Plan Review Details - Permit 16061190
Plan Review Stops For Permit 16061190
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-05-02 Cont ID  
Sent By shill Date 2017-05-02 Time 11:07 Rev Time 0.00
Received By shill Date 2017-05-02 Time 10:57 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2017-03-13 Cont ID  
Sent By shill Date 2017-03-13 Time 10:56 Rev Time 0.00
Received By shill Date 2017-03-13 Time 10:56 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-08-03 Cont ID  
Sent By shill Date 2016-08-03 Time 17:22 Rev Time 0.00
Received By shill Date 2016-08-03 Time 17:22 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-05-18 Cont ID  
Sent By lmarchan Date 2017-05-18 Time 08:29 Rev Time 0.00
Received By lmarchan Date 2017-05-01 Time 12:57 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2017-03-13 Cont ID  
Sent By shill Date 2017-03-13 Time 12:04 Rev Time 0.00
Received By shill Date 2017-03-13 Time 12:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-08-05 Cont ID  
Sent By lmarchan Date 2016-08-05 Time 13:24 Rev Time 0.00
Received By lmarchan Date 2016-07-07 Time 16:30 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2017-05-02 Cont ID  
Sent By shill Date 2017-05-02 Time 11:08 Rev Time 0.00
Received By shill Date 2017-05-02 Time 11:08 Sent To  
Notes
2017-05-02 11:09:03NEW SHEETS VERIFIED
 PROVISO - ANY SHEETS ADDED AFTER 5/2 REQUIRE SIGNATURE
 REVIEW
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2017-03-13 Cont ID  
Sent By shill Date 2017-03-13 Time 11:20 Rev Time 0.00
Received By shill Date 2017-03-13 Time 11:20 Sent To  
Notes
2017-03-13 11:20:47PROVISO - FOR THIS REVIEW CYCLE ONLY.
 ANY NEW SHEETS REQUIRE A NEW SIGNATURE REVIEW
  

Review Stop Z ZONING
Rev No 3 Status P Date 2017-05-17 Cont ID  
Sent By eschneid Date 2017-05-17 Time 15:36 Rev Time 0.50
Received By eschneid Date 2017-05-17 Time 14:47 Sent To PC
Notes
2017-05-17 15:40:591) THE SITE DIFFERS FROM THE PLANS APPROVED AS PART OF
 RESOLUTION NO. 260-16. PRIOR TO THE C.O. FOR THE
 BUILDING, THE BUILDING PERMIT APPROVED AS-BUILT PLANS
 MUST BE SUBMITTED TO THE PLANNING DIVISION AS PART OF A
 MINOR AMENDMENT TO THE SITE PLAN.
  
 2) THE HARDSCAPE WORK WITHIN THE OKEECHOBEE BOULEVARD
 RIGHT-OF-WAY REQUIRES A FLORIDA DEPARTMENT OF
 TRANSPORTATION RIGHT-OF-WAY PERMIT. A COPY OF THE FDOT
 PERMIT SHALL BE SUPPLIED TO THE PLANNING DIVISION. THE
 WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE PLANS
 APPROVED AS PART OF THE LEVEL III SITE PLAN REVIEW AND
 THE FDOT PERMIT AND THE FDOT APPROVAL SIGN-OFF OF THE
 WORK SHALL BE PROVIDED TO THE PLANNING DIVISION PRIOR
 TO THE C.O. FOR THE RESTORATION HARDWARE GALLERY.
 PLEASE REMEMBER THAT THIS INCLUDES THE PEDESTRIAN
 CROSSING ENHANCEMENT AT THE WEST END OF THE SITE
 (LARGER MEDIAN) AND THE CROSSING TO THE OFFICE TOWER.
  

Review Stop Z ZONING
Rev No 2 Status F Date 2017-02-28 Cont ID  
Sent By eschneid Date 2017-02-28 Time 11:53 Rev Time 0.00
Received By eschneid Date 2017-02-28 Time 11:53 Sent To  
Notes
2017-02-28 14:05:47FAILED
  
 PLEASE PROVIDE WRITTEN RESPONSES.
  
  
 1) THE SITE DIFFERS FROM THE PLANS APPROVED AS PART OF
 RESOLUTION NO. 260-16. PRIOR TO THE C.O. FOR THE
 BUILDING, THE BUILDING PERMIT APPROVED AS-BUILT PLANS
 MUST BE SUBMITTED TO THE PLANNING DIVISION AS PART OF A
 MINOR AMENDMENT TO THE SITE PLAN.
  
 2) THE HARDSCAPE WORK WITHIN THE OKEECHOBEE BOULEVARD
 RIGHT-OF-WAY REQUIRES A FLORIDA DEPARTMENT OF
 TRANSPORTATION RIGHT-OF-WAY PERMIT. A COPY OF THE FDOT
 PERMIT SHALL BE SUPPLIED TO THE PLANNING DIVISION. THE
 WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE PLANS
 APPROVED AS PART OF THE LEVEL III SITE PLAN REVIEW AND
 THE FDOT PERMIT AND THE FDOT APPROVAL SIGN-OFF OF THE
 WORK SHALL BE PROVIDED TO THE PLANNING DIVISION PRIOR
 TO THE C.O. FOR THE RESTORATION HARDWARE GALLERY.
 PLEASE REMEMBER THAT THIS INCLUDES THE PEDESTRIAN
 CROSSING ENHANCEMENT AT THE WEST END OF THE SITE
 (LARGER MEDIAN) AND THE CROSSING TO THE OFFICE TOWER.
  
 3) THE BICYCLE RACK PAD HAS BEEN REORIENTED. IT DOES
 NOT APPEAR TO MEET THE MINIMUM CODE REQUIREMENTS OF 30
 INCHES BETWEEN THE RACKS. PLEASE PROVIDE THE DIMENSIONS
 ON THE SITE PLAN SO THAT STAFF CAN VERIFY THAT THE PAD
 IS SUFFICIENTLY LARGE ENOUGH FOR THE FOUR RACKS.
  
 4) ARTIFICIAL TURF IS BEING PROPOSED FOR USE ON THE
 SITE. PROVIDE WRITTEN VERIFICATION OF COMPLIANCE WITH
 THE ARTIFICIAL TURF PROVISIONS OF SECTIONS 94-451(E)
 AND (F) OF THE ZONING AND LAND DEVELOPMENT REGULATIONS.
 FOR YOUR CONVENIENCE, THE PROVISIONS HAVE BEEN PROVIDED
 BELOW:
  
 94-451(E) MINIMUM MATERIAL STANDARDS. ALL ARTIFICIAL
 TURF SHALL COMPLY WITH THE FOLLOWING MINIMUM STANDARDS:
  
 (1) ARTIFICIAL TURF SHALL CONSIST OF GREEN LIFELIKE
 INDIVIDUAL BLADES OF GRASS THAT EMULATE NATURAL TURF IN
 LOOK AND COLOR AND SHALL HAVE A MINIMUM PILE HEIGHT OF
 1.5 INCHES AND SHALL HAVE A MINIMUM TUFTED WEIGHT OF 56
 OUNCES PER SQUARE YARD.
  
 (2) WHERE ARTIFICIAL TURF IS UTILIZED FOR INSTITUTIONAL
 RECREATIONAL USES (E.G., PLAYGROUNDS, ATHLETIC FIELDS),
 THE ARTIFICIAL TURF PRODUCT INSTALLED SHALL BE DESIGNED
 FOR THE INTENDED USE AND MEET THE APPROPRIATE
 ADDITIONAL STANDARDS.
  
 (3) ARTIFICIAL TURF INSTALLATIONS SHALL HAVE A MINIMUM
 PERMEABILITY OF 30 INCHES PER HOUR PER SQUARE YARD.
  
 (4) ALL ARTIFICIAL TURF SHALL HAVE A MINIMUM EIGHT YEAR
 MANUFACTURER'S WARRANTY THAT PROTECTS AGAINST COLOR
 FADING AND A DECREASE IN PILE HEIGHT.
  
 (5) ARTIFICIAL TURF SHALL BE LEAD FREE.
  
 (6) ALL MATERIALS MUST INCLUDE TEST DOCUMENTATION WHICH
 DECLARES THAT THE ARTIFICIAL TURF YARN AND BACKING
 MATERIALS ARE DISPOSABLE UNDER NORMAL CONDITIONS, AT
 ANY US LANDFILL STATION (TOTAL CONTENT LEACH PROTOCOL
 (TCLP) TEST).
  
 (7) THE USE OF INDOOR OR OUTDOOR PLASTIC OR NYLON
 CARPETING AS A REPLACEMENT FOR ARTIFICIAL TURF OR
 NATURAL TURF SHALL BE PROHIBITED.
  
 94-451(F) INSTALLATION, MAINTENANCE AND REPAIR.
  
 (1) ALL ARTIFICIAL TURF SHALL, AT A MINIMUM, BE
 INSTALLED ACCORDING TO THE MANUFACTURER'S
 SPECIFICATIONS.
  
 (2) ALL ARTIFICIAL TURF INSTALLATIONS SHALL BE ANCHORED
 TO ENSURE THAT THE TURF WILL WITHSTAND THE EFFECTS OF
 WIND.
  
 (3) ALL SEAMS SHALL BE NAILED AND GLUED, NOT SEWN, AND
 EDGES SHALL BE TRIMMED TO FIT AGAINST ALL REGULAR AND
 IRREGULAR EDGES TO RESEMBLE A NATURAL LOOK.
  
 (4) IF ARTIFICIAL TURF IS PLANNED TO BE INSTALLED
 IMMEDIATELY ADJACENT TO A SEAWALL, THE ARTIFICIAL TURF
 SHALL BE PINNED OR STAKED BEHIND THE SEAWALL. NO
 ARTIFICIAL TURF OR INSTALLATION MECHANISM SHALL BE
 ATTACHED DIRECTLY TO OR PLACED ON A SEAWALL OR SEAWALL
 CAP.
  
 (5) PROPER DRAINAGE SHALL BE PROVIDED FOR ALL
 ARTIFICIAL TURF INSTALLATIONS TO PREVENT EXCESS RUNOFF
 OR POOLING OF WATER.
  
 (6) ARTIFICIAL TURF SHALL BE VISUALLY LEVEL, WITH THE
 GRAIN POINTING IN A SINGLE DIRECTION.
  
 (7) AN APPROPRIATE SOLID BARRIER DEVICE (E.G., CONCRETE
 MOW STRIP, BENDER BOARD) IS REQUIRED TO SEPARATE
 ARTIFICIAL TURF FROM SOIL AND LIVE VEGETATION.
  
 (8) PRECAUTIONS FOR INSTALLATION AROUND EXISTING TREES
 SHALL BE MONITORED AND MAY BE RESTRICTED TO ENSURE TREE
 ROOTS ARE NOT DAMAGED WITH THE INSTALLATION OF THE BASE
 MATERIAL AND THAT THE OVERALL HEALTH OF THE TREE WILL
 NOT BE COMPROMISED
  
 (9) ALL ARTIFICIAL TURF SHALL BE MAINTAINED IN A GREEN
 FADELESS CONDITION AND SHALL BE MAINTAINED FREE OF
 DIRT, MUD, STAINS, WEEDS, DEBRIS, TEARS, HOLES, AND
 IMPRESSIONS. MAINTENANCE SHALL INCLUDE, BUT NOT BE
 LIMITED TO CLEANING, BRUSHING, DEBRIS REMOVAL;
 REPAIRING OF DEPRESSIONS AND RUTS TO MAINTAIN A
 VISUALLY-LEVEL SURFACE; ELIMINATION OF ANY ODORS, FLAT
 OR MATTED AREAS, WEEDS, AND EVASIVE ROOTS; AND ALL
 EDGES OF THE ARTIFICIAL TURF SHALL NOT BE LOOSE AND
 MUST BE MAINTAINED WITH APPROPRIATE EDGING OR STAKES.
  
 (10) ALL ARTIFICIAL TURF MUST BE REPLACED IF IT FALLS
 INTO DISREPAIR WITH FADING OR HOLES OR LOSE AREAS.
 REPLACEMENT AND/OR REPAIRS SHALL BE DONE WITH LIKE FOR
 LIKE MATERIALS FROM THE SAME MANUFACTURER AND DONE SO
 IN A MANNER THAT RESULTS IN A REPAIR THAT BLENDS IN
 WITH THE EXISTING ARTIFICIAL TURF.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
 [email protected]
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2016-08-04 Cont ID  
Sent By eschneid Date 2016-08-04 Time 10:42 Rev Time 0.50
Received By eschneid Date 2016-08-04 Time 10:42 Sent To  
Notes
2016-08-04 10:46:14FAILED
  
 PLEASE PROVIDE WRITTEN RESPONSES.
  
 1) THE PROPOSED SITE LAYOUT IS SCHEDULED TO BE HEARD BY
 THE CITY COMMISSION ON AUGUST 29, 2016. ZONING CANNOT
 GIVE FINAL APPROVAL OF THE PERMIT UNTIL AFTER THE
 COMMISSION APPROVAL AND EFFECTIVE DATE OF THE
 RESOLUTION.
  
 2) THE HARDSCAPE WORK WITHIN THE OKEECHOBEE BOULEVARD
 RIGHT-OF-WAY REQUIRES A FLORIDA DEPARTMENT OF
 TRANSPORTATION RIGHT-OF-WAY PERMIT. THE WORK WITHIN THE
 RIGHT-OF-WAY SHALL BE ANNOTATED ON THE PLANS. A COPY OF
 THE FDOT PERMIT SHALL BE SUPPLIED TO THE PLANNING
 DIVISION. THE WORK SHALL BE COMPLETED IN ACCORDANCE
 WITH THE PLANS APPROVED AS PART OF THE LEVEL III SITE
 PLAN REVIEW AND THE FDOT PERMIT AND THE FDOT APPROVAL
 SIGN-OFF OF THE WORK SHALL BE PROVIDED TO THE PLANNING
 DIVISION PRIOR TO THE C.O. FOR THE RESTORATION HARDWARE
 GALLERY. PLEASE REMEMBER THAT THIS INCLUDES THE
 PEDESTRIAN CROSSING ENHANCEMENT AT THE WEST END OF THE
 SITE (LARGER MEDIAN) AND THE CROSSING TO THE OFFICE
 TOWER.
  
 3) PROVIDE THE VERSION OF SHEET A-050 THAT IS BEING
 CONSIDERED AS PART OF RESOLUTION NO. 260-16, LEVEL III
 SITE PLAN AMENDMENT.
  
 4) SHEETS THAT WILL BE APPROVED UPON PASSAGE OF
 RESOLUTION NO. 260-16 ? L 1.90, L 2.00, L 2.10.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved