Plan Review Details - Permit 16070163
| Plan Review Stops For Permit 16070163 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
N |
Date |
2016-07-13 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2016-07-13 |
Time |
12:35 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2016-07-13 |
Time |
12:35 |
Sent To |
|
|
| Notes |
| 2016-07-13 12:36:43 | EXEMPT PER FBC 102.2 (D) IN PLACE LESS THAN 180 DAYS. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2016-07-18 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-07-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-07-18 |
Time |
15:09 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-07-18 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-07-18 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-07-06 |
Time |
11:11 |
Sent To |
|
|
| Notes |
| 2016-07-07 11:11:55 | ROUTED TO ZONING |
|
|
| Review Stop |
NFIP |
NFIP REVIEW ACTIVITY |
| Rev No |
1 |
Status |
F |
Date |
2016-08-18 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-08-18 |
Time |
16:32 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-08-18 |
Time |
16:32 |
Sent To |
|
|
| Notes |
| 2016-08-18 16:45:51 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. REVISE SITE PLAN TO INCLUDE THE FOLLOWING, PER CRS | | | REQUIREMENT RA3 (SENT TO CONTRACTOR VIA EMAIL): | | | | | | A. THE SITE PLAN'S SCALE AND NORTH ORIENTATION ARROW; | | | B. THE PARCEL BOUNDAIRES AND THE LOCATION AND NAMES OF | | | ADJACENT STREETS; | | | C. N/A (NO WATERCOURSES LOCATED ON PARCEL) | | | D. ALL FLOODPLAIN BOUNDARIES THAT RUN THROUGH THE | | | PARCEL; | | | E. N/A | | | F. ALL DRAINAGE AND UTILITY EASEMENTS; | | | G. ALL AREAS TO BE CLEARED, CUT, GRADED, OR FILLED; AND | | | H. THE LOCATOIN OF THE PROPOSED STRUCTURE. | | | | | | 2. REVISE SITE PLAN TO INCLUDE: | | | A. THE FOOTPRINT OF ALL EXISTING AND PROPOSED BUILDINGS | | | AND BUILDING ADDITIONS | | | B. PROVIDE THE ELEVATION OF THE PROPOSED FINISHED FLOOR | | | | | | 3. THE FIRST INSPECTION FOR RA3 IS NOT APPLICABLE TO | | | THIS PROJECT. | | | | | | 4. THE SECOND INSPECTION IS CONDUCTED WHEN THE LOWEST | | | FLOOR IS BUILT. THE SURVEYED LOWEST FLOOR ELEVATION IS | | | REQUIRED. THIS IS REQUIRED PRIOR TO SETTING THE | | | TRAILER. | | | IF YOU HAVE TOPOS AVAILABLE AND THIS TEMPORARY | | | STRUCTURE IS BEING SET DIRECTLY ON THE GROUND, AND WILL | | | BE SET AT 7.5' NGVD29 OR ABOVE, THE TOPOS ARE | | | SUFFICIENT. | | | | | | 5. THE THIRD INSPECTION IS CONDUCTED WHEN THE PROJECT | | | IS FINISHED. A "FINISHED CONSTRUCTION" ELEVATION | | | CERTIFICATE IS REQUIRED. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2016-07-15 |
|
|
Cont ID |
|
| Sent By |
jroach |
Date |
2016-07-15 |
Time |
13:54 |
Rev Time |
0.00 |
| Received By |
jroach |
Date |
2016-07-15 |
Time |
13:54 |
Sent To |
FIRE |
|
| Notes |
| 2016-07-15 13:54:46 | PROVISO | | | | | | ALL CONSTRUCTION TRAILERS SHALL BE REMOVED WITHIN SEVEN | | | DAYS OF THE FINAL CONSTRUCTION INSPECTION BY THE CITY | | | AND PRIOR TO THE ISSUANCE OF A CERTIFICATE OF | | | OCCUPANCY. | | | | | | | | | QUESTIONS/COMMENTS, CONTACT | | | JOHN ROACH, PRINCIPAL PLANNER, AT | | | [email protected] OR (561) 822-1448. | | | | | 2016-07-08 09:38:33 | 7/8/16 | | | | | | SENT TO JOHN ROACH |
|
|
|