| Plan Review Stops For Permit 16070145 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2016-08-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-08-26 |
Time |
16:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-08-26 |
Time |
16:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2016-08-15 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-08-15 |
Time |
07:15 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-08-15 |
Time |
07:15 |
Sent To |
|
|
| Notes |
| 2016-08-15 07:15:23 | PLAN | | | REVIEW COMMENTS | | | | | | 2ND REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT POOL EQUIPMENT WIND LOAD RESISTANCE ANCHORING | | | DETAILS. FBC 107.2.1.3 AND FBCR4501.22 THIS COMMENT HAS | | | NOT BEEN ADEQUATELY ADDRESSED. THE DRAWING THAT WAS | | | SUBMITTED DOES NOT HAVE THE ENGINEER'S ORIGINAL | | | HANDWRITTEN SIGNATURE AND DOES NOT HAVE THE ADDRESS OF | | | THIS JOB. THE INFORMATION THAT IS SUBMITTED NEEDS TO BE | | | SPECIFIC TO THIS JOB. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2016-07-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-07-25 |
Time |
18:06 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-07-25 |
Time |
17:56 |
Sent To |
|
|
| Notes |
| 2016-07-25 18:21:16 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT POOL EQUIPMENT WIND LOAD RESISTANCE ANCHORING | | | DETAILS. FBC 107.2.1.3 AND FBCR4501.22 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-07-13 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2016-07-13 |
Time |
10:13 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2016-07-13 |
Time |
09:54 |
Sent To |
|
|
| Notes |
| 2016-07-13 10:14:23 | REVIEW 2014 5TH FBC ED. NEC 2011 | | | MARIO VALDES | | | ELECTRICAL PLAN EXAMINER | | | 561-805-6713 | | | [email protected] | | | | | | | | | PASSED WITH THE FOLLOWING PROVISO | | | | | | - BOND POOL WATER IN ACCORDANCE WITH NEC 680.26(C) |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2016-07-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-07-14 |
Time |
06:14 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-07-14 |
Time |
06:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2016-08-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-08-26 |
Time |
16:27 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-08-24 |
Time |
11:00 |
Sent To |
|
|
| Notes |
| 2016-08-25 11:00:45 | RESUB ROUTED TO RMCDOUGAL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-08-25 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2016-08-15 |
Time |
11:00 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2016-08-12 |
Time |
16:19 |
Sent To |
|
|
| Notes |
| 2016-08-12 16:19:33 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-07-25 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-07-25 |
Time |
18:06 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-07-06 |
Time |
13:53 |
Sent To |
|
|
| Notes |
| 2016-07-06 13:53:21 | ROUTED TO ZONING |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2016-08-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-08-14 |
Time |
03:36 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-08-14 |
Time |
03:22 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2016-07-14 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-07-14 |
Time |
06:15 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-07-14 |
Time |
06:01 |
Sent To |
|
|
| Notes |
| 2016-07-14 06:23:36 | 1) SUPPLY TWO COPIES OF THE MANUFACTURER'S | | | SPECIFFICATIONS FOR THE POOL PUMP INCLUDING THE PUMP | | | CURVE. WPB AMEND. TO 2014 FBC SEC.107.2.1, 2014 | | | FBC-RESIDENTIAL SEC. R4501.7.2. | | | 2) SUBMIT MANUFACTURER'S SPECS FOR THE MAIN DRAIN FOR | | | THE POOL & SPA. WPB AMEND. TO 2014 FBC SEC.107.2.1, | | | 2014 FBCR SEC.R4501.6.6,R4501.6.3. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2016-07-07 |
|
|
Cont ID |
|
| Sent By |
njwira |
Date |
2016-07-07 |
Time |
15:09 |
Rev Time |
0.00 |
| Received By |
njwira |
Date |
2016-07-07 |
Time |
15:09 |
Sent To |
|
|
| Notes |
| 2016-07-08 09:06:24 | POOL BOX | | 2016-07-07 15:17:48 | 7/7/16- PASSED | | | | | | 1. POOL EQUIPMENT IS NOT LOCATED WITHIN A SETBACK. | | | 2. SIDE SETBACK IS 8.67FT. REQUIRED SETBACK IS 5FT. | | | 3. REAR SETBACK IS 59.33FT. REQUIRES 5FT | | | 6. NO TREES BEING REMOVED. | | | | | | PLEASE CONTACT: | | | NATHAN WIRA | | | (561)822-1442 | | | [email protected] | | | |
|
|