Plan Review Details - Permit 16061526
Plan Review Stops For Permit 16061526
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-09-12 Cont ID  
Sent By skennedy Date 2016-09-12 Time 12:00 Rev Time 0.00
Received By skennedy Date 2016-09-12 Time 12:00 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-07-05 Cont ID  
Sent By aclange Date 2016-07-05 Time 16:10 Rev Time 0.00
Received By aclange Date 2016-07-05 Time 16:10 Sent To  
Notes
2016-07-05 16:21:33****CORRECTIONS****
  
 ART LANGE - BUILDING INSPECTOR
 561-805-6667 [email protected]
 FBC FLORIDA BUILDING CODE 2014 5TH EDITION/ FRC FLORIDA
 RESIDENTIAL CODE 2015 5TH EDITION
  
 1. REVISE PERMITTED VALUE TO INCLUDE THE NEW SCOPE OF
 WORK.
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL,
 ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH,
 RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES,
 MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY
 LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST
 PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS
 SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 2. SUBMIT A DOOR SCHEDULE AND INCLUDE THE SIZES OF THE
 OPENINGS. INCLUDE A WIND DESIGN SCHEDULE COMPLYING WITH
 ASCE-7-10 FOR WIND LOADS.
  
 3. IMPACT PROTECTION. PROVIDE PRODUCT APPROVALS AND
 COMPLETE THE SAMPLE INSTALLATION SCHEDULE (AVAILABLE IN
 THE LOBBY AND AT HTTP://WWW.CITYOFWPB.COM/CONSTRUCTION/
 PDF/SCHEDULE_FOR_INSTALLATION.PDF)
  
 NOTE: THERE IS A STOP WORK NOTICE FOR FENCING WITHOUT A
 PERMIT. IF THIS IS SOMETHING THAT YOU WILL BE WORKING
 ON A SEPERATE PERMIT WILL BE REQUIRED. FBC 105.1
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-07-05 Cont ID  
Sent By aclange Date 2016-07-05 Time 16:21 Rev Time 0.00
Received By aclange Date 2016-06-28 Time 09:48 Sent To  
Notes
2016-06-29 09:48:50TLARGE'S DESK

Review Stop P PLUMBING
Rev No 2 Status P Date 2016-09-12 Cont ID  
Sent By skennedy Date 2016-09-12 Time 12:00 Rev Time 0.00
Received By skennedy Date 2016-09-12 Time 12:00 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-06-29 Cont ID  
Sent By tklarge Date 2016-06-29 Time 14:52 Rev Time 0.00
Received By tklarge Date 2016-06-29 Time 14:40 Sent To  
Notes
2016-06-29 14:52:321) SUBMIT A FLOOR PLAN THAT SHOWS THE LOCATION OF THE
 WATER HEATERS TO BE REPLACED.WPB AMEND. TO FBC
 SEC.107.2.1.
 2) INDICATE ON THE FLOORPLAN IF THE WATER HEATERS ARE
 ELECTRIC OR GAS.IF GAS, THE APPLIANCE SHALL BE LISTED
 AND LABELED. 2014 FGC SEC.301.3.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved