Plan Review Stops For Permit 16070001
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-12-15 Cont ID  
Sent By rmcdouga Date 2016-12-15 Time 08:54 Rev Time 0.00
Received By rmcdouga Date 2016-12-14 Time 18:24 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-08-11 Cont ID  
Sent By rmcdouga Date 2016-08-11 Time 13:31 Rev Time 0.00
Received By rmcdouga Date 2016-08-10 Time 14:56 Sent To  
Notes
2016-08-10 17:38:29PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS.
 ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND
 ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF
 THE PERSON RESPONSIBLE FOR THE DESIGN.
  
 2) THE PRODUCT APPROVAL NOAS FOR THE WOOD CONNECTORS
 (NOA NO 02-0402.01) AND TAPCON CONCRETE ANCHORS (NOA NO
 11-0616.05) ARE EXPIRED. SUBMIT CURRENT ONES. DCA RULE
 9N-3
  
 3) THE PRODUCT APPROVALS (FL 18582.4) FOR THE THREE
 SINGLE OUTSWING DOORS INDICATE THAT THEY ARE NOT RATED
 FOR LARGE MISSILE IMPACT PROTECTION AND ARE REQUIRED TO
 HAVE SHUTTERS.
 FBC - R 301.2.1.2 SUBMIT TWO COPIES OF AN INSTALLATION
 SCHEDULE AND KEY PLAN FOR THE STORM PANELS. SPECIFY THE
 OPENING SIZE, THE WIND PRESSURES, TYPE OF ANCHOR,
 ANCHOR SPACING, EDGE DISTANCE, PANEL LENGTH, PANEL
 SPAN, SEPARATION DISTANCE FROM PANEL TO GLASS AND THE
 APPLICABLE SECTION NUMBER FROM THE INSTALLATION
 DRAWINGS. I HAVE INCLUDED A LINK TO THE CONSTRUCTION
 SERVICES DEPARTMENT SITE THAT HAS MANY OF THE RELATED
 FORMS INCLUDING THE SCHEDULE FOR INSTALLATION OF
 OPENING PROTECTIVE DEVICES.
 HTTP://WPB.ORG/DEVELOPMENT/FORMS-AND-PUBLICATIONS/
  
 4) THERE IS A NOTE ON THE WINDOW INFILL DETAIL THAT
 REFERS TO DETAIL 1 ON S-2 FOR INTERIOR AND EXTERIOR
 FINISHES. PROVIDE THIS INFORMATION AND SPECIFY THE WALL
 INSULATION. FBC 107.2.1
  
 5) THE WOOD SHEATHING AT WINDOW INFILL IS REQUIRED TO
 BE COVERED WITH A WATER-RESISTIVE BARRIER. AN
 INDEPENDENT LAYER IS REQUIRED TO FORM A BOND BREAK
 BETWEEN THE STUCCO AND THE WATER BARRIER IN ACCORDANCE
 WITH FBCR 703.6.3.
  
 6) GENERAL AFTER THE FACT PERMITS. PLEASE BE ADVISED
 THE INSPECTOR MAY REQUIRE PREVIOUSLY COMPLETED WORK TO
 BE MADE ACCESSIBLE AND OPEN FOR INSPECTION OR REQUIRE
 ADDITIONAL DOCUMENTATION FOR ALL CONCEALED WORK
 PREVIOUSLY COMPLETED PURSUANT TO FBC 110 & FBC 117.
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-07-14 Cont ID  
Sent By albarran Date 2016-07-14 Time 18:25 Rev Time 0.00
Received By albarran Date 2016-07-14 Time 18:16 Sent To  
Notes
2016-07-14 18:32:28APPROVED ELECTRICAL REVIEW AND MADE NOTE OF COMPLIANCE
 WITH NEC 210.63/FBC-ER3901.12

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-12-15 Cont ID  
Sent By rmcdouga Date 2016-12-15 Time 09:02 Rev Time 0.00
Received By rmcdouga Date 2016-12-09 Time 11:37 Sent To  
Notes
2016-12-12 11:37:29RESUB ROUTED TO RMCDOUGAL

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-08-11 Cont ID  
Sent By rmcdouga Date 2016-08-11 Time 13:39 Rev Time 0.00
Received By rmcdouga Date 2016-07-01 Time 11:07 Sent To  
Notes
2016-07-01 11:07:49R04

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2016-12-15 Cont ID  
Sent By rmcdouga Date 2016-12-14 Time 18:59 Rev Time 0.00
Received By rmcdouga Date 2016-12-14 Time 18:24 Sent To  
Notes
2016-12-15 09:40:10MECHANICAL PROVISO
 PROVIDE ANCHORING DETAILS FOR THE RELOCATED A/C
 CONDENSING UNIT TO THE FIELD INSPECTOR. FBCR-M1307

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-08-10 Cont ID  
Sent By rmcdouga Date 2016-08-10 Time 16:54 Rev Time 0.00
Received By rmcdouga Date 2016-08-10 Time 16:54 Sent To  
Notes
2016-08-10 17:09:02PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY MECHANICAL
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) A MECHANICAL PERMIT IS REQUIRED TO RELOCATE THE A/C
 CONDENSER. FBC 105.1
  
 2) SPECIFY THE EXISTING LOCATION OF THE A/C CONDENSER
 PRIOR TO BEING LOCATED. FBC 107.2.1
  
 3) PROVIDE A DETAIL OF THE CONDENSER PAD WITH ANCHORING
 DETAILS. FBCR M1401.4 AND M1305.1.4.1

Review Stop P PLUMBING
Rev No 1 Status P Date 2016-07-28 Cont ID  
Sent By tklarge Date 2016-07-28 Time 15:18 Rev Time 0.00
Received By tklarge Date 2016-07-28 Time 14:13 Sent To  
Notes
2016-07-28 15:19:33REPLACE FIXTURES IN EXISTING LOCATIONS.
 SEPARATE PERMIT REQD.FOR GAS.