Plan Review Details - Permit 16041156
Plan Review Stops For Permit 16041156
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-05-09 Cont ID  
Sent By mgonzale Date 2016-05-09 Time   Rev Time 1.00
Received By mgonzale Date 2016-05-09 Time   Sent To Z
Notes
2016-05-09 10:42:20DRIVEWAY SHALL BE 10' WIDE FOR EACH MAX. WITH 3'
 FLARES.
  
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-05-23 Cont ID  
Sent By gdorsan Date 2016-05-23 Time 10:47 Rev Time 0.00
Received By gdorsan Date 2016-04-26 Time 08:28 Sent To  
Notes
2016-04-27 08:28:53ROUTED TO ZONING

Review Stop Z ZONING
Rev No 1 Status P Date 2016-05-12 Cont ID  
Sent By njwira Date 2016-05-12 Time 14:06 Rev Time 0.00
Received By njwira Date 2016-05-12 Time 14:05 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved