| Plan Review Stops For Permit 16031217 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2016-04-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-04-26 |
Time |
09:47 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-04-26 |
Time |
09:40 |
Sent To |
|
|
| Notes |
| 2016-04-26 09:52:14 | RELOCATE EXISTING POOL HEATING EQUIPMENT. NOT A | | | SUBSTANTIAL IMPROVEMENT. |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2016-04-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-04-05 |
Time |
11:15 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-04-05 |
Time |
11:15 |
Sent To |
|
|
| Notes |
| 2016-04-05 11:43:28 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE POOL HEATING EQUIPMENT IS REQUIRED TO RESIST | | | WINDLOADS. SUBMIT POOL HEATER TIE DOWN DETAILS. FBCR - | | | M1307.2 | | | | | | 2) PROJECT IS LOCATED IN A SPECIAL FLOOD HAZARD AREA. | | | THE POOL HEATER IS REQUIRED TO BE INSTALLED AT OR ABOVE | | | 7.5' BFE. FBCR 322.1.6 | | | | | | 3) FBC 107.2.1 - INFORMATION ON CONSTRUCTION DOCUMENTS. | | | ALL INFORMATION, DRAWINGS, SPECIFICATIONS AND | | | ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE OF | | | THE PERSON RESPONSIBLE FOR THE DESIGN. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2016-04-26 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-04-26 |
Time |
09:44 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-04-26 |
Time |
09:44 |
Sent To |
|
|
| Notes |
| 2016-04-26 09:45:40 | EXISTING ELECTRIC POOL HEATER IS BEING RELOCATED. SEE | | | ELECTRICAL PERMIT #16030391 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2016-04-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-04-05 |
Time |
13:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-04-05 |
Time |
13:37 |
Sent To |
|
|
| Notes |
| 2016-04-05 11:49:59 | PLAN | | | REVIEW COMMENTS | | | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY ELECTRICAL | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) SUBMIT TWO COPIES OF ELECTRICAL LOAD CALCULATIONS TO | | | SHOW THAT THE EXISTING SEVICE IS ADEQUATE. FBCR - | | | E3602.2 THE PRINTED NAME AND SIGNATURE OF THE PERSON | | | RESPONSIBLE FOR THE CALCULATIONS IS REQUIRED TO BE ON | | | THE SUBMITTALS. FBC 107.2.1 | | | | | | 2) THE POOL HEATING EQUIPMENT IS REQUIRED TO BE | | | GROUNDED AND BONDED. FBCR - E4205.1, FBCR - E4204.2 | | | | | | 3) AN ELECTRICAL SUB-PERMIT IS REQUIRED TO INSTALL | | | POWER TO THE POOL HEATER. FBC 105.1 | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2016-04-04 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-04-04 |
Time |
05:25 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-04-04 |
Time |
05:25 |
Sent To |
|
|
| Notes |
| 2016-04-04 05:25:47 | THIS IS AN ELECTRIC POOL HEATER. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-04-27 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-04-27 |
Time |
05:37 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-04-14 |
Time |
14:43 |
Sent To |
|
|
| Notes |
| 2016-04-14 14:43:35 | RESUB ROUTED TO AJONES VIA ZONING INBOX |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-04-05 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-04-05 |
Time |
13:37 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-03-25 |
Time |
08:58 |
Sent To |
|
|
| Notes |
| 2016-03-25 08:59:00 | ROUTED TO ZONING |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2016-04-27 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-04-27 |
Time |
05:37 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-04-27 |
Time |
05:29 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2016-04-04 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-04-04 |
Time |
05:39 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-04-04 |
Time |
05:25 |
Sent To |
|
|
| Notes |
| 2016-04-04 05:39:50 | 1) A TIME SWITCH IS REQD. ON THE HEATER. 2014 | | | FBC-ENERGY SEC.R403.9.2 TIME SWITCHES. | | | TIME SWITCHES OR OTHER CONTROL METHOD THAT CAN | | | AUTOMATICALLY TURN OFF AND ON HEATERS AND PUMPS | | | ACCORDING TO A PRESET SCHEDULE SHALL BE INSTALLED ON | | | ALL HEATERS AND PUMPS. HEATERS, PUMPS AND MOTORS THAT | | | HAVE BUILT IN TIMERS SHALL BE DEEMED IN COMPLIANCE WITH | | | THIS REQUIREMENT. | | | | | | EXCEPTIONS: | | | | | | 1. WHERE PUBLIC HEALTH STANDARDS REQUIRE 24-HOUR PUMP | | | OPERATION. | | | | | | 2. WHERE PUMPS ARE REQUIRED TO OPERATE SOLAR- AND | | | WASTE-HEAT-RECOVERY POOL HEATING SYSTEMS. | | | | | | 3. WHERE PUMPS ARE POWERED EXCLUSIVELY FROM ON-SITE | | | RENEWABLE GENERATION. | | | | | | 2) A VAPOR RETARDANT POOL COVER IS REQD. PER 2014 | | | FBC-ENERGY SEC.R403.9.3. | | | 3) THE HEATER SHALL BE PROVIDED WITH A MEANS OF | | | RETAINING WATER IN THE HEATER WHEN THE PUMP IS NOT IN | | | OPERATION. | | | R4501.14.2 WATER RETENTION. | | | IF A HEATER IS NOT EQUIPPED OR DESIGNED FOR AN APPROVED | | | PERMANENT BYPASS OR ANTISIPHON DEVICE, AN APPROVED | | | PERMANENT BYPASS OR ANTISIPHON DEVICE SHALL BE | | | INSTALLED TO PROVIDE A POSITIVE MEANS OF RETAINING | | | WATER IN THE HEATER WHEN THE PUMP IS NOT IN OPERATION. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2016-04-21 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2016-04-21 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2016-04-21 |
Time |
14:30 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2016-03-31 |
|
|
Cont ID |
|
| Sent By |
ajones |
Date |
2016-03-31 |
Time |
15:37 |
Rev Time |
0.00 |
| Received By |
ajones |
Date |
2016-03-31 |
Time |
15:37 |
Sent To |
B |
|
| Notes |
| 2016-03-31 15:41:39 | 3-31-16- FAILED | | | | | | MECHANICAL EQUIPMENT. MECHANICAL EQUIPMENT MAY NOT | | | PROJECT MORE THAN FOUR FEET INTO A SETBACK. THE POOL | | | EQUIP. MUST BE 11 FEET FROM THE SIDE AND REAR PROPERTY | | | LINE. | | | ANGELLA JONES, AICP | | | 561-822-1441 | | | [email protected] | | | |
|
|