Plan Review Details - Permit 16050542
Plan Review Stops For Permit 16050542
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2016-07-11 Cont ID  
Sent By rmcdouga Date 2016-07-11 Time 16:42 Rev Time 0.00
Received By rmcdouga Date 2016-07-11 Time 16:42 Sent To Z
Notes
2016-07-11 16:47:57APPROVED WITH EXCEPTIONS
 1) SUBMIT TWO SETS OF PRODUCT APPROVALS THAT HAVE BEEN
 REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF
 RECORD FOR THE INSWING DOOR. FBC 107.3.4.1 FAC 61G20-3

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2016-06-30 Cont ID  
Sent By rmcdouga Date 2016-06-30 Time 17:48 Rev Time 0.00
Received By rmcdouga Date 2016-06-30 Time 12:50 Sent To E
Notes
2016-06-30 14:56:50PLAN
 REVIEW COMMENTS
  
 2ND REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) PROVIDE A SET OF SIGNED AND SEALED TRUSS LAYOUT AND
 DRAWINGS THAT HAVE BEEN APPROVED BY THE DESIGNER OF
 RECORD FOR THE STRUCTURE TO THE FIELD INSPECTOR PRIOR
 TO INSTALLATION. FBC-R802.1.7.1 THE TRUSS ENGINEER'S
 ORIGINAL HANDWRITTEN SIGNATURE IS REQUIRED ON THE TRUSS
 LAYOUT AND TRUSS DRAWINGS. FACSIMILES ARE NOT
 ACCEPTABLE. THE TRUSS DOCUMENTS THAT WERE SUBMITTED
 HAVE A RUBBER STAMPED SIGNATURE. FAC 61G15-23.002
  
 2) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS
 FOR THOSE PRODUCTS WHICH ARE REGULATED BY
 FAC61G15-23.002 THAT HAVE BEEN REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD. PROVIDE TWO COMPLETE
 PRODUCT APPROVALS WITH FL OR NOA NUMBERS INCLUDING
 INSTALLATION INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES
 FOR THE ROOF SHINGLES, WINDOWS, STORM PANELS AND
 EXTERIOR DOORS.
  
 3) THE PLANS SPECIFY NEW SINGLE HUNG WINDOWS IN THE
 SCOPE OF WORK ON SHEET S-1 AND IMPACT CASEMENT WINDOWS
 ON SHEET S-3. CLARIFY AND SUBMIT THE APPROPRIATE
 PRODUCT APPROVALS THAT HAVE BEEN REVIEWED AND APPROVED
 IN WRITING BY THE DESIGNER OF RECORD. FBC 107.2.1 & FAC
 RULE 61G20-3
  
 4) THE PRODUCT APPROVALS THAT WERE SUBMITTED ARE FOR
 NON-IMPACT RATED CASEMENT WINDOWS. IMPACT PROTECTION OF
 THE GLAZED OPENINGS IS REQUIRED BY FBCR 301.2.1.2.
 SUBMIT TWO SETS OF PRODUCT APPROVALS FOR THE STORM
 PANELS ALONG WITH A KEY PLAN AND AN INSTALLATION
 SCHEDULE.
  
 5) SHEET S-1 SPECIFIES FOUR (4) NEW 2-6 X 6-8 IN-SWING
 DOORS AND SHEET S-3 SPECIFIES TWO (2) NEW DOORS, ONE
 OUTSWING 3-0 X 6-8 DOOR AND ONE 2-8 X 6-8 IN-SWING
 DOOR. COORDINATE THE PLANS AND SUBMIT THE APPROPRIATE
 PRODUCT APPROVALS THAT HAVE BEEN REVIEWED AND APPROVED
 IN WRITTING BY THE DESIGNER OF RECORD. FBC 107.2.1 &
 FAC RULE 61G20-3
  
 6)THE ASPHALT SHINGLE ROOF HAS A SLOPE THAT IS LESS
 THAN 4/12 AND REQUIRES A DOUBLE LAYER OF UNDERLAYMENT
 PER FBCR 905.2.2. SUBMIT PRODUCT APPROVALS THAT HAVE
 BEEN REVIEWED AND APPROVED IN WRITING BY THE DESIGNER
 OF RECORD FOR THE ROOFING MATERIAL THAT WILL BE USED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-05-26 Cont ID  
Sent By rmcdouga Date 2016-05-26 Time 15:14 Rev Time 0.00
Received By rmcdouga Date 2016-05-25 Time 07:45 Sent To Z
Notes
2016-05-25 17:42:34PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC FIFTH EDITION (2014)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) THE FOLLOWING INSULATION R-VALUES ARE REQUIRED BY
 THE 2014 FBC ENERGY CONSERVATION FOR YOUR PROJECT.
 ATTIC INSULATION TO BE R-30 AND EXTERIOR WALLS TO BE
 R-13 PER SECTION R101.4.3 AND THE COMMON WALL BETWEEN
 THE UNITS SHALL BE R-11 PER SECTION R402.2.13.
  
 2) PROVIDE DETAILS OF THE APPROVED ONE HOUR FIRE
 RESISTIVE ASSEMBLY THAT IS REQUIRED TO SEPARATE THE TWO
 DWELLING UNITS PER FBC-R302.3.
  
 3) SHOW HOW THE RATED WALL WILL COMPLY WITH
 FBC-R302.4.2 FOR MEMBRANE PENETRATIONS OF THE ONE HOUR
 DWELLING SEPARATION WALL.
  
 4) SHOW COMPLIANCE WITH FBC-R 807.1 FOR REQUIRED ATTIC
 ACCESS.
  
 5) SPECIFY THE ROOF SLOPE ON THE PLANS. FBC 107.2.1
  
 6) PROVIDE A SET OF SIGNED AND SEALED TRUSS LAYOUT AND
 DRAWINGS THAT HAVE BEEN APPROVED BY THE DESIGNER OF
 RECORD FOR THE STRUCTURE TO THE FIELD INSPECTOR PRIOR
 TO INSTALLATION. FBC-R802.1.7.1
  
 7) SHOW THAT THE NEW SOFFIT WILL BE VENTED IN
 COMPLIANCE WITH FBC-R 806.2 MINIMUM VENT AREA.
  
 8) IDENTIFY THE WINDOWS THAT WILL BE REPLACED ON THE
 PLANS AND SPECIFY THEIR SIZES. FBC 107.2.1
  
 9) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS
 FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3
 THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE
 DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT
 APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION
 INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR THE
 ROOFING MATERIALS AND SINGLE HUNG WINDOWS.
  
 10) PER THE 2014 FBC EXISTING BUILDING SECTION 708.1.1,
 WHEN MORE THAN 25% OF THE TOTAL ROOF AREA OR ROOF
 SECTION IS BEING REPLACED, THEN THE ENTIRE ROOF SYSTEM
 IS REQUIRED TO BE REPLACED TO MEET CODE.
  
2016-05-19 16:06:35DETERMIONE IF RE-ROOFING IS PART OF THIS SCOPE IF SO,
 AND UPON APPROVAL, REVOKE OLD RE-ROOF PERMIT, 03070942,
 SAK

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-07-06 Cont ID  
Sent By mvaldes Date 2016-07-06 Time 10:49 Rev Time 0.00
Received By mvaldes Date 2016-07-06 Time 10:44 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-06-01 Cont ID  
Sent By mvaldes Date 2016-05-19 Time 18:04 Rev Time 0.00
Received By mvaldes Date 2016-05-19 Time 18:04 Sent To  
Notes
2016-05-19 18:06:26JOB PERMIT NUMBER: 16050542
 JOB ADDRESS: 218 WALTON BLVD
 WEST PALM BEACH FLORIDA
 DATE: 6/1/16
  
 - REVIEWED AS A REPAIR IN ACCORDANCE WITH FBC-EX 607 (
 MINIMUM REQUIREMENTS )
  
 FBC 2014 5TH ED. NEC 2011
 MARIO VALDES
 ELECTRICAL PLAN EXAMINER
 561-805-6713
 [email protected]
  

Review Stop HIST HISTORICAL
Rev No 3 Status P Date 2016-07-12 Cont ID  
Sent By destabro Date 2016-07-12 Time 13:46 Rev Time 0.00
Received By destabro Date 2016-07-12 Time 13:46 Sent To B
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2016-06-21 Cont ID  
Sent By destabro Date 2016-06-21 Time 08:28 Rev Time 0.00
Received By destabro Date 2016-06-21 Time 08:28 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2016-06-01 Cont ID  
Sent By njwira Date 2016-06-01 Time 12:03 Rev Time 0.00
Received By destabro Date 2016-06-01 Time 16:31 Sent To  
Notes
2016-06-01 13:55:536/1/16 - WITHIN THE CENTRAL HISTORIC DISTRICT,
 CURRENTLY HAS CASEMENT SWING WINDOWS.APPLICANT PROVIDED
 PRODUCT APPROVALS FOR SINGLE-HUNG VINYL PRODUCTS, WHICH
 ARE NOT PERMITTED IN HISTORIC DISTRICTS UNLESS APPROVED
 BY THE HPB. APPLICANT PROVIDED COA AND ALTERNATIVE TO
 REPLACE WINDOWS IN-KIND WITH ALUMINUM CASEMENT.
 QUESTIONS MAY BE DIRECTED TO DESIREE ESTABROOK,
 HISTORIC PRESERVATION PLANNER AT 561.822.1428.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-07-12 Cont ID  
Sent By cpuell Date 2016-07-12 Time 15:42 Rev Time 0.00
Received By cpuell Date 2016-07-07 Time 13:43 Sent To  
Notes
2016-07-07 13:43:43LIBRARY

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-07-06 Cont ID  
Sent By mvaldes Date 2016-07-06 Time 10:49 Rev Time 0.00
Received By mvaldes Date 2016-06-17 Time 13:49 Sent To  
Notes
2016-06-17 13:49:41RESUB ROUTED TO HISTORIC VIA ZONING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-06-02 Cont ID  
Sent By cpuell Date 2016-06-02 Time 09:38 Rev Time 0.00
Received By cpuell Date 2016-05-13 Time 09:24 Sent To  
Notes
2016-05-13 09:24:41R03

Review Stop M MECHANICAL (A/C)
Rev No 2 Status N Date 2016-07-11 Cont ID  
Sent By rmcdouga Date 2016-07-11 Time 17:13 Rev Time 0.00
Received By rmcdouga Date 2016-07-11 Time 17:13 Sent To  
Notes
2016-07-11 17:15:04EXISTING WALL UNITS TO BE REPLACED. NO MECHANICAL WORK
 SHOWN ON PLANS. A SEPARATE PERMIT, APPLICATION AND
 REVIEW WILL BE REQUIRED.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2016-05-19 Cont ID  
Sent By jvalido Date 2016-05-19 Time 15:39 Rev Time 0.00
Received By jvalido Date 2016-05-19 Time 15:31 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2016-07-11 Cont ID  
Sent By rmcdouga Date 2016-07-11 Time 16:42 Rev Time 0.00
Received By rmcdouga Date 2016-07-11 Time 16:42 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2016-05-16 Cont ID  
Sent By gjohnson Date 2016-05-16 Time 18:09 Rev Time 0.00
Received By gjohnson Date 2016-05-16 Time 18:09 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2016-07-12 Cont ID  
Sent By njwira Date 2016-07-12 Time 09:21 Rev Time 0.00
Received By njwira Date 2016-07-12 Time 09:21 Sent To HIST
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2016-06-01 Cont ID  
Sent By njwira Date 2016-05-27 Time 13:40 Rev Time 0.00
Received By njwira Date 2016-05-27 Time 13:40 Sent To HIST
Notes
***NONE***