Plan Review Details - Permit 16061354
Plan Review Stops For Permit 16061354
Review Stop E ELECTRICAL
Rev No 3 Status P Date 2016-09-19 Cont ID  
Sent By vperez Date 2016-09-19 Time 08:29 Rev Time 0.00
Received By vperez Date 2016-09-19 Time 08:29 Sent To  
Notes
2016-09-19 08:30:44COURTESY REVIEW DONE AND APPROVED, WILL NEED TO REMOVE
 VOIDED SHEETS FROM SETS

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-07-15 Cont ID  
Sent By vperez Date 2016-07-15 Time 08:13 Rev Time 0.00
Received By vperez Date 2016-07-15 Time 08:13 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-07-02 Cont ID  
Sent By vperez Date 2016-07-02 Time 08:06 Rev Time 0.00
Received By vperez Date 2016-07-02 Time 08:06 Sent To  
Notes
2016-07-02 08:09:53INITIAL ELECTRICAL PLAN REVIEW
  
 APPLICABLE CODES IN EFFECT:
 FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH
 EDITION
 NFPA 70- 2011 NEC
 COMMENTS:
  
 1. PLEASE CLARIFY SCOPE OF WORK AS TO ELECTRICAL. SHOW
 ALL ELECTRICAL RELATED TO THE INSTALLATION OF NEW HOOD.
 EXAMPLE , ANY ELECTRICAL UNDER HOOD TO SHUNT. ENSUL
 SYSTEM TO BE INSTALLED. FEEDS TO EXHAUST FANS ETC?
 2. PLEASE FEEL FREE TO CONTACT ME SHOULD YOU HAVE ANY
 QUESTIONS REGARDING THIS PROJECT.
  
  
 VALENTINO PEREZ
 ELECTRICAL PLANS EXAMINER II
 561-805-6717
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2016-09-20 Cont ID  
Sent By pleduc Date 2016-09-20 Time   Rev Time 0.00
Received By pleduc Date 2016-09-20 Time 12:20 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2016-07-20 Cont ID  
Sent By rlindow Date 2016-07-20 Time   Rev Time 0.00
Received By rlindow Date 2016-07-20 Time   Sent To  
Notes
2016-07-20 16:57:29 
 6/29/2016 LINDOW
  
 PROVISO:
 SHALL MEET ALL REQUIREMENTS FOR NFPA 96, 2011 EDITION.
 SEPARATE FIRE SUPRESSION PERMIT AND PLANS REQUIRED.
 ALL WORK SUBJECT TO FIELD INSPECTION.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-06-29 Cont ID  
Sent By rlindow Date 2016-06-29 Time   Rev Time 0.00
Received By rlindow Date 2016-06-29 Time   Sent To M
Notes
2016-06-29 08:09:33 
  
 6/29/2016 LINDOW
  
 PROVISO:
 SHALL MEET ALL REQUIREMENTS FOR NFPA 96, 2011 EDITION.
 SEPARATE FIRE SUPRESSION PERMIT AND PLANS REQUIRED.
 ALL WORK SUBJECT TO FIELD INSPECTION.

Review Stop G GAS REVIEW
Rev No 3 Status P Date 2017-01-07 Cont ID  
Sent By tklarge Date 2017-01-07 Time 07:28 Rev Time 0.00
Received By tklarge Date 2017-01-07 Time 06:05 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2016-08-02 Cont ID  
Sent By tklarge Date 2016-08-02 Time 06:14 Rev Time 0.00
Received By tklarge Date 2016-08-02 Time 05:43 Sent To  
Notes
2016-08-02 06:14:191) SHOW ON THE PLANS HOW THE REQUIREMENTS FOR
 COMBUSTION AIR FOR THE GAS APPLIANCES WILL BE MET PER
 2014 FGC SEC.304.1, 304.5.1. YOU HAVE SHOWN ON THE
 PLANS HOW MUCH COMBUSTION AIR IS REQUIRED ( 133 CFM)
 BUT YOU HAVE NOT SHOWN HOW IT IS GOING TO BE SUPPLIED.
 WPB AMEND. TO FBC SEC. 107.2.1.
 2) IF THE REQUIREMENTS FOR COMBUSTION AIR WILL BE
 PROVIDED BY THE BUILDING'S MECHANICAL VENTILATION
 SYSTEM, THE SYSTEM SHALL PROVIDE THE SPECIFIED
 COMBUSTION AIR RATE IN ADDITION TO THE REQUIRED
 VENTILATION AIR PER THE 2014 FBC-FUEL GAS SEC. 304.9.3.
 3) WHERE ALL COMBUSTION AIR IS PROVIDED BY A MECHANICAL
 AIR SUPPLY SYSTEM, THE SYSTEM SHALL COMPLY WITH 2014
 FBC-FUEL GAS SECS.304.9, 304.9.1, 304.9.2.
 4) SUBMIT DOCUMENTATION FOR THE GAS EQUIPMENT THAT
 SHOWS THE EQUIPMENT IS LISTED AND LABELED PER THE 2014
 FBC-FUEL GAS SEC. 301.3.
 5) THE NOTE ON THE GAS RISER CALLS OUT THE TOTAL RUN AS
 ONE-HUNDRED FEET BUT THE MEASUREMENTS ON THE GAS RISER
 ADD UP TO 120 FEET. CLARIFY.
 6) SIZE THE SECTIONS OF PIPE DOWNSTREAM OF THE AUTO
 SHUTOFF VALVE AND THE LINE SUPPLYING THE APPLIANCES. IS
 IT ALSO ONE INCH? CLARIFY.
 7) THERE ARE TWO SHEETS LABELED "P". VOID THE OLD
 SHEET.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-06-30 Cont ID  
Sent By gjohnson Date 2016-06-30 Time 16:38 Rev Time 0.00
Received By gjohnson Date 2016-06-30 Time 16:38 Sent To  
Notes
2016-06-30 16:51:071ST REVIEW
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
  
 GAS COMMENTS:
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL
 CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER
 FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2.
  
 2. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE
 FBC-2014 FUEL GAS CODE SEC. 304.
  
 3. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL
 GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2
  
 4. THE LONGEST RUN SCALED OUT TO 116FT WHICH MAKES THE
 11/2 GAS PIPING TO SMALL PLEASE CLARIFY TOUR LONGEST
 RUN OF 60FT PER WPB AMEND. TO FBC 107.2.1

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date   Cont ID  
Sent By   Date 2017-09-05 Time   Rev Time 0.00
Received By lmarchan Date 2017-08-31 Time 11:11 Sent To  
Notes
2017-09-01 11:12:02RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2017-01-24 Cont ID  
Sent By ccole Date 2017-01-24 Time 17:09 Rev Time 0.00
Received By ccole Date 2017-01-19 Time 14:51 Sent To  
Notes
2017-01-20 14:51:16RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-01-07 Cont ID  
Sent By tklarge Date 2017-01-07 Time 07:28 Rev Time 0.00
Received By tklarge Date 2016-09-14 Time 12:50 Sent To  
Notes
2017-01-05 08:24:191/5 TO TL/GJ
  
2016-09-15 12:51:09B31

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-08-02 Cont ID  
Sent By tklarge Date 2016-08-02 Time 06:14 Rev Time 0.00
Received By tklarge Date 2016-07-13 Time 16:14 Sent To  
Notes
2016-07-13 16:14:16B36

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-07-02 Cont ID  
Sent By vperez Date 2016-07-02 Time 08:10 Rev Time 0.00
Received By vperez Date 2016-07-02 Time 08:09 Sent To  
Notes
2016-06-24 12:30:42ROUTED TO FIRE INBOX

Review Stop M MECHANICAL (A/C)
Rev No 5 Status P Date 2017-09-05 Cont ID  
Sent By ccole Date 2017-09-05 Time 12:50 Rev Time 0.00
Received By ccole Date 2017-09-05 Time 12:23 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 4 Status F Date 2017-01-24 Cont ID  
Sent By ccole Date 2017-01-24 Time 16:44 Rev Time 0.00
Received By ccole Date 2017-01-24 Time 16:44 Sent To  
Notes
2017-01-24 17:09:274TH REVIEW FBC-2014 MECHANICAL
 PERMIT #16061354
 1/24/17
  
 1) THERE APPEARS TO BE A CONFLICT IN THE PLANS
 REGARDING THE MAKEUP AIR SYSTEM FOR THE HOOD EXHAUST.
 BOTH A STRAIGHT SUPPLY FAN AND TWO 5-TON 100% O/A
 SYSTEMS ARE SHOWN PROVIDING MAKEUP AIR TO THE HOOD:
 PLEASE CLARIFY WHICH SYSTEM IS TO BE USED.
  
 2) PROVIDE HOOD HANGING DETAILS.
  
 3) ALTHOUGH GLASS IS NOT A COMBUSTIBLE MATERIAL, PLEASE
 PROVIDE SUFFICIENT CLEARANCE FROM THE HOOD TO THE GLASS
 PER THE UL LISTING AND MANUFACTURER'S SPECIFICATIONS.-
 SECTION 304.1
  
 4) PLEASE REMOVE THE VOIDED PAGES FROM THE PLAN SETS
 AND RETAIN THEM IN THE FILE FOR REFERENCE.
  
 5) PLEASE ASSEMBLE THE M2 AND M3 PLAN SHEETS SO THEY
 CAN BE REVIEWED ENTIRELY. CURRENTLY, THE LEFT MARGINS
 ARE CUT-OFF.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2016-09-21 Cont ID  
Sent By ccole Date 2016-09-21 Time 08:12 Rev Time 0.00
Received By ccole Date 2016-09-21 Time 08:12 Sent To  
Notes
2016-09-21 08:14:093RD REVIEW FBC-2014 MECHANICAL
 PERMIT #16061354
 9/21/16
  
 1) REFER TO COMMENT #8 FROM THE 1ST REVIEW AND PROVIDE
 COMPLETE ENGINEERING FOR INSTALLATION OF THE ROOFTOP
 MECHANICAL EQUIPMENT INCLUDING: A) DETAILS FOR MOUNTING
 AND ANCHORING THE ROOF FANS AND FAN CURBS. B) DETAILS
 FOR ROOFTOP FASTENING AND ANCHORING THE MUA DUCTWORK
 AND SUPPORT BRACES.
  
 2) REFER TO COMMENT #11 FROM THE 1ST REVIEW AND PROVIDE
 CALCULATIONS FOR SIZING THE MUA UNIT.
  
 IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME.
  
 THANK YOU,
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2016-07-22 Cont ID  
Sent By ccole Date 2016-07-22 Time 14:48 Rev Time 0.00
Received By ccole Date 2016-07-22 Time 14:48 Sent To  
Notes
2016-07-22 15:16:182ND REVIEW MECHANICAL
 PERMIT #16061354
 7/22/16
  
 1) THE REQUESTED EQUIPMENT SCHEDULES FOR THE EXHAUST
 AND MAKEUP AIR FANS HAVE NOT BEEN PLACED ON THE PLANS.
  
 2) THE REQUESTED AIR VELOCITY CALCULATION WAS PERFORMED
 USING A 9 X 29" DUCT, HOWEVER THE GREASE EXHAUST DUCT
 SIZE IS INDICATED TO BE 16 X 16".
  
 3) A 2" CLEARANCE FOR THE HOOD TO THE FRONT EXTERIOR
 WALL IS SHOWN, HOWEVER AN 18" CLEARANCE TO COMBUSTIBLES
 IS REQUIRED. PLEASE SEE SECTION 507.9 AND EXCEPTION,
 AND LABEL THE WALL AS EITHER COMBUSTIBLE OR
 NON-COMBUSTIBLE AND INDICATE WHAT THE WALL MATERIALS
 ARE.
  
 4) M-1: IT APPEARS THAT THE ROOF FANS ARE WITHIN 10' TO
 THE ROOF EDGE WHICH REQUIRES GUARDS TO BE INSTALLED PER
 SECTION 304.11- REVISE THE PLAN ACCORDINGLY.
  
 5) COMMENTS #8, 9, 11, & 12 FROM THE 1ST REVIEW STILL
 EXIST. I AM REPRINTING THOSE COMMENTS BELOW. PLEASE
 SUBMIT CORRECTED PLANS ACCOMPANIED BY A RESPONSE
 NARRATIVRE FROM THE DESIGN PROFESSIONAL.
  
 1ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #16061354
 6/30/16
  
 8) PROVIDE WIND LOAD ENGINEERING FOR ANCHORING OF THE
 FANS AND CURBS TO THE ROOF STRUCTURE- SECTION 301.15.
 PLEASE INCLUDE NOA'S FOR THE ROOF FANS WITH A SHOP
 DRAWING APPROVAL SIGNATURE BY THE ENGINEER OF RECORD.
  
 9) PROVIDE A HOOD HANGING DETAIL.
  
 11) REFER TO SECTION 508.1.1 AND SHOW COMPLIANCE FOR
 MAKEUP AIR TEMPERATURE: THE TEMPERATURE DIFFERENTIAL
 BETWEEN MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE
 SHALL NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT
 WHERE THE ADDED HEATING AND COOLING LOADS OF THE MAKEUP
 AIR DO NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM.
  
 12) PROVIDE AN AIR BALANCE CALCULATION.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-06-30 Cont ID  
Sent By ccole Date 2016-06-30 Time 13:56 Rev Time 0.00
Received By ccole Date 2016-06-30 Time 13:56 Sent To  
Notes
2016-06-30 14:32:001ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #16061354
 6/30/16
  
 1) THE M PLAN HAS A MIAMI BEACH ADDRESS ON IT- PLEASE
 CORRECT.
  
 2) PROVIDE EQUIPMENT SCHEDULES FOR THE EXHAUST AND
 MAKEUP AIR FANS.
  
 3) PROVIDE AN AIR VELOCITY CALCULATION FOR THE EXHAUST
 DUCT- SECTION 506.3.4.
  
 4) REFER TO SECTION 507.9 AND INDICATE THE REQUIRED
 CLEARANCES FOR THE GREASE HOOD INCLUDING WHERE IT IS
 SHOWN BUTTING UP TO THE FRONT EXTERIOR WALL- SECTION
 507.9.
  
 5) SHOW THE VERTICAL DISTANCE FROM THE THE LOWER LIP OF
 THE HOOD AND TO THE TOP HORIZONTAL SURFACE OF THE
 APPLIANCE- SECTION 507.12.
  
 6) PROVIDE A FRONT VIEW DRAWING OF THE HOOD THAT SHOWS
 THE GREASE EXHAUST AND MAKEUP AIR DUCT RUNS, AND
 INCLUDES THE TYPE AND SIZE OF DUCT, AND THE REQUIRED
 CLEARANCES TO COMBUSTIBLES- SEE SECTION 506.3.11.
 PLEASE SEE SECTION 506.3.11.2 FOR FIELD APPLIED GREASE
 ENCLOSURES AND INDICATE THE MAKE AND MODEL OF THE DUCT
 WRAP ON THE PLAN AND SUBMIT MANUFACTURER'S
 SPECIFICATIONS,
  
 7) PROVIDE A ROOF PLAN SHOWING THE REQUIRED CLEARANCE
 DISTANCE FROM THE EXHAUST AND MAKE UP AIR FANS TO THE
 ROOF EDGES- SECTION 304.11
  
 8) PROVIDE WIND LOAD ENGINEERING FOR ANCHORING OF THE
 FANS AND CURBS TO THE ROOF STRUCTURE- SECTION 301.15.
 PLEASE INCLUDE NOA'S FOR THE ROOF FANS WITH A SHOP
 DRAWING APPROVAL SIGNATURE BY THE ENGINEER OF RECORD.
  
 9) PROVIDE A HOOD HANGING DETAIL.
  
 10) REFER TO SECTION 507.11 AND SHOW THE LOCATIONS OF
 AND PROVIDE DETAILS FOR REQUIRED GREASE FILTERS. PLEASE
 NOTE THAT THE FILTERS SHALL BE LISTED AND LABELED IN
 ACCORDANCE WITH UL 1046.
  
 11) REFER TO SECTION 508.1.1 AND SHOW COMPLIANCE FOR
 MAKEUP AIR TEMPERATURE: THE TEMPERATURE DIFFERENTIAL
 BETWEEN MAKEUP AIR AND THE AIR IN THE CONDITIONED SPACE
 SHALL NOT EXCEED 10 DEGREES F (6 DEGREES C) EXCEPT
 WHERE THE ADDED HEATING AND COOLING LOADS OF THE MAKEUP
 AIR DO NOT EXCEED THE CAPACITY OF THE HVAC SYSTEM.
  
 12) PROVIDE AN AIR BALANCE CALCULATION.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 2 Status N Date 2016-08-02 Cont ID  
Sent By tklarge Date 2016-08-02 Time 05:42 Rev Time 0.00
Received By tklarge Date 2016-08-02 Time 04:32 Sent To  
Notes
2016-08-02 05:43:25NO PLUMBING ON THIS PERMIT, ONLY GAS. TKL.

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-07-01 Cont ID  
Sent By gjohnson Date 2016-07-01 Time 14:57 Rev Time 0.00
Received By gjohnson Date 2016-07-01 Time 14:57 Sent To  
Notes
2016-07-01 15:34:051ST REVIEW
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
  
 PLUMBING COMMENTS:
  
 1. IT IS UNCLEAR IF THERE IS ANY PLUMBING WORK BEING
 DONE OFF THESE PLANS IT REFERENCES PLUMBING SUB PERMITS
 UNDER SCOPE OF WORK PLEASE CLARIFY. PER WPB AMEND. TO
 FBC SEC. 107.2.1