| Plan Review Stops For Permit 16050027 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2016-09-06 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-09-06 |
Time |
18:26 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-09-06 |
Time |
14:46 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2016-06-29 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-06-29 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-06-28 |
Time |
18:12 |
Sent To |
|
|
| Notes |
| 2016-06-29 09:30:23 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) PROVIDE A COMPLETE DESCRIPTION OF WORK ON THE PLANS. | | | INDICATE WHICH WINDOWS AND DOORS ARE TO BE REPLACED. | | | FBC 107.2.1 | | | | | | 2) THIS APPEARS TO BE A LEVEL 3 ALTERATION. PROVIDE A | | | FLOOR PLAN OF THE EXISTING BUILDING. FBC EXISTING | | | BUILDING 505 AND FBC 107.2.1 | | | | | | 3) SHOW COMPLIANCE WITH FBC ENERGY CONSERVATION SECTION | | | R101.4.3 BY SUBMITTING THE REQUIRED CONSTRUCTION | | | DOCUMENTS. FBC ENERGY CONSERVATION R101.5.1 | | | | | | 4) PROVIDE ADDITIONAL DETAILS ON THE STEEL COLUMN CAP | | | INCLUDING THE WELDS. FBC 107.2.1 | | | | | | 5) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS | | | FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3 | | | THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE | | | DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT | | | APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION | | | INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR EACH OF | | | THE DIFFERENT ROOFING MATERIALS, WINDOW/GLASS TYPES, | | | IMPACT PROTECTION DEVICES AND EXTERIOR DOOR TYPES. | | | | | | 6) ON SHEETS 3 AND 8, THE CONSTRUCTION TYPE SHOULD BE | | | V-B AND THE OCCUPANCY IS R-3 SINGLE FAMILY DWELLING. ON | | | SHEET 3 THE 2010 FBC EDITION OF THE CODE IS CITED AND | | | IT SHOULD BE THE 2014 FBC. | | | | | | 7) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT A | | | RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW | | | COMMENTS HAS BEEN ADDRESSED. | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2016-09-23 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-09-23 |
Time |
14:54 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-09-23 |
Time |
14:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2016-08-12 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-08-12 |
Time |
08:07 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-08-12 |
Time |
08:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2016-05-13 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-05-13 |
Time |
11:56 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-05-13 |
Time |
11:56 |
Sent To |
|
|
| Notes |
| 2016-05-13 12:00:59 | INITIAL ELECTRICAL PLAN REVIEW | | | | | | APPLICABLE CODES IN EFFECT: | | | FLORIDA RES BUILDING CODE 2014 5TH EDITION | | | FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH | | | EDITION | | | NFPA 70- 2011 | | | COMMENTS: | | | | | | 1. A PANEL BOARD MUST BE AT THE NEW DETACHED STRUCTURE | | | AND A GROUNDING ELECTRODE CONDUCTOR MUST BE SHOWN PER | | | E3607.3. SHOW PANEL LOCATION ON FLOOR PLAN OF DETACHED. | | | 2. PLEASE SHOW THE FEEDER CONDUCTOR SIZES AND EQUIPMENT | | | GROUNDING CONDUCTOR REQUIRED WITH THESE FEEDERS. FBC | | | 107.3.5 | | | 3. SHOW ONE LINE REFLECTING SERVICE AND DETACHED BEING | | | FED PER COMMENT ABOVE. FBC 107.3.5 | | | 4. PROVIDE GENERAL NOTES TO INDICATE REQUIREMENTS FOR | | | AFCI PROTECTION, TAMPER RESISTANT RECEPTACLES. FBC RES | | | E3902 E4002.14 | | | 5. FEEL FREE TO CONTACT ME SHOULD YOU HAVE ANY | | | QUESTIONS OR CONCERNS. | | | | | | VALENTINO PEREZ | | | ELECTRICAL PLANS EXAMINER II | | | 561-805-6717 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2016-09-23 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-08-26 |
Time |
10:04 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-08-26 |
Time |
10:04 |
Sent To |
|
|
| Notes |
| 2016-08-26 10:05:44 | GAS PLAN REVIEW | | | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE | | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | | PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT | | | SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE | | | SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE | | | FBC-R, SEC. G2404.3. | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER FBC-FUEL | | | GAS SEC. 301.3. | | | | | | GAS PERMIT APPLICATION REQUIREMENTS | | | | | | EFFECTIVE IMMEDIATELY THE FOLLOWING INFORMATION SHALL | | | BE SHOWN ON ALL GAS DRAWINGS SUBMITTED FOR PERMITTING | | | IN THE CITY OF WEST PALM BEACH: | | | | | | 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL | | | CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER | | | FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. | | | | | | 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL | | | PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS | | | STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. WPB | | | AMENDMENTS TO FBC SEC. 107.2.1. | | | | | | 3. TYPE OF GAS, (LP OR NATURAL). | | | | | | 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON | | | THE SYSTEM. REFER TO THE FBC-2014 FUEL GAS SECS. 401.8 | | | THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(37). | | | | | | 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, | | | (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING | | | AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? | | | USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE | | | SEC. 402.4.1. | | | | | | 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE | | | FBC-2014 FUEL GAS CODE SEC. 304. | | | | | | 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014 | | | FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 | | | PSI. | | | | | | 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND | | | TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE | | | SEC. 502 THRU 505. | | | | | | 9. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL | | | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA | | | 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 | | | | | | | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2016-06-30 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-06-30 |
Time |
08:15 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-06-30 |
Time |
08:15 |
Sent To |
|
|
| Notes |
| 2016-06-30 08:16:29 | GAS PLAN REVIEW | | | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE | | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | | PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT | | | SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE | | | SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE | | | FBC-R, SEC. G2404.3. | | | | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
2 |
Status |
P |
Date |
2016-09-13 |
|
|
Cont ID |
|
| Sent By |
destabro |
Date |
2016-09-13 |
Time |
13:23 |
Rev Time |
0.00 |
| Received By |
destabro |
Date |
2016-09-13 |
Time |
13:23 |
Sent To |
B |
|
| Notes |
| 2016-09-13 13:23:40 | 9/13/16 - SCOPE OF WORK UNCHANGED SINCE HPB APPROVAL | | | CASE NO.16-18 (APRIL 2016). DLE |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-05-17 |
|
|
Cont ID |
|
| Sent By |
destabro |
Date |
2016-05-17 |
Time |
12:25 |
Rev Time |
0.00 |
| Received By |
destabro |
Date |
2016-05-17 |
Time |
12:25 |
Sent To |
|
|
| Notes |
| 2016-05-17 12:32:53 | 5/17/16 - APPROVED BY HPB AT APRIL 26 (2016) MEETING, | | | CONDITIONS MET IN DESIGN SUBMISSION. ALUMINUM | | | REPLACEMENT WINDOWS SHALL BE CLEAR GLASS OR LOW-E | | | GLASS, BUT NOT TINTED GLASS; FRAMING ELEMENTS, | | | INCLUDING MUNTINS AND SASHES, WILL BE WHITE IN COLOR.- | | | DLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2016-09-20 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-09-20 |
Time |
13:09 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-09-16 |
Time |
12:32 |
Sent To |
|
|
| Notes |
| 2016-09-16 12:32:22 | ROUTED TO JORGE VALIDO |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-09-20 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-09-20 |
Time |
13:09 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-08-05 |
Time |
12:55 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-06-29 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-06-29 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-05-02 |
Time |
09:24 |
Sent To |
|
|
| Notes |
| 2016-05-03 09:24:57 | R07 - TRAVELING WITH 16050022 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2016-09-16 |
|
|
Cont ID |
|
| Sent By |
jvalido |
Date |
2016-09-16 |
Time |
17:06 |
Rev Time |
0.00 |
| Received By |
jvalido |
Date |
2016-09-16 |
Time |
17:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2016-06-07 |
|
|
Cont ID |
|
| Sent By |
jvalido |
Date |
2016-06-07 |
Time |
19:00 |
Rev Time |
0.00 |
| Received By |
jvalido |
Date |
2016-06-07 |
Time |
18:31 |
Sent To |
|
|
| Notes |
| 2016-06-07 19:00:22 | FLORIDA ENERGY CODE - FBC 2014 | | | | | | (1) HEAT LOAD CALCULATIONS SUBMITTED DO NOT MATCH UNITS | | | CAPACITY ON PLANS. CHECK CALCULATIONS AND MAKE | | | CORRECTIONS. | | | (2) PROVIDE AHRI | | | (3) PROVIDE CONDENSER TIE DOWN DETAIL |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2016-09-23 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-09-23 |
Time |
13:07 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-09-23 |
Time |
13:07 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2016-08-26 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-08-26 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-08-25 |
Time |
13:55 |
Sent To |
|
|
| Notes |
| 2016-08-26 10:23:48 | 1ST REVIEW | | | | | | | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | | | | PLUMBING COMMENTS: | | | | | | 1. WATER CLOSETS ARE NOT VENTED. FBC RES. P3101..2.1 | | | | | | 2. SHOWER SHALL CONNECT TO HORIZONTAL DRAIN SHOULD NOT | | | CONNECT TO VERTICAL STACK ABOVE LAVATORY. PER WPB | | | AMEND. TO FBC 107.2.1 | | | | | | 3. THE WASHING MACHINE TRAP SHALL BE 2IN. PER FBC RES. | | | TABLE P3201.7 | | | | | | 4. SHT. 3OF8 SHOWS TANKLESS HEATER NEAR NW CORNER OF | | | HOUSE SHT. 8OF8 SHOWS IT NEAR SE CORNER PLEASE CLARIFY. | | | PER WPB AMEND. TO FBC 107.2.1 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2016-05-05 |
|
|
Cont ID |
|
| Sent By |
gearl |
Date |
2016-05-05 |
Time |
12:20 |
Rev Time |
0.00 |
| Received By |
gearl |
Date |
2016-05-05 |
Time |
12:19 |
Sent To |
|
|
| Notes |
| 2016-05-05 12:21:17 | | | | | | | | | | | | | 1. WILL NEED GAS PERMIT FOR NEW TANKLESS W/H AND STOVE | | | HOOK-UP |
|
|