Plan Review Details - Permit 16030483
Plan Review Stops For Permit 16030483
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-04-26 Cont ID  
Sent By skennedy Date 2016-04-26 Time 11:00 Rev Time 0.00
Received By skennedy Date 2016-04-26 Time 11:00 Sent To  
Notes
2016-04-26 11:00:58REVIEW BY SHILL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-03-16 Cont ID  
Sent By shill Date 2016-03-16 Time 15:34 Rev Time 0.00
Received By shill Date 2016-03-16 Time 15:33 Sent To  
Notes
2016-03-16 15:35:33****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. DELEGATED ENGINEERING IS TO BE REVIEWED BY ENGINEER
 OF RECORD, FAC61G15.
  
 2. SEE "SIGNATURE" REVIEW FOR ADDITIONAL COMMENTS.
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-04-26 Cont ID  
Sent By skennedy Date 2016-04-26 Time 11:01 Rev Time 0.00
Received By skennedy Date 2016-04-25 Time 09:18 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-03-29 Cont ID  
Sent By cpuell Date 2016-03-29 Time 09:09 Rev Time 0.00
Received By cpuell Date 2016-03-14 Time 09:00 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2016-04-26 Cont ID  
Sent By skennedy Date 2016-04-26 Time 11:01 Rev Time 0.00
Received By skennedy Date 2016-04-26 Time 11:01 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2016-03-16 Cont ID  
Sent By shill Date 2016-03-16 Time 15:35 Rev Time 0.00
Received By shill Date 2016-03-16 Time 15:35 Sent To  
Notes
2016-03-16 15:39:58****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. THE DOCUMENTS SUBMITTED ARE SCANS OF ORIGINAL
 ENGINEERING. TO BE SUBMITTED DIGITALLY, THE PLANS
 SHOULD INCLUDE A DIGITAL SIGNATURE. IF PLANS DO NOT
 INCLUDE A DIGITAL SIGNATURE, PAPER BACKUP DOCUMENTATION
 IS REQUIRED. PLEASE BE ADVISED THAT A PAPER REVIEW OF
 SIGNATURE DOCUMENTS MAY TAKE A WEEK FOR REVIEW, AND IS
 DONE AT THE END OF THE REVIEW PROCESS.
  
 IF PAPER BACKUP DOCUMENTS ARE SUBMITTED RATHER THAN A
 DIGITAL SIGNATURE, ALL REVIEWS ARE TO BE IN "PASS"
 STATUS. AFTER ALL TRADES HAVE PASSED, THE CONTRACTOR IS
 TO SUBMIT THE PAPER DOCUMENTS AT THE FRONT COUNTER.
  
  

Review Stop Z ZONING
Rev No 1 Status P Date 2016-03-28 Cont ID  
Sent By eschneid Date 2016-03-28 Time 18:50 Rev Time 0.50
Received By eschneid Date 2016-03-28 Time 18:50 Sent To  
Notes
***NONE***