAL WIRING OR UTILITY |
| | SERVICE. SOLAR CONTRACTORS ( CVC ) ARE LIMITED TO |
| | CONTROL WIRING IN PV SOURCE CIRCUIT, PV OUTPUT CIRCUIT, |
| | AND THE PV SUPPLY SIDE OF THE POWER CONDITIONING UNIT. |