| 2016-08-10 17:38:29 | PLAN |
| | REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC FIFTH EDITION (2014) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. |
| | ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND |
| | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF |
| | THE PERSON RESPONSIBLE FOR THE DESIGN. |
| | |
| | 2) THE PRODUCT APPROVAL NOAS FOR THE WOOD CONNECTORS |
| | (NOA NO 02-0402.01) AND TAPCON CONCRETE ANCHORS (NOA NO |
| | 11-0616.05) ARE EXPIRED. SUBMIT CURRENT ONES. DCA RULE |
| | 9N-3 |
| | |
| | 3) THE PRODUCT APPROVALS (FL 18582.4) FOR THE THREE |
| | SINGLE OUTSWING DOORS INDICATE THAT THEY ARE NOT RATED |
| | FOR LARGE MISSILE IMPACT PROTECTION AND ARE REQUIRED TO |
| | HAVE SHUTTERS. |
| | FBC - R 301.2.1.2 SUBMIT TWO COPIES OF AN INSTALLATION |
| | SCHEDULE AND KEY PLAN FOR THE STORM PANELS. SPECIFY THE |
| | OPENING SIZE, THE WIND PRESSURES, TYPE OF ANCHOR, |
| | ANCHOR SPACING, EDGE DISTANCE, PANEL LENGTH, PANEL |
| | SPAN, SEPARATION DISTANCE FROM PANEL TO GLASS AND THE |
| | APPLICABLE SECTION NUMBER FROM THE INSTALLATION |
| | DRAWINGS. I HAVE INCLUDED A LINK TO THE CONSTRUCTION |
| | SERVICES DEPARTMENT SITE THAT HAS MANY OF THE RELATED |
| | FORMS INCLUDING THE SCHEDULE FOR INSTALLATION OF |
| | OPENING PROTECTIVE DEVICES. |
| | HTTP://WPB.ORG/DEVELOPMENT/FORMS-AND-PUBLICATIONS/ |
| | |
| | 4) THERE IS A NOTE ON THE WINDOW INFILL DETAIL THAT |
| | REFERS TO DETAIL 1 ON S-2 FOR INTERIOR AND EXTERIOR |
| | FINISHES. PROVIDE THIS INFORMATION AND SPECIFY THE WALL |
| | INSULATION. FBC 107.2.1 |
| | |
| | 5) THE WOOD SHEATHING AT WINDOW INFILL IS REQUIRED TO |
| | BE COVERED WITH A WATER-RESISTIVE BARRIER. AN |
| | INDEPENDENT LAYER IS REQUIRED TO FORM A BOND BREAK |
| | BETWEEN THE STUCCO AND THE WATER BARRIER IN ACCORDANCE |
| | WITH FBCR 703.6.3. |
| | |
| | 6) GENERAL AFTER THE FACT PERMITS. PLEASE BE ADVISED |
| | THE INSPECTOR MAY REQUIRE PREVIOUSLY COMPLETED WORK TO |
| | BE MADE ACCESSIBLE AND OPEN FOR INSPECTION OR REQUIRE |
| | ADDITIONAL DOCUMENTATION FOR ALL CONCEALED WORK |
| | PREVIOUSLY COMPLETED PURSUANT TO FBC 110 & FBC 117. |
| | |
| | |
| | |
| | |
| | |
| | |