| 2016-07-01 14:38:22 | BUILDING PLAN REVIEW |
| | 2014 FLORIDA BUILDING CODE |
| | |
| | CHRISTOPHER S. THROOP, C.B.O. |
| | BUILDING PLANS EXAMINER ? PX3169 |
| | CONSTRUCTION SERVICES DIVISION |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | TEL: 561-805-6726 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | 1ST REVIEW |
| | ACTION: DENIED |
| | DATE: 7/1/16 |
| | |
| | 1. PROVIDE SHUTTER SCHEDULE WITH WIND LOAD |
| | CALCULATIONS. |
| | 2. CANNOT VERIFY IF VALUE IS APPROPRIATE. |
| | |
| | FBC 107.3.5.3 - PROVIDE WIND DESIGN LOADS/DESIGN |
| | PRESSURES PURSUANT TO FBC-R301.2. |
| | 1603.1.4 WIND DESIGN DATA. |
| | THE FOLLOWING INFORMATION RELATED TO WIND LOADS SHALL |
| | BE SHOWN, REGARDLESS OF WHETHER WIND LOADS GOVERN THE |
| | DESIGN OF THE LATERAL FORCE-RESISTING SYSTEM OF THE |
| | STRUCTURE: |
| | 1. ULTIMATE DESIGN WIND SPEED, VULT, (3-SECOND GUST), |
| | MILES PER HOUR (KM/HR) AND NOMINAL DESIGN WIND SPEED, |
| | VASD, AS DETERMINED IN ACCORDANCE WITH SECTION |
| | 1609.3.1. |
| | 2. RISK CATEGORY. |
| | 3. WIND EXPOSURE. APPLICABLE WIND DIRECTION IF MORE |
| | THAN ONE WIND EXPOSURE IS UTILIZED. |
| | 4. APPLICABLE INTERNAL PRESSURE COEFFICIENT. |
| | 5. DESIGN WIND PRESSURES TO BE USED FOR EXTERIOR |
| | COMPONENT AND CLADDING MATERIALS NOT SPECIFICALLY |
| | DESIGNED BY THE REGISTERED DESIGN PROFESSIONAL |
| | RESPONSIBLE FOR THE DESIGN OF THE STRUCTURE, PSF (KN/ |
| | M2). |
| | |
| | FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE |
| | TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | FAILURE TO PROVIDE DOCUMENTATION OF ESTIMATED COSTS MAY |
| | DELAY THE APPLICATION PROCESS. |
| | |
| | |
| | |