Plan Review Details - Permit 16051111
| Plan Review Stops For Permit 16051111 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2016-06-23 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-06-23 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-06-23 |
Time |
11:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2016-06-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-06-01 |
Time |
12:15 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-06-01 |
Time |
12:15 |
Sent To |
|
|
| Notes |
| 2016-06-01 12:20:44 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FROM PREVIOUS LIST (INCLUDED ONLY THE PORTION | | | APPLICABLE TO THIS SUBMITTAL): | | | | | | 1. EVIDENCE OF DELEGATED ENGINEERING REVIEW IS TO BE | | | ACCOMPLISHED IN THE FOLLOWING WAYS (FBC 107): | | | | | | B. A REVIEW LETTER, SIGNED AND SEALED IN ACCORDANCE | | | WITH FAC61G15-23.002/FS471. THE LETTER IS TO BE VERY | | | SPECIFIC - ENGINEER NAME AND FIRM, DRAWINGS REVIEWED | | | (SHEET NUMBERS, DATES, NAME OF DRAWINGS). THE LETTER | | | SUBMITTED HAS A DIGITALLY CREATED SIGNATURE, REFERS TO | | | DRAWINGS PREPARED BY CECO, BUT CECO DELEGATED TO | | | ANOTHER ENGINEER AND FIRM OR, | | | | | | 2ND REVIEW, LETTER IS SIGNED AND SEALED BUT NOT | | | REVISED. THIS DELEGATED ENGINEERING REVIEW LETTER WAS | | | REVIEWED BY THE BUILDING OFFICIAL AND HE DETERMINED | | | THAT THE LETTER IN ITS CURRENT STATE DID NOT REFER | | | SPECIFICALLY ENOUGH TO THE DELEGATED ENGINEERING. | | | | | | THE LETTER DOES NOT REFER TO ANY SHEET NUMBERS OR DATES | | | | | | THE LETTER REFERS TO ENGINEER'S DRAWINGS AND | | | CALCULATIONS "PREPARED BY SUNCOAST POST-TENSION." IT | | | DOES NOT APPEAR THAT SUNCOAST POST-TENSION DID NOT | | | PREPARE THE DRAWINGS. BASED ON THE SEAL AND TITLE | | | BLOCK, THE ENGINEERING WAS PREPARED BY RAFAEL E. | | | PUERTA, PE, OF DPS INC. | | | | | | 2. FOR DELEGATED ENGINEERING REVIEW PREVIOUSLY REVIEWED | | | WITH A DIGITAL IMAGE OF A SIGNATURE, PLEASE PROVIDE | | | SIGNED AND SEALED ORIGINALS TO PROPERLY DOCUMENT THE | | | FILE. | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2016-05-26 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-05-26 |
Time |
14:02 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-05-26 |
Time |
13:57 |
Sent To |
|
|
| Notes |
| 2016-05-26 14:15:20 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. EVIDENCE OF DELEGATED ENGINEERING REVIEW IS TO BE | | | ACCOMPLISHED IN THE FOLLOWING WAYS (FBC 107): | | | | | | A. A SHOP DRAWING REVIEW STAMP DIRECTLY ON THE | | | DELEGATED ENGINEERING BY THE EOR (OR BY ANOTHER | | | LICENSED ENGINEER IN THE EOR'S OFFICE, PLEASE INCLUDE | | | NAME & LICENSE NUMBER). THE SIGNATURE/INITIALS SHOULD | | | BE IN INK, OR | | | | | | B. A REVIEW LETTER, SIGNED AND SEALED IN ACCORDANCE | | | WITH FAC61G15-23.002/FS471. THE LETTER IS TO BE VERY | | | SPECIFIC - ENGINEER NAME AND FIRM, DRAWINGS REVIEWED | | | (SHEET NUMBERS, DATES, NAME OF DRAWINGS). THE LETTER | | | SUBMITTED HAS A DIGITALLY CREATED SIGNATURE, REFERS TO | | | DRAWINGS PREPARED BY CECO, BUT CECO DELEGATED TO | | | ANOTHER ENGINEER AND FIRM OR, | | | | | | C. THE DELEGATED ENGINEERING COULD BE SUBMITTED | | | DIGITALLY. IF THIS ENGINEER (RAFAEL E. PUERTA, PE OF | | | DPS INC) DOES NOT HAVE A DIGITAL SIGNATURE, THE PAPER | | | ORIGINAL CAN BE PROVIDED AT THE BUILDING DIVISION AS A | | | "SIGNATURE DOCUMENT." THE ENGINEER CAN SIGN AND SEAL | | | HIS REVIEW LETTER DIGITALLY. | | | | | | 2. FOR DELEGATED ENGINEERING REVIEW PREVIOUSLY REVIEWED | | | WITH A DIGITAL IMAGE OF A SIGNATURE, PLEASE PROVIDE | | | SIGNED AND SEALED ORIGINALS TO PROPERLY DOCUMENT THE | | | FILE. | | | | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2016-06-23 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-06-23 |
Time |
11:38 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-06-10 |
Time |
11:21 |
Sent To |
|
|
| Notes |
| 2016-06-10 11:22:05 | RESUB ROUTED TO SHILL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-06-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-06-01 |
Time |
12:20 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-06-01 |
Time |
10:23 |
Sent To |
|
|
| Notes |
| 2016-06-01 10:24:07 | RESUB ROUTED TO SHILL |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-05-27 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-05-27 |
Time |
08:43 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-05-25 |
Time |
10:34 |
Sent To |
|
|
| Notes |
| 2016-05-26 10:34:52 | SUBMITTAL ROUTED TO SHILL |
|
|
|