| Plan Review Stops For Permit 16061354 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2016-09-19 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-09-19 |
Time |
08:29 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-09-19 |
Time |
08:29 |
Sent To |
|
|
| Notes |
| 2016-09-19 08:30:44 | COURTESY REVIEW DONE AND APPROVED, WILL NEED TO REMOVE | | | VOIDED SHEETS FROM SETS |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2016-07-15 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-07-15 |
Time |
08:13 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-07-15 |
Time |
08:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2016-07-02 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-07-02 |
Time |
08:06 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-07-02 |
Time |
08:06 |
Sent To |
|
|
| Notes |
| 2016-07-02 08:09:53 | INITIAL ELECTRICAL PLAN REVIEW | | | | | | APPLICABLE CODES IN EFFECT: | | | FLORIDA BUILDING CODE 2014 5TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH | | | EDITION | | | NFPA 70- 2011 NEC | | | COMMENTS: | | | | | | 1. PLEASE CLARIFY SCOPE OF WORK AS TO ELECTRICAL. SHOW | | | ALL ELECTRICAL RELATED TO THE INSTALLATION OF NEW HOOD. | | | EXAMPLE , ANY ELECTRICAL UNDER HOOD TO SHUNT. ENSUL | | | SYSTEM TO BE INSTALLED. FEEDS TO EXHAUST FANS ETC? | | | 2. PLEASE FEEL FREE TO CONTACT ME SHOULD YOU HAVE ANY | | | QUESTIONS REGARDING THIS PROJECT. | | | | | | | | | VALENTINO PEREZ | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6717 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2016-09-20 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-09-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-09-20 |
Time |
12:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2016-07-20 |
|
|
Cont ID |
|
| Sent By |
rlindow |
Date |
2016-07-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
rlindow |
Date |
2016-07-20 |
Time |
|
Sent To |
|
|
| Notes |
| 2016-07-20 16:57:29 | | | | 6/29/2016 LINDOW | | | | | | PROVISO: | | | SHALL MEET ALL REQUIREMENTS FOR NFPA 96, 2011 EDITION. | | | SEPARATE FIRE SUPRESSION PERMIT AND PLANS REQUIRED. | | | ALL WORK SUBJECT TO FIELD INSPECTION. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2016-06-29 |
|
|
Cont ID |
|
| Sent By |
rlindow |
Date |
2016-06-29 |
Time |
|
Rev Time |
0.00 |
| Received By |
rlindow |
Date |
2016-06-29 |
Time |
|
Sent To |
M |
|
| Notes |
| 2016-06-29 08:09:33 | | | | | | | 6/29/2016 LINDOW | | | | | | PROVISO: | | | SHALL MEET ALL REQUIREMENTS FOR NFPA 96, 2011 EDITION. | | | SEPARATE FIRE SUPRESSION PERMIT AND PLANS REQUIRED. | | | ALL WORK SUBJECT TO FIELD INSPECTION. |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
P |
Date |
2017-01-07 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-01-07 |
Time |
07:28 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2017-01-07 |
Time |
06:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2016-08-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-08-02 |
Time |
06:14 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-08-02 |
Time |
05:43 |
Sent To |
|
|
| Notes |
| 2016-08-02 06:14:19 | 1) SHOW ON THE PLANS HOW THE REQUIREMENTS FOR | | | COMBUSTION AIR FOR THE GAS APPLIANCES WILL BE MET PER | | | 2014 FGC SEC.304.1, 304.5.1. YOU HAVE SHOWN ON THE | | | PLANS HOW MUCH COMBUSTION AIR IS REQUIRED ( 133 CFM) | | | BUT YOU HAVE NOT SHOWN HOW IT IS GOING TO BE SUPPLIED. | | | WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) IF THE REQUIREMENTS FOR COMBUSTION AIR WILL BE | | | PROVIDED BY THE BUILDING'S MECHANICAL VENTILATION | | | SYSTEM, THE SYSTEM SHALL PROVIDE THE SPECIFIED | | | COMBUSTION AIR RATE IN ADDITION TO THE REQUIRED | | | VENTILATION AIR PER THE 2014 FBC-FUEL GAS SEC. 304.9.3. | | | 3) WHERE ALL COMBUSTION AIR IS PROVIDED BY A MECHANICAL | | | AIR SUPPLY SYSTEM, THE SYSTEM SHALL COMPLY WITH 2014 | | | FBC-FUEL GAS SECS.304.9, 304.9.1, 304.9.2. | | | 4) SUBMIT DOCUMENTATION FOR THE GAS EQUIPMENT THAT | | | SHOWS THE EQUIPMENT IS LISTED AND LABELED PER THE 2014 | | | FBC-FUEL GAS SEC. 301.3. | | | 5) THE NOTE ON THE GAS RISER CALLS OUT THE TOTAL RUN AS | | | ONE-HUNDRED FEET BUT THE MEASUREMENTS ON THE GAS RISER | | | ADD UP TO 120 FEET. CLARIFY. | | | 6) SIZE THE SECTIONS OF PIPE DOWNSTREAM OF THE AUTO | | | SHUTOFF VALVE AND THE LINE SUPPLYING THE APPLIANCES. IS | | | IT ALSO ONE INCH? CLARIFY. | | | 7) THERE ARE TWO SHEETS LABELED "P". VOID THE OLD | | | SHEET. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2016-06-30 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-06-30 |
Time |
16:38 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-06-30 |
Time |
16:38 |
Sent To |
|
|
| Notes |
| 2016-06-30 16:51:07 | 1ST REVIEW | | | | | | | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | | | | GAS COMMENTS: | | | | | | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL | | | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER | | | FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. | | | | | | 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE | | | FBC-2014 FUEL GAS CODE SEC. 304. | | | | | | 3. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL | | | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA | | | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 | | | | | | 4. THE LONGEST RUN SCALED OUT TO 116FT WHICH MAKES THE | | | 11/2 GAS PIPING TO SMALL PLEASE CLARIFY TOUR LONGEST | | | RUN OF 60FT PER WPB AMEND. TO FBC 107.2.1 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
2017-09-05 |
Time |
|
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-08-31 |
Time |
11:11 |
Sent To |
|
|
| Notes |
| 2017-09-01 11:12:02 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2017-01-24 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-01-24 |
Time |
17:09 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-01-19 |
Time |
14:51 |
Sent To |
|
|
| Notes |
| 2017-01-20 14:51:16 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2017-01-07 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2017-01-07 |
Time |
07:28 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-09-14 |
Time |
12:50 |
Sent To |
|
|
| Notes |
| 2017-01-05 08:24:19 | 1/5 TO TL/GJ | | | | | 2016-09-15 12:51:09 | B31 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-08-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-08-02 |
Time |
06:14 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-07-13 |
Time |
16:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-07-02 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-07-02 |
Time |
08:10 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-07-02 |
Time |
08:09 |
Sent To |
|
|
| Notes |
| 2016-06-24 12:30:42 | ROUTED TO FIRE INBOX |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
5 |
Status |
P |
Date |
2017-09-05 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-09-05 |
Time |
12:50 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-09-05 |
Time |
12:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
F |
Date |
2017-01-24 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-01-24 |
Time |
16:44 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-01-24 |
Time |
16:44 |
Sent To |
|
|
| Notes |
| 2017-01-24 17:09:27 | 4TH REVIEW FBC-2014 MECHANICAL | | | PERMIT #16061354 | | | 1/24/17 | | | | | | 1) THERE APPEARS TO BE A CONFLICT IN THE PLANS | | | REGARDING THE MAKEUP AIR SYSTEM FOR THE HOOD EXHAUST. | | | BOTH A STRAIGHT SUPPLY FAN AND TWO 5-TON 100% O/A | | | SYSTEMS ARE SHOWN PROVIDING MAKEUP AIR TO THE HOOD: | | | PLEASE CLARIFY WHICH SYSTEM IS TO BE USED. | | | | | | 2) PROVIDE HOOD HANGING DETAILS. | | | | | | 3) ALTHOUGH GLASS IS NOT A COMBUSTIBLE MATERIAL, PLEASE | | | PROVIDE SUFFICIENT CLEARANCE FROM THE HOOD TO THE GLASS | | | PER THE UL LISTING AND MANUFACTURER'S SPECIFICATIONS.- | | | SECTION 304.1 | | | | | | 4) PLEASE REMOVE THE VOIDED PAGES FROM THE PLAN SETS | | | AND RETAIN THEM IN THE FILE FOR REFERENCE. | | | | | | 5) PLEASE ASSEMBLE THE M2 AND M3 PLAN SHEETS SO THEY | | | CAN BE REVIEWED ENTIRELY. CURRENTLY, THE LEFT MARGINS | | | ARE CUT-OFF. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2016-09-21 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-09-21 |
Time |
08:12 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-09-21 |
Time |
08:12 |
Sent To |
|
|
| Notes |
| 2016-09-21 08:14:09 | 3RD REVIEW FBC-2014 MECHANICAL | | | PERMIT #16061354 | | | 9/21/16 | | | | | | 1) REFER TO COMMENT #8 FROM THE 1ST REVIEW AND PROVIDE | | | COMPLETE ENGINEERING FOR INSTALLATION OF THE ROOFTOP | | | MECHANICAL EQUIPMENT INCLUDING: A) DETAILS FOR MOUNTING | | | AND ANCHORING THE ROOF FANS AND FAN CURBS. B) DETAILS | | | FOR ROOFTOP FASTENING AND ANCHORING THE MUA DUCTWORK | | | AND SUPPORT BRACES. | | | | | | 2) REFER TO COMMENT #11 FROM THE 1ST REVIEW AND PROVIDE | | | CALCULATIONS FOR SIZING THE MUA UNIT. | | | | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME. | | | | | | THANK YOU, | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2016-07-22 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-07-22 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-07-22 |
Time |
14:48 |
Sent To |
|
|
| Notes |
| 2016-07-22 15:16:18 | 2ND REVIEW MECHANICAL | | | PERMIT #16061354 | | | 7/22/16 | | | | | | 1) THE REQUESTED EQUIPMENT SCHEDULES FOR THE EXHAUST | | | AND MAKEUP AIR FANS HAVE NOT BEEN PLACED ON THE PLANS. | | | | | | 2) THE REQUESTED AIR VELOCITY CALCULATION WAS PERFORMED | | | USING A 9 X 29" DUCT, HOWEVER THE GREASE EXHAUST DUCT | | | SIZE IS INDICATED TO BE 16 X 16". | | | | | | 3) A 2" CLEARANCE FOR THE HOOD TO THE FRONT EXTERIOR | | | WALL IS SHOWN, HOWEVER AN 18" CLEARANCE TO COMBUSTIBLES | | | IS REQUIRED. PLEASE SEE SECTION 507.9 AND EXCEPTION, | | | AND LABEL THE WALL AS EITHER COMBUSTIBLE OR | | | NON-COMBUSTIBLE AND INDICATE WHAT THE WALL MATERIALS | | | ARE. | | | | | | 4) M-1: IT APPEARS THAT THE ROOF FANS ARE WITHIN 10' TO | | | THE ROOF EDGE WHICH REQUIRES GUARDS TO BE INSTALLED PER | | | SECTION 304.11- REVISE THE PLAN ACCORDINGLY. | | | | | | 5) COMMENTS #8, 9, 11, & 12 FROM THE 1ST REVIEW STILL | | | EXIST. I AM REPRINTING THOSE COMMENTS BELOW. PLEASE | | | SUBMIT CORRECTED PLANS ACCOMPANIED BY A RESPONSE | | | NARRATIVRE FROM THE DESIGN PROFESSIONAL. | | | | | | 1ST REVIEW: FBC 2014 MECHANICAL | | | PERMIT #16061354 | | | 6/30/16 | | | | | | 8) PROVIDE WIND LOAD ENGINEERING FOR ANCHORING OF THE | | | FANS AND CURBS TO THE ROOF STRUCTURE- SECTION 301.15. | | | PLEASE INCLUDE NOA'S FOR THE ROOF FANS WITH A SHOP | | | DRAWING APPROVAL SIGNATURE BY THE ENGINEER OF RECORD. | | | | | | 9) PROVIDE A HOOD HANGING DETAIL. | | | | | | 11) REFER TO SECTION 508.1.1 AND SHOW COMPLIANCE FOR | | | MAKEUP AIR TEMPERATURE: THE TEMPERATURE DIFFERENTIAL | | | BETWEEN MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE | | | SHALL NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT | | | WHERE THE ADDED HEATING AND COOLING LOADS OF THE MAKEUP | | | AIR DO NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM. | | | | | | 12) PROVIDE AN AIR BALANCE CALCULATION. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2016-06-30 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-06-30 |
Time |
13:56 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-06-30 |
Time |
13:56 |
Sent To |
|
|
| Notes |
| 2016-06-30 14:32:00 | 1ST REVIEW: FBC 2014 MECHANICAL | | | PERMIT #16061354 | | | 6/30/16 | | | | | | 1) THE M PLAN HAS A MIAMI BEACH ADDRESS ON IT- PLEASE | | | CORRECT. | | | | | | 2) PROVIDE EQUIPMENT SCHEDULES FOR THE EXHAUST AND | | | MAKEUP AIR FANS. | | | | | | 3) PROVIDE AN AIR VELOCITY CALCULATION FOR THE EXHAUST | | | DUCT- SECTION 506.3.4. | | | | | | 4) REFER TO SECTION 507.9 AND INDICATE THE REQUIRED | | | CLEARANCES FOR THE GREASE HOOD INCLUDING WHERE IT IS | | | SHOWN BUTTING UP TO THE FRONT EXTERIOR WALL- SECTION | | | 507.9. | | | | | | 5) SHOW THE VERTICAL DISTANCE FROM THE THE LOWER LIP OF | | | THE HOOD AND TO THE TOP HORIZONTAL SURFACE OF THE | | | APPLIANCE- SECTION 507.12. | | | | | | 6) PROVIDE A FRONT VIEW DRAWING OF THE HOOD THAT SHOWS | | | THE GREASE EXHAUST AND MAKEUP AIR DUCT RUNS, AND | | | INCLUDES THE TYPE AND SIZE OF DUCT, AND THE REQUIRED | | | CLEARANCES TO COMBUSTIBLES- SEE SECTION 506.3.11. | | | PLEASE SEE SECTION 506.3.11.2 FOR FIELD APPLIED GREASE | | | ENCLOSURES AND INDICATE THE MAKE AND MODEL OF THE DUCT | | | WRAP ON THE PLAN AND SUBMIT MANUFACTURER'S | | | SPECIFICATIONS, | | | | | | 7) PROVIDE A ROOF PLAN SHOWING THE REQUIRED CLEARANCE | | | DISTANCE FROM THE EXHAUST AND MAKE UP AIR FANS TO THE | | | ROOF EDGES- SECTION 304.11 | | | | | | 8) PROVIDE WIND LOAD ENGINEERING FOR ANCHORING OF THE | | | FANS AND CURBS TO THE ROOF STRUCTURE- SECTION 301.15. | | | PLEASE INCLUDE NOA'S FOR THE ROOF FANS WITH A SHOP | | | DRAWING APPROVAL SIGNATURE BY THE ENGINEER OF RECORD. | | | | | | 9) PROVIDE A HOOD HANGING DETAIL. | | | | | | 10) REFER TO SECTION 507.11 AND SHOW THE LOCATIONS OF | | | AND PROVIDE DETAILS FOR REQUIRED GREASE FILTERS. PLEASE | | | NOTE THAT THE FILTERS SHALL BE LISTED AND LABELED IN | | | ACCORDANCE WITH UL 1046. | | | | | | 11) REFER TO SECTION 508.1.1 AND SHOW COMPLIANCE FOR | | | MAKEUP AIR TEMPERATURE: THE TEMPERATURE DIFFERENTIAL | | | BETWEEN MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE | | | SHALL NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT | | | WHERE THE ADDED HEATING AND COOLING LOADS OF THE MAKEUP | | | AIR DO NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM. | | | | | | 12) PROVIDE AN AIR BALANCE CALCULATION. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
N |
Date |
2016-08-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-08-02 |
Time |
05:42 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-08-02 |
Time |
04:32 |
Sent To |
|
|
| Notes |
| 2016-08-02 05:43:25 | NO PLUMBING ON THIS PERMIT, ONLY GAS. TKL. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2016-07-01 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-07-01 |
Time |
14:57 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-07-01 |
Time |
14:57 |
Sent To |
|
|
| Notes |
| 2016-07-01 15:34:05 | 1ST REVIEW | | | | | | | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | | | | PLUMBING COMMENTS: | | | | | | 1. IT IS UNCLEAR IF THERE IS ANY PLUMBING WORK BEING | | | DONE OFF THESE PLANS IT REFERENCES PLUMBING SUB PERMITS | | | UNDER SCOPE OF WORK PLEASE CLARIFY. PER WPB AMEND. TO | | | FBC SEC. 107.2.1 |
|
|