Plan Review Details - Permit 16041000
Plan Review Stops For Permit 16041000
Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-05-19 Cont ID  
Sent By Mgonzale Date 2016-05-19 Time   Rev Time 1.00
Received By   Date 2016-05-19 Time   Sent To ENG
Notes
2016-05-19 10:45:04PASSED WITH PROVISOS:
  
 #1 AS OF DECEMBER 20, 2015 THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 #2 HORIZONTAL INSTALL OF BACKFLOWS ONLY. MUST
 COORDINATE PRE-CONSTRUCTION LOCATION AND INSTALLATION
 WITH UTILITY CUSTOMER.
 ( AREA WHERE BACKFLOWS WILL SIT APPEARS TO BE VERY
 SMALL THERFORE PLANNING THE METER ARRANGEMENT AND
 BACKFLOW PIPING WILL BE PARAMOUNT.)
  
 STEPHEN C. HUNTER
 CUSTOMER SERVICE SUPERVISOR
 PUBLIC UTILITIES DEPARTMENT
 FIELD CUSTOMER SERVICE
 1009 BANYAN BLVD.
 WEST PALM BEACH, FL 33401
 PHONE: 822-2240 EXT: 2242
 CELL: (561)644-7329
 FAX: 822-2259
 E-MAIL: [email protected]
  
 ***********************************
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-05-03 Cont ID  
Sent By wjolin Date 2016-05-03 Time 09:49 Rev Time 0.00
Received By wjolin Date 2016-05-03 Time 09:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-06-02 Cont ID  
Sent By lmarchan Date 2016-06-02 Time 15:10 Rev Time 0.00
Received By lmarchan Date 2016-04-25 Time 13:11 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2016-05-09 Cont ID  
Sent By ccole Date 2016-05-09 Time 09:17 Rev Time 0.00
Received By ccole Date 2016-05-09 Time 07:35 Sent To  
Notes
2016-05-09 09:21:54MECHANICAL PROVISO
 5/9/16
  
 1) MANUFACTURER'S SPECIFICATIONS FOR THE FIR LINE
 PIPING, FITTINGS, RESTRAINTS, VALVES, BACKFLOW
 PREVENTOR ETC. SHALL BE ON-SITE AT TIME OF INSPECTION.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved