Plan Review Details - Permit 16061076
Plan Review Stops For Permit 16061076
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-06-22 Cont ID  
Sent By cthroop Date 2016-06-22 Time 11:53 Rev Time 0.00
Received By cthroop Date 2016-06-22 Time 11:49 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-06-20 Cont ID  
Sent By mvaldes Date 2016-06-20 Time 14:11 Rev Time 0.00
Received By mvaldes Date 2016-06-20 Time 14:11 Sent To P
Notes
2016-06-20 14:13:08SENT TO GEORGE PLUMBING.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-07-01 Cont ID  
Sent By tklarge Date 2016-07-01 Time 12:21 Rev Time 0.00
Received By tklarge Date 2016-07-01 Time 12:21 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-06-22 Cont ID  
Sent By cthroop Date 2016-06-22 Time 11:53 Rev Time 0.00
Received By cthroop Date 2016-06-17 Time 10:14 Sent To  
Notes
2016-06-20 10:15:59ROUTED TO ELECTRICAL <5K

Review Stop P PLUMBING
Rev No 2 Status P Date 2016-07-01 Cont ID  
Sent By tklarge Date 2016-07-01 Time 12:19 Rev Time 0.00
Received By tklarge Date 2016-07-01 Time 12:19 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-06-21 Cont ID  
Sent By gjohnson Date 2016-06-21 Time 14:25 Rev Time 0.00
Received By gjohnson Date 2016-06-21 Time 14:25 Sent To  
Notes
2016-06-21 14:25:191ST REVIEW
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
  
 PLUMBING COMMENTS:
  
 1. WHAT TYPE OF T+P ARE YOU USING TO COMPLY WITH FBC
 MECH SEC. 1402.5.1 PRESSURE AND TEMPERATURE.
 SOLAR ENERGY SYSTEM COMPONENTS CONTAINING PRESSURIZED
 FLUIDS SHALL BE PROTECTED AGAINST PRESSURES AND
 TEMPERATURES EXCEEDING DESIGN LIMITATIONS WITH A
 PRESSURE AND TEMPERATURE RELIEF VALVE. EACH SECTION OF
 THE SYSTEM IN WHICH EXCESSIVE PRESSURES ARE CAPABLE OF
 DEVELOPING SHALL HAVE A RELIEF DEVICE LOCATED SO THAT A
 SECTION CANNOT BE VALVED OFF OR OTHERWISE ISOLATED FROM
 A RELIEF DEVICE. RELIEF VALVES SHALL COMPLY WITH THE
 REQUIREMENTS OF SECTION 1006.4 AND DISCHARGE IN
 ACCORDANCE WITH SECTION 1006.6.
  
 2. PROVIDE A VACUM RELIEF VALVE .PER FBC MECH. 1402.5.2
 VACUUM.
 THE SOLAR ENERGY SYSTEM COMPONENTS THAT ARE SUBJECTED
 TO A VACUUM WHILE IN OPERATION OR DURING SHUTDOWN SHALL
 BE DESIGNED TO WITHSTAND SUCH VACUUM OR SHALL BE
 PROTECTED WITH VACUUM RELIEF VALVES.
  
 3. SYSTEM SHALL COMPLY WITH FBC MECH. SEC. 1402.5.3
 PROTECTION FROM FREEZING.
 SYSTEM COMPONENTS SHALL BE PROTECTED FROM DAMAGE BY
 FREEZING OF HEAT TRANSFER LIQUIDS AT THE LOWEST AMBIENT
 TEMPERATURES THAT WILL BE ENCOUNTERED DURING THE
 OPERATION OF THE SYSTEM