| Plan Review Stops For Permit 16060842 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2016-08-16 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2016-08-16 |
Time |
12:07 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2016-08-16 |
Time |
09:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2016-06-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2016-06-17 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2016-06-17 |
Time |
07:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-07-19 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2016-07-19 |
Time |
13:59 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2016-07-19 |
Time |
13:59 |
Sent To |
|
|
| Notes |
| 2016-07-19 14:01:40 | THIS REVIEW WAS APPROVED AS SUBMITTED PROVIDED THAT ALL | | | LIFE SAFETY PRECAUTIONS ARE MET. SPECIFIC DETAILS HAVE | | | BEEN PREVIOUSLY APPROVED WITH THE REVIEW OF PERMIT | | | 16060841 FOR THE BUILD-OUT. |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2016-08-15 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-08-15 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-08-15 |
Time |
12:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2016-06-21 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-06-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-06-21 |
Time |
15:23 |
Sent To |
|
|
| Notes |
| 2016-06-21 15:55:25 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | | | | SEE COMMENTS TO PERMIT # 16060841. | | | | | | 1) SHEET D 1.1 - THE PROPOSED DEMOLITION SIGNIFICANTLY | | | IMPACTS THE ELEVATOR LOBBY AND IT'S DESIGNED | | | PROTECTION, I.E SMOKE CONTROL ELEVATOR PRESSURIZATION, | | | ETC. | | | | | | PLEASE PROVIDE A REVIEW FROM THE ENGINEER OF RECORD AND | | | DESIGN OF THE LIFE SAFETY FEATURES OF THIS STRUCTURE | | | AND HOW IT WILL EFFECT THE ELEVATOR LOBBY PROTECTION. | | | | | | 2) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE | | | RE-SUBMITTAL OF THE ABOVE. | | | | | | | | | | | | | | | PETER LEDUC | | | FIRE MARSHAL | | | 561-804-4709 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-08-17 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2016-08-17 |
Time |
09:18 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2016-08-08 |
Time |
09:58 |
Sent To |
|
|
| Notes |
| 2016-08-09 09:58:41 | B17 | | | *TRAVELLING WITH 16060841** |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-07-19 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2016-07-19 |
Time |
14:02 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2016-06-14 |
Time |
13:09 |
Sent To |
|
|
| Notes |
| 2016-07-19 14:06:54 | 7/19/16 BOTH PLANS TRAVELING TOGETHER WERE ROUTED TO | | | THE LARGE DENIED BIN "H". CONTRACTOR NOTIFIED VIA | | | EMAIL. MA | | 2016-06-14 13:09:22 | B17 | | | *TRAVELLING WITH 16060841** |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2016-08-17 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2016-08-17 |
Time |
09:18 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2016-08-17 |
Time |
09:18 |
Sent To |
|
|
| Notes |
| 2016-08-16 15:44:49 | PERMIT #16060842 | | | | | | I WAS NOT ABLE TO LOCATE THE PERMIT AND PLANS FOR THIS | | | PROJECT. | | | THEY ARE SUPPOSED TO BE RIDING WITH #16060841 IN B17 | | | PER THE LIBRARIAN'S NOTE. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | | | | | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2016-06-20 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-06-20 |
Time |
09:08 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-06-20 |
Time |
09:08 |
Sent To |
|
|
| Notes |
| 2016-06-20 09:10:48 | 1ST REVIEW: FBC 2014 MECHANICAL | | | PERMIT #16060842 | | | 6/20/16 | | | | | | 1) PROVIDE MECHANICAL DEMOLITION KEY NOTES AND DETAILS | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2016-08-16 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2016-08-16 |
Time |
12:07 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2016-08-16 |
Time |
12:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2016-06-17 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2016-06-17 |
Time |
07:42 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2016-06-17 |
Time |
07:30 |
Sent To |
|
|
| Notes |
|
|